DALLAS CS (0918-47-148)

Items: 67

County: DALLAS
Length: N/A
Highway: CS
District: DALLAS
Control Number: 0918-47-148
DBE Goal: N/A
Project: BR 2018(785)
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $1,449,768.40
Date: 09/02/2021 (4 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (7)
E
Engineer's Estimate
$1,449,768.40
$1,766,278.50
Over/Under Est: 21.83% $316,510.10
Over/Under Est: 22.02% $319,231.60
Amt Left: 0.15% $2,721.50
Over/Under Est: 22.24% $322,382.10
Amt Left: 0.33% $5,872.00
Delta: -0.18% -$3,150.50
$1,849,242.00
Over/Under Est: 27.55% $399,473.60
Amt Left: 4.7% $82,963.50
Delta: -4.35% -$77,091.50
Over/Under Est: 28.52% $413,419.86
Amt Left: 5.49% $96,909.76
Delta: -0.75% -$13,946.26
Over/Under Est: 41.94% $607,999.51
Amt Left: 16.5% $291,489.41
Delta: -10.44% -$194,579.65
$2,157,806.00
Over/Under Est: 48.84% $708,037.60
Amt Left: 22.17% $391,527.50
Delta: -4.86% -$100,038.09

Bid Items & Bid Tabulations

67 Total 0 of 67
DALLAS  |  CS  |  DALLAS  |  0918-47-148  |  09/02/2021  |  $1,449,768.40  |  BR 2018(785)  |  REPLACE BRIDGE AND APPROACHES  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
ED BELL CONSTRUCTION COMPANY
HODGES AND SON CONSTRUCTION COMPANY, INC.
REBCON, INC.
MCMAHON CONTRACTING, L.P.
RAGLE CONSTRUCTION, INC.
IBCTX, LLC
PREPARING ROW
STA 4.550 $3,200.000 $37,000.000 $10,000.000 $4,500.000 $7,000.000 $4,020.190 $40,000.000 $11,000.000
REMOVING CONC (RIPRAP)
SY 601.000 $15.000 $6.500 $20.000 $20.000 $11.000 $51.120 $15.000 $22.000
RMV STAB BS & ASPH PAV(11.5"-22")
SY 874.000 $7.000 $20.000 $15.000 $15.000 $20.000 $22.630 $20.000 $33.000
EXCAVATION (ROADWAY)
CY 663.000 $15.000 $6.500 $21.000 $15.000 $21.000 $28.230 $29.500 $33.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 370.000 $14.000 $11.000 $21.000 $30.000 $22.000 $18.680 $16.000 $38.000
COMPOST MANUF TOPSOIL (4")
SY 612.000 $8.000 $8.400 $6.300 $4.000 $7.000 $11.030 $1.500 $2.000
BLOCK SODDING
SY 612.000 $4.000 $6.200 $6.300 $10.000 $4.000 $9.320 $7.200 $5.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 612.000 $0.500 $1.050 $0.250 $4.000 $1.000 $5.840 $5.000 $5.000
VEGETATIVE WATERING
MG 182.000 $28.000 $15.000 $25.000 $1.000 $45.000 $70.800 $45.000 $46.000
FL BS (CMP IN PLC)(TY D GR-1-2)(9")
SY 926.000 $14.000 $14.500 $25.000 $40.000 $24.000 $19.210 $20.000 $33.000
LIME (HYDRATED LIME (SLURRY))
TON 23.000 $230.000 $150.000 $225.000 $250.000 $175.000 $218.300 $185.000 $275.000
LIME TRT (EXST MATL) (12")
SY 926.000 $14.000 $7.000 $10.000 $10.000 $11.000 $4.740 $15.000 $28.000
PRIME COAT(MC-30 OR AE-P)
GAL 186.000 $12.000 $18.000 $5.000 $12.000 $4.000 $28.320 $24.000 $26.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 51.000 $112.000 $177.000 $75.000 $250.000 $100.000 $259.600 $170.000 $250.000
CEM STABIL BKFL
CY 114.000 $188.000 $115.000 $275.000 $250.000 $200.000 $217.730 $127.000 $240.000
TEMPORARY SPL SHORING
SF 480.000 $35.000 $70.000 $75.000 $45.000 $55.000 $282.020 $15.000 $1.000
DRILL SHAFT (18 IN)
LF 160.000 $100.000 $100.000 $125.000 $100.000 $150.000 $142.200 $120.000 $150.000
DRILL SHAFT (36 IN)
LF 1,182.000 $170.000 $210.000 $275.000 $180.000 $305.000 $263.920 $260.000 $275.000
CL C CONC (ABUT)(HPC)
CY 49.400 $1,000.000 $850.000 $1,200.000 $1,200.000 $1,050.000 $949.650 $1,100.000 $2,000.000
CL C CONC (CAP)(HPC)
CY 40.400 $1,000.000 $920.000 $1,050.000 $1,200.000 $1,250.000 $989.020 $1,400.000 $1,800.000
CL C CONC (COLUMN)(HPC)
CY 21.000 $1,000.000 $950.000 $1,550.000 $1,200.000 $1,250.000 $1,044.530 $1,300.000 $2,500.000
REINF CONC SLAB (HPC)
SF 6,782.000 $21.000 $18.000 $22.000 $25.000 $25.000 $26.090 $35.000 $30.000
APPROACH SLAB (HPC)
CY 86.400 $550.000 $525.000 $600.000 $800.000 $800.000 $547.440 $630.000 $900.000
PRESTR CONC GIRDER (TX28)
LF 921.000 $170.000 $160.000 $200.000 $195.000 $250.000 $186.690 $170.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,108.000 $110.000 $100.000 $115.000 $120.000 $175.000 $122.360 $120.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 16.000 $480.000 $530.000 $735.000 $450.000 $800.000 $765.940 $510.000 $1,500.000
RAIL (TY T223)(HPC)
LF 362.000 $105.000 $112.000 $125.000 $125.000 $100.000 $67.860 $110.000 $130.000
RAIL (TY T631LS)
LF 134.000 $70.000 $61.000 $58.000 $70.000 $64.000 $80.240 $58.000 $64.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 84.000 $98.000 $110.000 $100.000 $100.000 $140.000 $141.560 $102.000 $150.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $48,000.000 $137,200.000 $50,000.000 $65,000.000 $37,000.000 $38,510.350 $100,000.000 $40,000.000
