PREPARING ROW
|
STA
|
12.000
|
$3,500.000
|
$24,030.000
|
$6,000.000
|
$2,500.000
|
$20,000.000
|
$6,300.000
|
|
|
REMOVING CONC (PAV)
|
CY
|
423.000
|
$50.000
|
$49.000
|
$30.000
|
$40.000
|
$50.000
|
$63.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
206.000
|
$20.000
|
$14.000
|
$20.000
|
$25.000
|
$10.500
|
$21.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
215.000
|
$18.000
|
$4.800
|
$5.000
|
$10.000
|
$4.000
|
$11.550
|
|
|
REMOVE CONC (WINGWALL)
|
CY
|
32.000
|
$600.000
|
$110.000
|
$44.000
|
$500.000
|
$125.000
|
$630.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
44.000
|
$50.000
|
$19.000
|
$13.000
|
$100.000
|
$13.500
|
$31.500
|
|
|
REMOVING CONC (FLUME)
|
SY
|
16.000
|
$25.000
|
$32.000
|
$22.000
|
$25.000
|
$13.000
|
$42.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (3")
|
SY
|
1,797.000
|
$14.000
|
$3.900
|
$11.000
|
$10.000
|
$10.000
|
$12.600
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
911.000
|
$16.000
|
$4.400
|
$11.000
|
$10.000
|
$6.400
|
$14.700
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,496.000
|
$16.000
|
$18.000
|
$26.000
|
$10.000
|
$40.000
|
$21.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
751.000
|
$22.000
|
$5.500
|
$12.000
|
$30.000
|
$11.400
|
$52.500
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
95.000
|
$33.000
|
$44.000
|
$33.000
|
$180.000
|
$125.000
|
$210.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
3,565.000
|
$2.000
|
$1.200
|
$3.000
|
$5.000
|
$2.200
|
$1.070
|
|
|
BLOCK SODDING
|
SY
|
452.000
|
$8.000
|
$4.100
|
$20.000
|
$5.000
|
$13.000
|
$7.460
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
3,565.000
|
$0.700
|
$0.200
|
$1.000
|
$1.000
|
$0.300
|
$0.320
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
3,565.000
|
$0.600
|
$0.150
|
$1.000
|
$1.000
|
$0.290
|
$0.310
|
|
|
VEGETATIVE WATERING
|
MG
|
1,036.900
|
$20.000
|
$20.000
|
$88.000
|
$10.000
|
$23.000
|
$1.050
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
1,140.000
|
$25.000
|
$13.000
|
$55.000
|
$18.000
|
$18.000
|
$21.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
1,249.000
|
$18.500
|
$11.000
|
$55.000
|
$25.000
|
$13.000
|
$18.900
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
23.000
|
$178.000
|
$190.000
|
$206.000
|
$180.000
|
$152.000
|
$189.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
1,974.000
|
$4.000
|
$5.500
|
$12.800
|
$6.000
|
$6.500
|
$6.300
|
|
|
PRIME COAT (MC-30)
|
GAL
|
591.800
|
$10.000
|
$8.500
|
$8.300
|
$10.000
|
$8.050
|
$8.570
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
135.000
|
$80.000
|
$170.000
|
$165.000
|
$180.000
|
$160.000
|
$170.400
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
|
TON
|
325.000
|
$140.000
|
$120.000
|
$113.000
|
$180.000
|
$110.000
|
$117.150
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
608.000
|
$70.000
|
$81.000
|
$75.750
|
$150.000
|
$70.000
|
$105.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
155.000
|
$25.000
|
$75.000
|
$55.000
|
$15.000
|
$18.000
|
$15.750
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
40.000
|
$26.000
|
$11.000
|
$1.000
|
$10.000
|
$1.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,320.000
|
$33.000
|
$51.000
|
$1.000
|
$75.000
|
$25.500
|
$33.960
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
2,144.000
|
$130.000
|
$91.000
|
$200.000
