DALLAS VA (0918-00-327)

Items: 45

County: DALLAS
Length: N/A
Highway: VA
District: DALLAS
Control Number: 0918-00-327
DBE Goal: N/A
Project: F 2022(250)
Guaranty: N/A
Time: 95 WORKING DAYS
Engineer's Estimate: $336,700.57
Date: 01/06/2022 (4 years ago)
Contract Number: N/A
Type: REHAB DYNAMIC MESSAGE SIGNS & IMPROVE PED SIGNALS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$336,700.57
Over/Under Est: 21.88% $73,671.49
$512,887.79
Over/Under Est: 52.33% $176,187.22
Amt Left: 24.98% $102,515.73

Bid Items & Bid Tabulations

45 Total 0 of 45
DALLAS  |  VA  |  DALLAS  |  0918-00-327  |  01/06/2022  |  $336,700.57  |  F 2022(250)  |  REHAB DYNAMIC MESSAGE SIGNS & IMPROV...  |  95 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
MICA CORPORATION
CL A CONC (MISC)
CY 1.500 $1,342.000 $708.500 $2,450.000
RIPRAP (MOW STRIP)(4 IN)
CY 9.350 $545.000 $610.500 $1,265.000
MOBILIZATION
LS 1.000 $13,000.000 $40,066.290 $44,450.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,000.000 $8,534.170 $2,935.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 100.000 $6.000 $6.630 $1.050
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.500 $0.550 $1.050
CONC SIDEWALKS (4")
SY 3.500 $52.550 $1,155.480 $465.000
CURB RAMPS (TY 7)
EA 4.000 $3,000.000 $4,709.500 $4,545.000
MTL W-BEAM GD FEN (STEEL POST)
LF 75.000 $26.000 $34.420 $40.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,000.000 $1,489.500 $1,330.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $3.000 $5.040 $2.100
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $200.000 $227.250 $210.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,700.000 $3,214.500 $3,335.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $250.000 $3,214.500 $525.000
CONDT (PVC) (SCH 40) (2")
LF 76.000 $9.000 $21.030 $25.200
CONDT (PVC) (SCH 40) (2") (BORE)
LF 47.000 $25.000 $39.140 $56.700
CONDT (PVC) (SCH 40) (3")
LF 305.000 $15.000 $28.450 $20.500
ELEC CONDR (NO.8) BARE
LF 721.000 $1.280 $1.320 $2.100
ELEC CONDR (NO.6) BARE
LF 1,319.000 $1.420 $1.860 $2.100
ELEC CONDR (NO.6) INSULATED
LF 5,178.000 $1.860 $1.960 $2.150
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 3.000 $26.000 $33.070 $50.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,517.000 $3.200 $8.540 $4.200
PAVEMENT SEALER 12"
LF 388.000 $1.200 $1.700 $2.100
PAVEMENT SEALER 24"
LF 101.000 $2.400 $2.850 $3.150
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 420.000 $13.000 $21.580 $14.700
ELIM EXT PAV MRK & MRKS (8")
LF 16.000 $1.000 $1.700 $2.100
ELIM EXT PAV MRK & MRKS (24")
LF 101.000 $4.000 $2.850 $4.200
PAV SURF PREP FOR MRK (12")
LF 1,517.000 $0.400 $0.850 $1.050
PAV SURF PREP FOR MRK (24")
LF 420.000 $1.000 $1.700 $2.100
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $650.000 $562.630 $1,315.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 2,788.000 $2.000 $1.620 $3.150
PED POLE ASSEMBLY
EA 7.000 $2,400.000 $2,331.750 $4,200.000
REMOVE PED POLE ASSEMBLY
EA 1.000 $350.000 $657.000 $420.000
PED DETECT PUSH BUTTON (APS)
EA 16.000 $700.000 $798.130 $1,050.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,000.000 $2,617.500 $4,725.000
REMOVAL OF CABLES
LF 102.000 $1.380 $13.690 $1.150
INSTALL OF CABLES
LF 50.000 $2.050 $27.380 $1.200
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 5,956.000 $5.500 $5.830 $3.620
RELOCATE FIBER OPTIC CABLE
LF 260.000 $14.000 $13.900 $24.050
CONDUIT (PREPARE)
LF 8,702.000 $3.750 $2.740 $1.010
GROUND BOX (PREPARE)
EA 36.000 $200.000 $328.500 $471.500
INSTALL DMS (POLE MTD CABINET)
EA 1.000 $10,000.000 $8,241.700 $20,230.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 7.000 $12,000.000 $10,829.200 $23,900.000
REMOVE EXIST FIB OPT DMS SYS(TY-2)
EA 8.000 $3,000.000 $1,642.500 $4,235.000
TMA (STATIONARY)
DAY 16.000 $200.000 $264.750 $171.000
Totals: $336,700.575 $410,372.065 $512,887.790