DALLAS SS 348 (0581-02-156)

Items: 184

County: DALLAS
Length: 0.5700 MILES
Highway: SS 348
District: DALLAS
Control Number: 0581-02-156
DBE Goal: 0.0%
Project: BR 2026(442)
Guaranty: $100,000.00
Time: 662 WORKING DAYS
Engineer's Estimate: $16,165,948.94
Date: 03/04/2026 (3 months ago)
Contract Number: 3263005
Type: BRIDGE REPLACEMENT
Project ID: A00132533
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES ON THE NB DC
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$16,165,948.94
$16,606,596.57
Over/Under Est: 2.73% $440,647.63
Over/Under Est: 4.27% $690,066.41
Amt Left: 1.5% $249,418.78
Over/Under Est: 6.62% $1,070,280.45
Amt Left: 3.79% $629,632.82
Delta: -2.26% -$380,214.04
$17,327,417.55
Over/Under Est: 7.18% $1,161,468.61
Amt Left: 4.34% $720,820.98
Delta: -0.53% -$91,188.16
Over/Under Est: 14.6% $2,359,992.70
Amt Left: 11.56% $1,919,345.07
Delta: -6.92% -$1,198,524.09
Over/Under Est: 18.97% $3,066,076.63
Amt Left: 15.81% $2,625,429.00
Delta: -3.81% -$706,083.93
$19,951,728.15
Over/Under Est: 23.42% $3,785,779.21
Amt Left: 20.14% $3,345,131.58
Delta: -3.74% -$719,702.58
Over/Under Est: 32.47% $5,249,456.13
Amt Left: 28.96% $4,808,808.50
Delta: -7.34% -$1,463,676.92
$24,831,322.88
Over/Under Est: 53.6% $8,665,373.94
Amt Left: 49.53% $8,224,726.31
Delta: -15.95% -$3,415,917.81

Bid Items & Bid Tabulations

184 Total 0 of 184
DALLAS  |  SS 348  |  DALLAS  |  0581-02-156  |  03/04/2026  |  $16,165,948.94  |  BR 2026(442)  |  BRIDGE REPL  |  662 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
R CONSTRUCTION CIVIL, LLC
INDUS ROAD & BRIDGE, INC.
ALTUS CONSTRUCTION LLC
HARPER BROTHERS CONSTRUCTION LLC
RAGLE CONSTRUCTION, INC.
WEBBER, LLC
ED BELL CONSTRUCTION COMPANY
COPASA INC
PREPARING ROW
STA 30.100 $16,000.000 $10,000.000 $3,000.000 $13,500.000 $56,991.200 $7,800.000 $9,700.000 $63,122.920 $31,437.160 $82,496.190
REMOV CONC (PAV)
SY 2,799.000 $21.000 $25.000 $45.000 $18.000 $9.654 $15.000 $11.000 $12.400 $14.280 $16.000
REMOV CONC (RIPRAP)
SY 1,247.000 $11.000 $25.000 $11.000 $20.000 $10.454 $5.000 $9.000 $10.300 $9.770 $17.000
REMOV CONC (CURB)
LF 677.000 $8.750 $10.000 $5.000 $5.000 $12.875 $5.000 $7.000 $11.100 $7.770 $12.000
REMOV CONC (APPR SLAB)
SY 932.000 $38.500 $50.000 $15.000 $19.000 $14.476 $5.000 $15.000 $18.900 $16.750 $30.000
REMOV CONC (TRAFFIC BARRIER)
LF 1,239.000 $30.000 $10.000 $60.000 $44.000 $28.962 $20.000 $14.600 $25.200 $26.980 $24.000
RMV (18"-22") TRT/UNTRT BASE & ASPH PAV
SY 7,567.000 $10.500 $10.000 $17.000 $17.000 $5.642 $15.000 $11.500 $17.600 $10.510 $38.000
EXCAV (ROADWAY)
CY 18,069.000 $18.500 $15.000 $22.000 $17.000 $21.516 $10.000 $30.000 $12.000 $8.030 $18.000
EMBANK (FNL)(DC)(TY C1)
CY 16,591.000 $18.000 $20.000 $22.000 $17.000 $28.941 $15.000 $20.000 $9.650 $27.430 $17.500
EMBANK (FNL)(DC)(TY C2)
CY 37,062.000 $25.000 $18.000 $22.000 $53.000 $36.286 $50.000 $54.000 $72.000 $53.940 $19.000
COMPOST MANUF TOPSOIL (4")
SY 20,905.000 $2.200 $1.000 $1.500 $2.000 $10.474 $1.250 $0.950 $1.950 $1.320 $4.700
BLOCK SODDING
SY 20,905.000 $3.000 $5.000 $4.000 $4.200 $4.994 $4.000 $6.000 $4.250 $4.210 $4.250
DRILL SEED (TEMP_WARM_COOL)