|
$180.000
|
$110.000
|
$157.500
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
46.000
|
$1,000.000
|
$740.000
|
$1,000.000
|
$950.000
|
$1,000.000
|
$2,100.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
54.000
|
$1,000.000
|
$1,300.000
|
$1,000.000
|
$1,100.000
|
$1,700.000
|
$2,100.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
20.700
|
$1,000.000
|
$1,300.000
|
$1,000.000
|
$1,000.000
|
$1,900.000
|
$3,150.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(HPC)
|
SF
|
8,914.000
|
$15.500
|
$11.000
|
$16.000
|
$18.000
|
$25.000
|
$31.500
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
2,240.000
|
$16.000
|
$8.000
|
$15.000
|
$10.000
|
$8.000
|
$13.650
|
|
|
APPROACH SLAB (HPC)
|
CY
|
136.000
|
$500.000
|
$430.000
|
$500.000
|
$500.000
|
$450.000
|
$630.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
1,888.000
|
$155.000
|
$150.000
|
$130.000
|
$146.000
|
$150.000
|
$210.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
236.000
|
$175.000
|
$160.000
|
$130.000
|
$146.000
|
$150.000
|
$315.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
162.000
|
$350.000
|
$380.000
|
$450.000
|
$500.000
|
$50.000
|
$630.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
655.000
|
$130.000
|
$110.000
|
$156.000
|
$180.000
|
$113.000
|
$115.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
52.000
|
$475.000
|
$390.000
|
$500.000
|
$450.000
|
$450.000
|
$630.000
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
385.000
|
$15.000
|
$11.000
|
$24.000
|
$60.000
|
$18.500
|
$15.750
|
|
|
RAIL (TY T223)
|
LF
|
175.000
|
$115.000
|
$92.000
|
$100.000
|
$126.000
|
$86.000
|
$105.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
264.000
|
$115.000
|
$87.000
|
$100.000
|
$130.000
|
$86.000
|
$126.000
|
|
|
RAIL (TY C223)(HPC)
|
LF
|
264.000
|
$115.000
|
$110.000
|
$120.000
|
$116.000
|
$107.000
|
$168.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
155.000
|
$90.000
|
$78.000
|
$90.000
|
$100.000
|
$78.000
|
$52.500
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
33.000
|
$290.000
|
$160.000
|
$402.000
|
$250.000
|
$324.000
|
$362.020
|
|
|
GABION (1.5' X 3')(GALV)
|
CY
|
3.000
|
$280.000
|
$230.000
|
$1,045.000
|
$1,000.000
|
$324.000
|
$697.240
|
|
|
CONC BOX CULV (12 FT X 12 FT)
|
LF
|
70.000
|
$750.000
|
$1,400.000
|
$2,400.000
|
$2,192.000
|
$1,675.000
|
$1,575.000
|
|
|
WINGWALL (PW - 1) (HW=15 FT)
|
EA
|
2.000
|
$62,000.000
|
$22,100.000
|
$30,000.000
|
$59,658.000
|
$44,600.000
|
$42,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,900.000
|
$11,121.450
|
$10,000.000
|
$1,000.000
|
$1,000.000
|
$2,520.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
54.000
|
$300.000
|
$935.000
|
$250.000
|
$200.000
|
$210.000
|
$252.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$20,000.000
|
$91,410.000
|
$30,000.000
|
$30,000.000
|
$60,000.000
|
$63,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$228,681.540
|
$288,365.000
|
$200,000.000
|
$300,000.000
|
$324,700.000
|
$772,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$3,000.000
|
$6,300.000
|
$5,000.000
|
$3,000.000
|
$25,000.000
|
$9,450.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
10.000
|
$35.000
|
$40.000
|
$143.000
|
$60.000
|
$75.000
|
$79.880
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
10.000
|
$12.000
|
$11.000
|
$30.500
|