REMOVE STR (RAIL)
LF 134.000 $35.000 $10.000 $10.000 $5.000 $29.000 $11.420 $9.860 $60.000
MOBILIZATION
LS 1.000 $128,161.000 $176,000.000 $120,983.100 $160,000.000 $87,000.000 $132,996.620 $200,000.000 $215,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $6,500.000 $10,000.000 $2,000.000 $3,500.000 $2,499.010 $12,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $36.000 $62.000 $30.000 $1.000 $31.000 $52.160 $28.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 60.000 $13.000 $20.000 $12.500 $1.000 $9.000 $23.600 $8.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 164.000 $18.000 $31.000 $10.000 $1.000 $24.000 $45.370 $22.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 164.000 $8.000 $10.000 $5.000 $1.000 $8.000 $23.600 $7.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,024.000 $3.000 $4.150 $1.600 $1.000 $2.500 $4.580 $2.200 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,024.000 $1.000 $1.000 $0.100 $1.000 $1.000 $1.360 $0.450 $1.000
CONSTRUCTING DETOURS
SY 249.000 $70.000 $75.000 $85.000 $200.000 $83.000 $66.080 $102.000 $110.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 8.000 $4,200.000 $4,500.000 $3,000.000 $4,500.000 $3,820.000 $3,422.000 $3,240.740 $4,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 900.000 $42.000 $27.000 $21.000 $80.000 $23.000 $70.340 $31.000 $60.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 900.000 $12.000 $10.000 $11.000 $20.000 $10.000 $10.590 $9.000 $30.000
MTL W-BEAM GD FEN (TIM POST)
LF 550.000 $22.000 $22.000 $22.500 $25.000 $23.000 $28.910 $21.000 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,600.000 $1,800.000 $2,500.000 $2,000.000 $1,870.000 $2,301.000 $1,700.000 $1,900.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $4.000 $2.750 $3.000 $2.000 $3.000 $2.360 $2.500 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $2,750.000 $2,800.000 $3,000.000 $2,915.000 $1,711.000 $2,650.000 $3,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $770.000 $1,000.000 $1,100.000 $1,000.000 $1,073.000 $3,186.000 $975.000 $1,100.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $840.000 $710.000 $1,000.000 $1,000.000 $825.000 $590.000 $750.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $8,300.000 $7,600.000 $10,000.000 $10,000.000 $8,523.000 $8,950.300 $7,748.000 $9,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $725.000 $575.000 $600.000 $600.000 $750.000 $625.400 $550.000 $660.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $700.000 $715.000 $750.000 $1,000.000 $750.000 $767.000 $650.000 $880.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $712.000 $870.000 $900.000 $1,000.000 $750.000 $920.400 $875.000 $990.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $24.000 $21.000 $22.500 $30.000 $22.000 $23.600 $20.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 12.000 $22.000 $26.000 $27.500 $30.000 $28.000 $24.780 $25.000 $27.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,269.000 $1.500 $1.550 $1.200 $1.500 $6.000 $2.060 $1.630 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $12.000 $9.000 $7.200 $7.000 $11.000 $17.700 $9.630 $8.000
PAVEMENT SEALER 4"
LF 620.000 $0.770 $0.350 $0.300 $0.500 $2.000 $0.530 $0.370 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,910.000 $0.700 $1.550 $1.200 $1.500 $4.000 $1.710 $1.630 $2.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,910.000 $1.250 $1.550 $1.200 $1.500 $4.000 $1.710 $1.630 $2.000
REFL PAV MRKR TY II-A-A
EA 24.000 $5.000 $8.400 $7.200 $7.000 $6.000 $11.800 $8.890 $7.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,000.000 $1.000 $1.400 $1.100 $1.000 $2.000 $2.070 $1.480 $2.000
PAV SURF PREP FOR MRK (4")
LF 620.000 $0.250 $0.440 $0.350 $0.500 $1.000 $1.180 $0.440 $1.000
SP MIXES SP-C SAC-B PG64-22
TON 204.000 $110.000 $186.000 $200.000 $250.000 $204.000 $248.690 $181.000 $240.000
TACK COAT
GAL 55.000 $6.000 $3.750 $3.500 $10.000 $4.000 $3.660 $3.500 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $12,000.000 $9,500.000 $12,000.000 $8,000.000 $7,080.000 $5,000.000 $25,000.000
TMA (MOBILE OPERATION)
DAY 1.000 $475.000 $500.000 $800.000 $1,000.000 $1,000.000 $3,540.000 $211.000 $5,000.000
Totals: $1,449,768.400 $1,766,278.500 $1,769,000.000 $1,772,150.500 $1,849,242.000 $1,863,188.278 $2,057,767.910 $2,157,806.000