SY 18,568.000 $0.330 $0.130 $0.250 $0.270 $0.141 $0.250 $0.310 $0.300 $0.260 $0.310
VEGETATIVE WATERING
TGL 5,873.000 $1.000 $20.000 $36.000 $10.000 $6.250 $5.000 $35.300 $16.300 $1.000 $0.500
FL BS (CMP IN PLC)(TY D GR 1-2) (8")
SY 12,535.000 $18.700 $25.000 $33.000 $15.000 $13.797 $20.950 $17.800 $17.300 $19.360 $21.000
LIME (COM OR QK)(SLURRY)
TON 169.000 $300.000 $350.000 $350.000 $410.000 $337.172 $375.000 $468.690 $355.000 $379.510 $385.000
LIME TRT (EXIST MATL & NEW BASE)(8")
SY 12,535.000 $5.000 $8.000 $6.000 $6.000 $4.973 $10.000 $4.000 $4.800 $4.530 $10.000
PRIME COAT(MC-30 OR AE-P)
GAL 3,762.000 $4.250 $4.500 $5.500 $6.000 $5.287 $5.200 $6.000 $5.400 $5.480 $7.880
SP MIXES SP-B PG76-22
TON 6,896.000 $100.000 $134.000 $150.000 $147.000 $142.106 $131.000 $110.000 $136.000 $166.330 $142.700
SP MIXES SP-D PG64-22
TON 1,379.000 $126.000 $143.000 $180.000 $137.000 $170.298 $121.000 $130.000 $125.000 $156.430 $166.110
TACK COAT
GAL 3,289.000 $4.250 $1.500 $3.500 $4.500 $3.525 $4.000 $6.000 $4.150 $4.210 $10.500
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 1,694.000 $175.000 $200.000 $210.000 $177.000 $199.655 $158.000 $172.000 $164.000 $193.140 $223.970
PLANE ASPH CONC PAV(0" TO 2")
SY 1,994.000 $3.000 $10.000 $5.500 $4.000 $5.044 $8.000 $7.300 $2.000 $6.120 $4.980
PLANE ASPH CONC PAV(0" TO 6")
SY 573.000 $18.000 $15.000 $11.000 $4.500 $5.044 $14.000 $17.400 $2.000 $6.120 $4.980
CEM STABIL BKFL
CY 441.000 $185.000 $180.000 $60.000 $290.000 $145.043 $275.000 $140.000 $238.000 $329.270 $225.000
TRENCH EXCAVATION PROTECTION
LF 702.000 $17.000 $10.000 $2.000 $4.500 $7.070 $5.000 $16.200 $17.100 $36.270 $25.000
TEMPORARY SPL SHORING
SF 16,064.000 $30.000 $35.000 $54.000 $50.000 $47.155 $30.000 $39.000 $45.000 $57.440 $55.000
DRILL SHAFT (18 IN)
LF 90.000 $280.000 $350.000 $165.000 $100.000 $88.183 $100.000 $143.000 $99.250 $181.870 $346.540
DRILL SHAFT (36 IN)
LF 10.000 $296.000 $300.000 $800.000 $750.000 $217.798 $662.000 $662.000 $521.000 $386.560 $541.360
DRILL SHAFT (42 IN)
LF 1,706.000 $285.000 $650.000 $420.000 $300.000 $283.654 $600.000 $334.000 $289.000 $363.220 $250.620
DRILL SHAFT (48 IN)
LF 21.000 $350.000 $600.000 $925.000 $850.000 $287.453 $765.000 $765.000 $505.000 $582.470 $591.200
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 13.000 $750.000 $521.000 $750.000 $720.000 $527.782 $647.000 $647.000 $504.000 $436.070 $521.000
CL B CONC (FLUME)
CY 9.810 $675.000 $1,000.000 $2,000.000 $770.000 $685.478 $1,500.000 $740.000 $830.000 $793.660 $820.000
CL C CONC (ABUT)(HPC)
CY 117.100 $1,220.000 $1,400.000 $2,000.000 $870.000 $959.996 $2,000.000 $880.000 $1,230.000 $1,523.050 $1,674.410
CL C CONC (CAP)(HPC)
CY 52.400 $1,600.000 $1,700.000 $2,800.000 $1,150.000 $820.706 $2,250.000 $1,010.000 $1,140.000 $1,405.830 $2,041.970
CL C CONC (COLUMN)(HPC)
CY 34.200 $1,500.000 $1,800.000 $1,800.000 $1,250.000 $1,619.672 $2,500.000 $1,350.000 $1,310.000 $1,644.830 $2,113.090
CL C CONC (RAIL FOUNDATION)
CY 274.000 $665.000 $1,000.000 $460.000 $475.000 $337.942 $675.000 $636.000 $803.000 $545.740 $591.000
REINF CONC SLAB (HPC)