$10.000
|
$50.000
|
$53.250
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
310.000
|
$25.000
|
$20.000
|
$39.000
|
$35.000
|
$19.250
|
$20.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
310.000
|
$11.000
|
$6.500
|
$14.300
|
$10.000
|
$10.000
|
$10.650
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,571.000
|
$2.500
|
$1.900
|
$4.500
|
$4.000
|
$1.550
|
$1.650
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,571.000
|
$0.750
|
$0.600
|
$1.350
|
$1.000
|
$0.450
|
$0.480
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
20.000
|
$6.000
|
$4.900
|
$6.000
|
$5.000
|
$6.000
|
$6.390
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
20.000
|
$2.000
|
$1.200
|
$1.600
|
$1.000
|
$1.500
|
$1.600
|
|
|
CONSTRUCTING DETOURS
|
SY
|
468.000
|
$125.000
|
$72.000
|
$55.000
|
$350.000
|
$70.000
|
$84.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
160.000
|
$50.000
|
$58.000
|
$100.000
|
$78.000
|
$80.000
|
$21.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$65.000
|
$60.000
|
$100.000
|
$77.000
|
$80.000
|
$94.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
60.000
|
$9.000
|
$15.000
|
$25.000
|
$30.000
|
$20.000
|
$21.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$12.000
|
$16.000
|
$25.000
|
$30.000
|
$20.000
|
$21.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
160.000
|
$12.000
|
$13.000
|
$30.000
|
$30.000
|
$12.000
|
$21.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$15.000
|
$13.000
|
$30.000
|
$30.000
|
$12.000
|
$21.000
|
|
|
CONC CURB (TY II)
|
LF
|
241.000
|
$32.000
|
$26.000
|
$28.350
|
$25.000
|
$11.000
|
$6.300
|
|
|
DRIVEWAYS (ACP)
|
SY
|
76.000
|
$45.000
|
$89.000
|
$125.000
|
$45.000
|
$125.000
|
$128.560
|
|
|
CONC SIDEWALKS (4")
|
SY
|
150.000
|
$55.000
|
$55.000
|
$60.250
|
$100.000
|
$40.000
|
$63.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
4.000
|
$1,600.000
|
$1,800.000
|
$2,035.000
|
$1,500.000
|
$1,170.000
|
$2,100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
350.000
|
$20.000
|
$20.000
|
$19.000
|
$19.000
|
$19.000
|
$23.430
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,450.000
|
$1,500.000
|
$1,530.000
|
$1,475.000
|
$1,410.000
|
$2,092.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$900.000
|
$750.000
|
$940.000
|
$750.000
|
$700.000
|
$958.500
|
|
|
SHORT RADIUS
|
LF
|
38.000
|
$33.000
|
$26.000
|
$32.000
|
$29.000
|
$24.000
|
$29.820
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$730.000
|
$540.000
|
$780.000
|
$925.000
|
$500.000
|
$745.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,000.000
|
$980.000
|
$1,155.000
|
$995.000
|
$910.000
|
$958.500
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$600.000
|
$650.000
|
$800.000
|
$700.000
|
$600.000
|
$1,065.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
99.000
|
$3.500
|
$1.600
|
$5.200
|
$12.000
|
$1.500
|
$5.330
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$200.000
|
$130.000
|
$260.000
|
$500.000
|
$120.000
|
$266.250
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,150.000
|
$2,100.000
|
$2,215.000
|
$2,500.000
|
$1,980.000
|
$2,236.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$600.000
|
$820.000
|
$560.000
|
$35.000
|
$700.000
|
$1,065.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
1.000
|
$60.000
|
$54.000
|
$56.500
|
$39.000
|
$50.000
|
$53.250
