Show Job Controls
Bid Cobra

DALLAS VA (0918-00-333)

Items: 21

County: DALLAS
Length: N/A
Highway: VA
District: DALLAS
Control Number: 0918-00-333
DBE Goal: N/A
Project: C 918-00-333
Guaranty: N/A
Time: 160 WORKING DAYS
Engineer's Estimate: $918,295.12
Date: 02/03/2022 (4 years ago)
Contract Number: N/A
Type: INSTALL/REPLACE SIGNS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (7)
E
Engineer's Estimate
$918,295.12
Over/Under Est: 8.31% $76,304.88
$999,965.54
Over/Under Est: 8.89% $81,670.42
Amt Left: 0.54% $5,365.54
Over/Under Est: 21.32% $195,746.22
Amt Left: 12.01% $119,441.34
Delta: -11.41% -$114,075.80
Over/Under Est: 26.58% $244,115.19
Amt Left: 16.87% $167,810.31
Delta: -4.34% -$48,368.97
Over/Under Est: 42.83% $393,344.61
Amt Left: 31.88% $317,039.73
Delta: -12.84% -$149,229.42
Over/Under Est: 48.02% $440,936.02
Amt Left: 36.66% $364,631.14
Delta: -3.63% -$47,591.41
$1,385,021.60
Over/Under Est: 50.83% $466,726.48
Amt Left: 39.25% $390,421.60
Delta: -1.90% -$25,790.46

Bid Items & Bid Tabulations

21 Total 0 of 21
DALLAS  |  VA  |  DALLAS  |  0918-00-333  |  02/03/2022  |  $918,295.12  |  C 918-00-333  |  INSTL/REPLACE SIGNS  |  160 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WG ENGINEERING & CONSTRUCTION, LLC
MICA CORPORATION
SOUTH TEXAS ILLUMINATION, LLC
FLORIDA TRAFFIC CONTROL DEVICES, INC.
CREATIVE DESIGN CONCEPTS, INC.
SELECT MAINTENANCE, L.L.C.
JE CASEY, LLC
DRILL SHAFT (SIGN MTS) (24 IN)
LF 152.000 $170.000 $285.000 $131.750 $175.910 $139.520 $300.000 $250.000 $215.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 240.000 $350.000 $388.000 $347.000 $360.110 $429.740 $500.000 $500.000 $486.000
RIPRAP (MOW STRIP)(4 IN)
CY 165.000 $484.000 $435.000 $525.000 $427.790 $714.050 $500.000 $650.000 $420.000
MOBILIZATION
LS 1.000 $55,873.440 $35,500.000 $78,225.000 $86,062.500 $91,255.270 $62,000.000 $130,000.000 $95,665.350
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,000.000 $7,300.000 $8,517.000 $14,500.000 $1,636.370 $3,000.000 $18,000.000 $20,576.060
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 40.000 $4.250 $5.000 $9.050 $3.380 $4.370 $1.000 $5.000 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 40.000 $1.000 $5.000 $3.800 $1.100 $1.350 $1.000 $1.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,525.000 $25.000 $30.000 $24.300 $22.050 $24.990 $24.000 $21.000 $23.190
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 15.000 $1,029.000 $1,400.000 $1,248.000 $1,207.500 $1,368.600 $1,475.000 $1,150.000 $1,551.000
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $2,593.000 $3,250.000 $3,139.000 $2,861.250 $3,243.000 $3,000.000 $2,725.000 $2,953.000
ALUMINUM SIGNS (TY A)
SF 25.670 $29.000 $28.000 $27.160 $18.730 $27.590 $19.000 $27.000 $43.580
ALUMINUM SIGNS (TY G)
SF 1,323.000 $31.000 $25.000 $24.600 $26.250 $31.200 $28.000 $28.000 $38.000
ALUMINUM SIGNS (TY O)
SF 2,898.000 $30.000 $25.000 $28.300 $18.020 $25.630 $28.000 $28.000 $35.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 458.250 $31.000 $32.000 $21.300 $29.050 $32.180 $28.000 $27.000 $36.980
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 722.250 $30.000 $32.000 $27.150 $35.730 $29.890 $28.000 $31.000 $33.000
INSTALL LRSS (STRUCT STEEL)
LB 5,644.000 $6.000 $5.500 $5.550 $12.230 $10.550 $10.000 $5.100 $8.750
INS OH SN SUP(35 FT CANT)
EA 15.000 $18,229.000 $24,295.000 $24,080.000 $25,729.070 $28,792.630 $42,200.000 $34,000.000 $35,000.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 1.000 $773.000 $1,198.240 $454.000 $1,381.250 $783.640 $2,500.000 $1,100.000 $2,150.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 45.000 $30.000 $30.000 $47.250 $23.100 $26.180 $25.000 $28.070 $11.000
SHIFT OVERHEAD SIGN PANELS
EA 11.000 $800.000 $850.000 $880.000 $994.500 $1,567.290 $2,500.000 $1,200.000 $990.000
TMA (STATIONARY)
DAY 144.000 $231.000 $175.000 $75.600 $267.500 $313.590 $10.000 $150.000 $150.000
Totals: $918,295.120 $994,600.000 $999,965.560 $1,114,041.354 $1,162,410.323 $1,311,639.730 $1,359,231.140 $1,385,021.614