SF 16,221.000 $27.500 $27.000 $26.000 $24.000 $23.380 $35.000 $29.100 $29.400 $34.790 $38.910
APPROACH SLAB (HPC)
CY 262.000 $715.000 $750.000 $900.000 $625.000 $516.020 $750.000 $563.000 $589.000 $695.070 $709.010
RETAINING WALL (MSE)
SF 34,821.000 $84.000 $85.000 $60.000 $58.000 $54.824 $50.000 $45.000 $52.000 $75.750 $162.680
PRESTR CONC GIRDER (TX62)
LF 3,061.800 $240.000 $277.000 $240.000 $270.000 $223.400 $315.000 $252.000 $316.000 $322.740 $371.070
RIPRAP (CONC)(4 IN)
CY 28.250 $375.000 $700.000 $685.000 $640.000 $448.716 $650.000 $764.000 $678.000 $1,163.790 $795.000
RIPRAP (CONC)(5 IN)
CY 1.000 $1,100.000 $1,000.000 $455.000 $1,000.000 $483.867 $1,250.000 $1,500.000 $779.000 $2,830.890 $4,250.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.280 $720.000 $55.000 $475.000 $590.000 $575.059 $900.000 $691.000 $616.000 $706.650 $805.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 77.000 $285.000 $180.000 $195.000 $190.000 $92.275 $275.000 $223.000 $409.000 $404.470 $290.000
RAIL (TY T222)(HPC)
LF 127.000 $135.000 $220.000 $360.000 $290.000 $106.366 $225.000 $155.300 $151.000 $165.240 $180.000
RAIL (TY SSTR)
LF 1,695.000 $88.000 $120.000 $115.000 $72.000 $53.254 $75.000 $65.000 $68.000 $91.480 $63.600
RAIL (TY SSTR)(HPC)
LF 2,285.900 $90.000 $160.000 $125.000 $80.000 $56.212 $50.000 $65.000 $70.000 $82.590 $73.600
RAIL (TY T80PP)(HPC)
LF 114.000 $140.000 $220.000 $375.000 $310.000 $105.414 $350.000 $224.000 $554.000 $320.090 $399.300
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 186.000 $105.000 $190.000 $200.000 $225.000 $185.969 $275.000 $209.000 $256.000 $197.600 $266.000
CONC BOX CULV (4 FT X 2 FT)
LF 435.000 $350.000 $550.000 $420.000 $350.000 $402.765 $418.170 $404.000 $281.000 $424.680 $600.000
RC PIPE (CL IV)(24 IN)
LF 340.000 $160.000 $110.000 $250.000 $150.000 $148.609 $375.000 $133.000 $112.000 $138.630 $150.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $7,200.000 $6,500.000 $6,400.000 $6,000.000 $5,343.413 $7,425.000 $4,700.000 $7,600.000 $5,090.310 $4,500.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 1.000 $6,100.000 $9,000.000 $10,500.000 $8,200.000 $6,849.212 $12,075.000 $7,075.000 $11,940.000 $13,789.070 $7,500.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $9,300.000 $6,500.000 $8,200.000 $8,600.000 $5,653.781 $20,500.000 $11,775.000 $11,110.000 $18,153.800 $8,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 3.000 $12,200.000 $7,500.000 $6,600.000 $8,700.000 $7,089.824 $17,175.000 $8,400.000 $13,660.000 $15,901.200 $7,500.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 1.000 $7,900.000 $4,500.000 $8,300.000 $11,500.000 $6,035.891 $3,090.000 $6,200.000 $3,090.000 $5,127.010 $5,500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $27,500.000 $21,000.000 $35,000.000 $32,000.000 $23,928.330 $28,160.000 $31,000.000 $26,210.000 $34,879.540 $32,000.000
WINGWALL (SW - 0) (HW=3 FT)
EA 1.000 $8,300.000 $9,000.000 $8,100.000 $21,000.000 $5,185.382 $7,762.000 $11,200.000 $7,760.060 $10,551.320 $6,500.000
REMOV STR (INLET)
EA 3.000 $750.000 $1,000.000 $775.000 $1,400.000 $1,955.123 $2,500.000 $912.000 $4,170.000 $1,900.090 $1,200.000