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
5.000
|
$23.000
|
$22.000
|
$23.700
|
$37.000
|
$20.000
|
$31.950
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
8.000
|
$35.000
|
$22.000
|
$23.700
|
$37.000
|
$20.000
|
$31.950
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
8.000
|
$21.000
|
$22.000
|
$23.700
|
$85.000
|
$20.000
|
$31.950
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
3.000
|
$67.000
|
$54.000
|
$57.700
|
$85.000
|
$50.000
|
$159.750
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
2.000
|
$220.000
|
$270.000
|
$118.500
|
$85.000
|
$250.000
|
$159.750
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
1.000
|
$200.000
|
$270.000
|
$118.500
|
$100.000
|
$250.000
|
$159.750
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
2.000
|
$35.000
|
$26.000
|
$32.200
|
$75.000
|
$24.000
|
$31.950
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
72.000
|
$4.000
|
$5.000
|
$5.150
|
$5.000
|
$5.000
|
$5.330
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
16,218.000
|
$0.850
|
$0.650
|
$0.660
|
$0.640
|
$0.640
|
$0.680
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
137.000
|
$7.000
|
$8.500
|
$8.250
|
$8.000
|
$8.000
|
$8.520
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
29,940.000
|
$0.850
|
$0.650
|
$0.650
|
$0.640
|
$0.640
|
$0.680
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
36.000
|
$1.860
|
$1.100
|
$1.050
|
$1.000
|
$1.000
|
$1.070
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,157.000
|
$1.000
|
$1.100
|
$1.050
|
$1.000
|
$1.000
|
$1.070
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
503.000
|
$3.500
|
$3.500
|
$3.400
|
$3.300
|
$3.300
|
$3.510
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
107.000
|
$7.000
|
$5.500
|
$5.450
|
$5.300
|
$5.300
|
$5.640
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$100.000
|
$130.000
|
$124.000
|
$120.000
|
$120.000
|
$127.800
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$130.000
|
$170.000
|
$165.000
|
$160.000
|
$160.000
|
$170.400
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
429.000
|
$5.500
|
$5.500
|
$5.500
|
$5.300
|
$5.300
|
$5.640
|
|
|
PAVEMENT SEALER 4"
|
LF
|
36,928.000
|
$0.300
|
$0.150
|
$0.130
|
$0.120
|
$0.120
|
$0.130
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,193.000
|
$0.500
|
$0.250
|
$0.300
|
$0.250
|
$0.250
|
$0.270
|
|
|
PAVEMENT SEALER 12"
|
LF
|
503.000
|
$0.950
|
$2.100
|
$2.100
|
$2.000
|
$2.000
|
$2.130
|
|
|
PAVEMENT SEALER 24"
|
LF
|
427.000
|
$1.500
|
$3.100
|
$3.100
|
$3.000
|
$3.000
|
$3.200
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
6.000
|
$27.000
|
$26.000
|
$26.000
|
$25.000
|
$25.000
|
$26.630
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
6.000
|
$33.000
|
$52.000
|
$52.000
|
$50.000
|
$50.000
|
$53.250
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,890.000
|
$0.550
|
$0.500
|
$0.520
|
$0.500
|
$0.500
|
$0.530
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
16,829.000
|
$0.550
|
$0.400
|
$0.410
|
$0.400
|
$0.400
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
240.000
|
$0.550
|
$0.500
|
$0.520
|
$0.500
|
$0.500
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
17,363.000
|
$0.550
|
$0.400
|
$0.410
|
$0.400
|
$0.400
|
$0.430
|
|
REFL PAV MRKR TY I-C
|
EA
|
204.000
|
$4.400
|
$4.200
|
$4.150
|
$4.000
|
$4.000
|
$4.260
