Bid Cobra

DALLAS VA (0918-00-326)

Items: 24

County: DALLAS
Length: N/A
Highway: VA
District: DALLAS
Control Number: 0918-00-326
DBE Goal: N/A
Project: C 918-00-326
Guaranty: N/A
Time: 200 WORKING DAYS
Engineer's Estimate: $2,144,616.87
Date: 05/06/2021 (5 years ago)
Contract Number: N/A
Type: DMS REHABILITATION AND TRAFFIC SIGNAL UPGRADES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$2,144,616.87
Over/Under Est: -23.08% -$495,051.21
Over/Under Est: -15.63% -$335,182.50
Amt Left: 9.69% $159,868.71
Over/Under Est: -15.48% -$331,980.96
Amt Left: 9.89% $163,070.25
Delta: -0.18% -$3,201.54
Over/Under Est: -7.54% -$161,616.87
Amt Left: 20.21% $333,434.34
Delta: -9.40% -$170,364.09

Bid Items & Bid Tabulations

24 Total 0 of 24
DALLAS  |  VA  |  DALLAS  |  0918-00-326  |  05/06/2021  |  $2,144,616.87  |  C 918-00-326  |  DMS REHAB AND TRAF SIGNAL UPGRADES  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FLORIDA TRAFFIC CONTROL DEVICES, INC.
AMERICAN LIGHTING AND SIGNALIZATION, LLC
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
DURABLE SPECIALTIES, INC.
CL A CONC (MISC)
CY 0.500 $1,342.040 $1,393.460 $4,825.970 $2,362.500 $4,200.000
MOBILIZATION
LS 1.000 $100,000.000 $91,214.210 $159,313.140 $269,039.630 $90,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $7,500.000 $2,290.050 $3,659.690 $3,285.000 $5,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $6.180 $10.410 $2.180 $3.400 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.510 $2.980 $3.460 $0.550 $2.000
CONDT (PVC) (SCH 40) (3")
LF 379.000 $17.600 $15.860 $23.230 $19.070 $21.000
ELEC CONDR (NO.6) BARE
LF 3,081.000 $1.420 $1.330 $1.710 $1.740 $2.000
ELEC CONDR (NO.6) INSULATED
LF 6,309.000 $1.860 $1.530 $1.890 $2.050 $2.000
ELEC CONDR (NO.4) INSULATED
LF 2,067.000 $2.310 $1.870 $3.160 $2.700 $3.000
ELEC CONDR (NO.2) INSULATED
LF 2,067.000 $3.000 $3.160 $3.770 $3.740 $4.000
INSTALL HWY TRF SIG (UPGRADE)
EA 384.000 $4,500.000 $3,527.520 $3,610.490 $3,445.030 $4,100.000
REMOVAL OF CABLES
LF 80.000 $1.380 $0.730 $4.960 $13.690 $1.000
INSTALL OF CABLES
LF 30.000 $2.050 $0.750 $15.650 $33.130 $9.000
ITS COM CBL (ETHERNET)
LF 50.000 $3.680 $2.270 $6.440 $30.830 $19.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 1,654.000 $3.630 $5.480 $6.930 $8.140 $3.000
RELOCATE FIBER OPTIC CABLE
LF 140.000 $13.940 $13.550 $35.750 $37.650 $14.000
CONDUIT (PREPARE)
LF 4,780.000 $3.860 $6.760 $1.920 $1.100 $2.000
GROUND BOX (PREPARE)
EA 20.000 $293.690 $202.610 $245.340 $414.750 $300.000
INSTALL DMS (POLE MTD CABINET)
EA 1.000 $14,000.000 $7,929.680 $10,542.210 $6,792.500 $16,410.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 7.000 $15,000.000 $8,427.420 $14,940.610 $9,842.500 $18,250.000
COAXIAL CABLE
LF 110.000 $4.780 $2.100 $3.840 $6.520 $11.000
RELOCATE ITS RADIO
EA 1.000 $2,320.000 $906.520 $988.400 $633.750 $2,700.000
REMOVE EXIST FIB OPT DMS SYS(TY-2)
EA 8.000 $3,300.000 $2,828.720 $2,661.000 $2,770.500 $4,300.000
TMA (STATIONARY)
DAY 8.000 $283.750 $283.840 $336.240 $259.000 $280.000
Totals: $2,144,616.870 $1,649,565.660 $1,809,434.375 $1,812,635.910 $1,983,000.000