REMOV STR (SET)
EA 2.000 $425.000 $500.000 $585.000 $1,300.000 $749.632 $750.000 $610.000 $2,100.000 $378.040 $750.000
REMOV STR (PIPE)
LF 326.000 $25.000 $50.000 $1,150.000 $80.000 $27.655 $30.000 $22.000 $38.750 $27.540 $50.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $125,000.000 $100,000.000 $100,000.000 $100,000.000 $137,770.976 $650,350.000 $1,000,000.000 $209,400.000 $183,079.520 $500,000.000
MOBILIZATION
LS 1.000 $1,408,268.090 $1,700,000.000 $1,600,000.000 $1,721,285.980 $1,724,098.942 $1,850,000.000 $1,900,000.000 $1,900,000.000 $2,000,000.000 $2,483,135.331
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $25,000.000 $5,000.000 $8,400.000 $20,000.000 $32,088.199 $37,000.000 $83,850.000 $45,066.260 $73,500.000 $35,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $14,000.000 $15,000.000 $2,250.000 $20,000.000 $4,558.578 $35,000.000 $25,000.000 $24,690.000 $20,000.000 $15,000.000
TMA (STATIONARY)
DAY 662.000 $150.000 $250.000 $230.000 $200.000 $173.276 $75.000 $290.000 $121.000 $100.000 $250.000
TMA (MOBILE OPERATION)
DAY 24.000 $300.000 $1,000.000 $940.000 $550.000 $153.634 $700.000 $630.000 $804.000 $800.000 $500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 512.000 $38.000 $50.000 $80.000 $48.000 $49.637 $42.000 $35.500 $35.500 $54.240 $35.500
ROCK FILTER DAMS (REMOVE)
LF 512.000 $10.000 $5.000 $13.000 $10.000 $10.737 $12.000 $12.000 $12.000 $12.640 $12.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $27.000 $35.000 $40.000 $40.000 $47.611 $40.000 $35.000 $35.000 $36.870 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $6.000 $10.000 $12.000 $12.000 $14.891 $12.000 $11.000 $11.000 $11.590 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,824.000 $3.600 $4.000 $4.500 $4.000 $4.052 $4.500 $3.500 $3.500 $3.690 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,824.000 $1.200 $1.000 $0.500 $0.850 $1.519 $0.500 $1.000 $1.000 $1.050 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 365.000 $4.000 $4.000 $6.000 $6.000 $9.724 $6.000 $5.750 $5.750 $6.060 $5.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 365.000 $1.000 $1.000 $1.000 $2.000 $2.633 $1.000 $1.100 $1.100 $1.160 $1.100
CONSTRUCTING DETOURS
SY 3,094.000 $85.000 $85.000 $100.000 $115.000 $148.913 $120.000 $110.000 $116.000 $105.100 $214.500
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 6,060.000 $35.600 $75.000 $21.000 $75.000 $6.007 $85.000 $21.000 $44.000 $26.700 $68.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 4,920.000 $7.000 $10.000 $5.500 $10.000 $11.143 $15.000 $7.100 $11.300 $8.860 $11.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 6,060.000 $15.600 $25.000 $19.000 $11.000 $11.143 $20.000 $10.500 $15.700 $10.860 $11.000
PERM CTB (F-SHAPE) (MOD)
LF 336.000 $87.500 $180.000 $400.000 $400.000 $72.177 $250.000 $186.000 $402.000 $284.280 $68.000
CONC CURB (TY I)
LF 352.000 $51.450 $35.000 $28.000 $27.000 $13.807 $15.000 $24.000 $45.500 $21.680 $18.500
MTL W-BEAM GD FEN (TIM POST)
LF 1,375.000 $24.000 $25.000 $27.000 $23.000 $27.655 $22.450 $22.500 $22.500 $23.700 $27.300