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
188.000
|
$5.000
|
$4.200
|
$4.150
|
$4.000
|
$4.000
|
$4.260
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
18,954.000
|
$1.000
|
$0.450
|
$0.460
|
$0.450
|
$0.450
|
$0.480
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
36,928.000
|
$0.300
|
$0.050
|
$0.040
|
$0.100
|
$0.040
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,193.000
|
$0.500
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
503.000
|
$0.650
|
$0.500
|
$0.520
|
$0.500
|
$0.500
|
$0.530
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
427.000
|
$1.300
|
$1.100
|
$1.030
|
$1.000
|
$1.000
|
$1.070
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$20.000
|
$21.000
|
$20.600
|
$20.000
|
$20.000
|
$21.300
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$23.000
|
$21.000
|
$30.900
|
$30.000
|
$30.000
|
$31.950
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$45,000.000
|
$18,000.000
|
$34,000.000
|
$15,000.000
|
$22,216.480
|
$33,278.510
|
|
|
8" PVC WATER PIPE
|
LF
|
240.000
|
$105.000
|
$130.000
|
$98.000
|
$15.000
|
$150.000
|
$210.000
|
|
|
CAST IRON FITTINGS
|
TON
|
2.000
|
$1,000.000
|
$2,600.000
|
$3,605.000
|
$5,000.000
|
$1,000.000
|
$1,000.000
|
|
|
WATER SERVICE
|
EA
|
2.000
|
$2,500.000
|
$2,600.000
|
$1,545.000
|
$1,500.000
|
$1,400.000
|
$1,000.000
|
|
|
8" GATE VALVE
|
EA
|
1.000
|
$1,400.000
|
$2,000.000
|
$2,320.000
|
$1,000.000
|
$1,135.000
|
$1,000.000
|
|
|
8" WATER MAIN CROSSING (BY OPEN CUT)
|
LF
|
20.000
|
$180.000
|
$660.000
|
$515.000
|
$200.000
|
$300.000
|
$100.000
|
|
|
CUT AND PLUG EXISTING WATER MAIN
|
EA
|
1.000
|
$500.000
|
$870.000
|
$1,030.000
|
$1,500.000
|
$750.000
|
$100.000
|
|
|
CUT AND PLUG WATER MAIN FOR TEST
|
EA
|
1.000
|
$750.000
|
$870.000
|
$515.000
|
$1,500.000
|
$750.000
|
$100.000
|
|
|
BLOCK SOD
|
SY
|
210.000
|
$8.000
|
$4.000
|
$15.500
|
$10.000
|
$8.000
|
$1.000
|
|
|
TRENCH EXCAVATION SAFETY & SUPPORT
|
LF
|
240.000
|
$2.000
|
$36.000
|
$10.300
|
$50.000
|
$1.000
|
$1.000
|
|
|
ROCK FOUNDATION
|
CY
|
5.000
|
$45.000
|
$260.000
|
$93.000
|
$600.000
|
$60.000
|
$10.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
20.000
|
$150.000
|
$230.000
|
$150.000
|
$200.000
|
$200.000
|
$100.000
|
|
|
SAND BACKFILL
|
CY
|
5.000
|
$25.000
|
$160.000
|
$37.250
|
$10.000
|
$60.000
|
$10.000
|
|
|
CEMENT STABILIZED BASE BACKFILL
|
CY
|
60.000
|
$90.000
|
$230.000
|
$67.000
|
$180.000
|
$110.000
|
$100.000
|
|
|
CLASS "B" CONCRETE
|
CY
|
70.000
|
$150.000
|
$260.000
|
$257.500
|
$500.000
|
$250.000
|
$100.000
|
|
|
RIP RAP
|
SY
|
12.000
|
$160.000
|
$84.000
|
$186.000
|
$1,000.000
|
$550.000
|
$10.000
|
|
|
DSPL HVY CHLRN WTR MN FLSH WTR
|
EA
|
1.000
|
$5,000.000
|
$3,800.000
|
$2,060.000
|
$5,000.000
|
$2,000.000
|
$100.000
|
|
|
CST SURVEYING & STAKING (WATER & WW)
|
LF
|
240.000
|
$2.000
|
$10.000
|
$10.300
|
$50.000
|
$3.400
|
$1.000
|
|
|
ADJUST AND/OR RELOCATE WATER METER BOX
|
EA
|
2.000
|
$300.000
|
$710.000
|
$1,235.000
|
$1,000.000
|
$300.000
|
$100.000
|
|
|
ADJUST WTR VALVE COVERS & VALVE STACKS
|
EA
|
1.000
|
$300.000
|
$1,500.000
|
$258.000
|
$1,000.000
|
$250.000
|
$100.000
|
|
|
INVESTIGATION
|
EA
|
1.000
|
$700.000
|
$2,600.000
|
$4,635.000
|
$5,000.000
|
$450.000
|
$100.000
|
|
Totals: |
$2,638,156.950
|
$2,883,799.000
|
$2,990,247.510
|
$3,198,554.130
|
$3,298,078.750
|
$3,979,380.481
|