Show Job Controls
Bid Cobra

DALLAS CS (0918-47-128)

Items: 110

County: DALLAS
Length: N/A
Highway: CS
District: DALLAS
Control Number: 0918-47-128
DBE Goal: N/A
Project: STP 2018(739)HES
Guaranty: N/A
Time: 160 WORKING DAYS
Engineer's Estimate: $1,277,016.75
Date: 04/03/2018 (8 years ago)
Contract Number: N/A
Type: INSTALLATION OF TRAFFIC SIGNALS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,277,016.75
$1,340,240.00
Over/Under Est: 4.95% $63,223.25
Over/Under Est: 14.26% $182,132.65
Amt Left: 8.87% $118,909.40

Bid Items & Bid Tabulations

110 Total 0 of 110
DALLAS  |  CS  |  DALLAS  |  0918-47-128  |  04/03/2018  |  $1,277,016.75  |  STP 2018(739)HES  |  INSTL OF TRAF SIG  |  160 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURABLE SPECIALTIES, INC.
ED BELL CONSTRUCTION COMPANY
REMOVING CONC (PAV)
SY 314.000 $50.000 $50.000 $42.000
REMOVING CONC (SIDEWALKS)
SY 13.000 $50.000 $50.000 $31.500
REMOVING CONC (CURB)
LF 247.000 $10.000 $10.000 $10.500
REMOVING CONC (PAVERS)
SY 4.000 $25.000 $25.000 $73.500
REMOVING STAB BASE AND ASPH PAV (3")
SY 45.000 $75.000 $30.000 $52.500
EXCAVATION (ROADWAY)
CY 195.000 $50.000 $45.000 $31.500
BLOCK SODDING
SY 23.000 $15.000 $25.000 $52.500
VEGETATIVE WATERING
MG 0.100 $200.000 $1,100.000 $5,250.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 205.000 $40.000 $5.000 $210.000
PRIME COAT (MC-30)
GAL 7.000 $90.000 $25.000 $7.350
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
TON 6.000 $1,000.000 $250.000 $420.000
CONC PVMT (CONT REINF)(FAST TRK)(12")
SY 247.000 $200.000 $55.000 $189.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 22.000 $230.000 $250.000 $201.400
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 156.000 $250.000 $275.000 $222.600
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 132.000 $285.000 $315.000 $349.800
RIPRAP (CONC)(4 IN)
CY 2.000 $600.000 $750.000 $1,365.000
ADJUSTING MANHOLES
EA 4.000 $800.000 $900.000 $2,100.000
MOBILIZATION
LS 1.000 $106,166.000 $125,400.000 $175,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $6,000.000 $6,400.000 $21,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 330.000 $5.000 $3.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 330.000 $1.000 $1.000 $2.000
CONC CURB (TY II)
LF 331.000 $25.000 $30.000 $21.000
CONC CURB & GUTTER (TY II)
LF 36.000 $100.000 $40.000 $73.500
CONC SIDEWALKS (6")
SY 267.000 $100.000 $55.000 $105.000
CURB RAMPS (TY 5)
EA 12.000 $2,250.000 $2,700.000 $3,000.000
CURB RAMPS (TY 6)
EA 6.000 $2,500.000 $2,400.000 $3,000.000
CURB RAMPS (TY 22)
EA 2.000 $3,000.000 $3,500.000 $3,000.000
CONCRETE MEDIAN (NOSE)
SY 2.000 $270.000 $120.000 $525.000
CONC MEDIAN(MONO NOSE)
SY 43.000 $200.000 $150.000 $315.000
CONDT (PVC) (SCH 40) (2")
LF 210.000 $9.000 $10.000 $5.300
CONDT (PVC) (SCH 40) (2") (BORE)
LF 110.000 $20.000 $22.000 $13.780
CONDT (PVC) (SCH 40) (3")
LF 405.000 $10.000 $11.000 $7.420
CONDT (PVC) (SCH 40) (4")
LF 190.000 $14.000 $12.000 $7.420
CONDT (PVC) (SCH 40) (4") (BORE)
LF 2,160.000 $25.000 $26.000 $21.200
CONDT (PVC) (SCH 80) (2")
LF 50.000 $10.000 $10.000 $6.360
ELEC CONDR (NO.12) INSULATED
LF 400.000 $1.000 $1.000 $0.530
ELEC CONDR (NO.8) INSULATED
LF 1,300.000 $1.100 $1.000 $0.850
ELEC CONDR (NO.6) BARE
LF 2,980.000 $1.150 $2.000 $0.850
ELEC CONDR (NO.6) INSULATED
LF 440.000 $1.200 $2.000 $0.950
GROUND BOX TY C (162911)W/APRON
EA 22.000 $900.000 $980.000 $954.000
REMOVE GROUND BOX
EA 38.000 $175.000 $200.000 $127.200
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 5.000 $5,250.000 $7,000.000 $4,346.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $600.000 $825.000 $438.840
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $150.000 $31.800
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 4,025.000 $1.000 $1.000 $0.890
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 3,405.000 $4.000 $3.000 $3.290
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 855.000 $7.000 $6.000 $5.510
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
EA 11.000 $30.000 $40.000 $37.100
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
LF 65.000 $1.150 $2.000 $0.890
PAVEMENT SEALER 4"
LF 7,920.000 $0.500 $0.200 $0.160
PAVEMENT SEALER 8"
LF 4,090.000 $0.500 $0.500 $0.530
PAVEMENT SEALER 12"
LF 3,405.000 $1.000 $1.000 $0.800
PAVEMENT SEALER 24"
LF 855.000 $2.000 $3.000 $1.860
PAVEMENT SEALER (ARROW)
EA 42.000 $25.000 $24.000 $37.100
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $50.000 $35.000 $74.200
PAVEMENT SEALER (YLD TRI)
EA 11.000 $10.000 $2.000 $26.500
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 3,075.000 $0.750 $1.000 $1.060
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 3,225.000 $0.750 $1.000 $1.060
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 1,620.000 $0.750 $1.000 $1.060
PREFAB PAV MRK TY C (W) (ARROW)
EA 42.000 $225.000 $290.000 $185.500
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $425.000 $410.000 $318.000
REFL PAV MRKR TY II-A-A
EA 108.000 $3.500 $5.000 $3.820
REFL PAV MRKR TY II-C-R
EA 615.000 $3.500 $5.000 $3.820
ELIM EXT PAV MRK & MRKS (6")
LF 2,842.000 $1.000 $1.000 $1.060
ELIM EXT PAV MRK & MRKS (12")
LF 1,325.000 $2.250 $1.500 $1.060
ELIM EXT PAV MRK & MRKS (24")
LF 2,043.000 $4.000 $3.000 $1.060
ELIM EXT PAV MRK & MRKS (ARROW)
EA 10.000 $50.000 $35.000 $42.400
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 2.000 $80.000 $40.000 $63.600
PAV SURF PREP FOR MRK (4")
LF 6,300.000 $0.200 $0.100 $0.050
PAV SURF PREP FOR MRK (8")
LF 4,025.000 $0.200 $0.100 $0.110
PAV SURF PREP FOR MRK (12")
LF 3,405.000 $0.500 $0.500 $0.530
PAV SURF PREP FOR MRK (24")
LF 855.000 $1.000 $1.000 $1.060
PAV SURF PREP FOR MRK (ARROW)
EA 42.000 $15.000 $12.000 $21.200
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $20.000 $18.000 $42.400
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 11.000 $4.000 $1.000 $15.900
PAV SURF PREP FOR MRK (RPM)
EA 375.000 $2.000 $0.100 $0.270
REMOVING TRAFFIC SIGNALS
EA 5.000 $4,500.000 $8,500.000 $3,710.000
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 5.000 $12,000.000 $12,000.000 $6,360.000
VEH SIG SEC (12")LED(GRN)
EA 52.000 $300.000 $300.000 $265.000
VEH SIG SEC (12")LED(GRN ARW)
EA 18.000 $300.000 $300.000 $265.000
VEH SIG SEC (12")LED(YEL)
EA 52.000 $300.000 $300.000 $265.000
VEH SIG SEC (12")LED(YEL ARW)
EA 36.000 $300.000 $300.000 $265.000
VEH SIG SEC (12")LED(RED)
EA 52.000 $300.000 $300.000 $265.000
VEH SIG SEC (12")LED(RED ARW)
EA 36.000 $300.000 $300.000 $265.000
PED SIG SEC (LED)(COUNTDOWN)
EA 40.000 $700.000 $700.000 $291.500
BACK PLATE (12")(3 SEC)ALUM
EA 52.000 $90.000 $125.000 $106.000
BACK PLATE (12")(5 SEC)ALUM
EA 18.000 $130.000 $140.000 $106.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,450.000 $1.000 $1.000 $1.590
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 1,255.000 $1.250 $1.000 $2.010
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 1,690.000 $2.500 $2.000 $2.230
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 2,770.000 $3.250 $4.000 $4.240
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 5,755.000 $1.000 $1.000 $1.590
INS TRF SIG PL AM (S)1 ARM(20')
EA 2.000 $4,000.000 $4,202.000 $3,710.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 1.000 $5,250.000 $6,500.000 $5,830.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $7,000.000 $8,360.000 $7,526.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 2.000 $8,000.000 $8,700.000 $7,950.000
INS TRF SIG PL AM(S)1 ARM(48')
EA 4.000 $6,500.000 $8,400.000 $7,208.000
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 4.000 $8,000.000 $9,000.000 $8,692.000
INS TRF SIG PL AM(S)1 ARM(50')
EA 1.000 $16,000.000 $19,450.000 $17,914.000
INS TRF SIG PL AM(S)1 ARM(55')
EA 1.000 $15,000.000 $21,585.000 $18,232.000
INS TRF SIG PL AM(S)1 ARM(60')
EA 2.000 $15,000.000 $21,800.000 $19,080.000
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 2.000 $17,000.000 $22,950.000 $21,942.000
PED POLE ASSEMBLY
EA 13.000 $2,000.000 $2,200.000 $1,272.000
PED DETECT PUSH BUTTON (APS)
EA 40.000 $750.000 $900.000 $530.000
PED DETECTOR CONTROLLER UNIT
EA 5.000 $3,000.000 $1,800.000 $3,710.000
TREE TRIMMING
MI 0.100 $1,500.000 $5,000.000 $52,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 50.000 $100.000 $80.000 $132.000
RADAR PRESENCE DETECTOR
EA 20.000 $6,250.000 $7,000.000 $5,300.000
RADAR PRESENCE DETECTOR COMM CABLE
LF 3,170.000 $3.250 $3.000 $3.180
TMA (STATIONARY)
DAY 30.000 $500.000 $130.000 $250.000
Totals: $1,277,016.750 $1,340,240.000 $1,459,149.400