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,560.000 $2,035.000 $1,900.000 $1,900.000 $2,000.709 $2,035.000 $1,850.000 $1,850.000 $2,737.950 $1,975.000
SHORT RADIUS (28")
LF 50.000 $28.000 $49.000 $80.000 $27.000 $50.853 $48.880 $25.500 $25.500 $26.860 $50.200
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,200.000 $1,650.000 $2,700.000 $1,210.000 $1,134.579 $1,645.000 $1,200.000 $1,200.000 $1,263.960 $1,120.000
REMOVE METAL BEAM GUARD FENCE
LF 2,733.000 $2.750 $3.000 $3.500 $3.000 $3.039 $2.550 $2.500 $2.500 $2.630 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $265.000 $260.000 $625.000 $155.000 $222.863 $255.000 $150.000 $150.000 $158.000 $220.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $210.000 $255.000 $710.000 $155.000 $232.993 $255.000 $150.000 $150.000 $158.000 $230.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $375.000 $255.000 $275.000 $205.000 $263.384 $255.000 $200.000 $200.000 $210.660 $260.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $4,200.000 $3,110.000 $3,400.000 $3,000.000 $3,317.631 $3,110.000 $2,950.000 $2,950.000 $3,107.240 $3,275.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $385.000 $255.000 $275.000 $255.000 $334.295 $255.000 $250.000 $250.000 $263.330 $330.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,800.000 $1,100.000 $1,600.000 $2,000.000 $1,544.851 $1,145.000 $1,500.000 $1,400.000 $1,161.510 $1,525.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $3,800.000 $1,000.000 $900.000 $1,200.000 $820.544 $995.000 $1,500.000 $836.000 $580.760 $810.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $52,000.000 $46,500.000 $47,000.000 $50,000.000 $39,001.167 $46,500.000 $42,000.000 $38,500.000 $45,911.840 $43,305.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 5.000 $9,750.000 $7,500.000 $8,700.000 $14,000.000 $13,862.102 $7,575.000 $15,000.000 $6,480.000 $8,135.590 $7,950.000
PIPE UNDERDRAINS (TY 8) (6")
LF 1,900.000 $45.000 $15.000 $55.000 $45.000 $12.794 $55.000 $56.600 $33.750 $37.640 $39.050
REMOVE RD IL ASM (TRANS-BASE)
EA 2.000 $400.000 $1,300.000 $1,150.000 $1,100.000 $1,296.662 $941.000 $941.000 $1,280.000 $526.650 $1,280.000
CONDT (PVC) (SCH 40) (2")
LF 2,466.000 $19.500 $10.000 $16.000 $15.000 $9.816 $13.350 $13.350 $9.700 $25.280 $9.690
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,108.000 $30.000 $28.000 $42.000 $42.000 $23.765 $37.750 $37.750 $27.600 $28.440 $27.630
CONDT (PVC) (SCH 40) (3")
LF 6,752.000 $25.500 $11.000 $12.000 $12.000 $10.687 $10.250 $10.250 $15.000 $27.390 $10.550
CONDT (PVC) (SCH 40) (3") (BORE)
LF 924.000 $50.000 $34.000 $40.000 $40.000 $34.128 $35.500 $35.500 $33.750 $30.550 $33.690
CONDUIT (PREPARE)
LF 227.000 $2.000 $5.000 $5.500 $5.500 $4.872 $4.800 $4.800 $4.800 $6.320 $4.810
ITS MULTI-DUCT CND (PVC-40)
LF 4,222.000 $27.500 $29.000 $35.000 $35.000 $28.769 $31.000 $31.000 $28.400 $31.600 $28.400
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 767.000 $45.000 $40.000 $79.000 $79.000 $30.279 $71.300 $71.300 $40.000 $34.760 $39.890
ELEC CONDR (NO.12) INSULATED
LF 1,226.000 $2.850 $1.090 $2.000 $1.800 $1.104 $1.600 $1.600 $1.100 $2.110 $1.090
ELEC CONDR (NO.10) INSULATED
LF 780.000 $2.000 $1.310 $2.000 $2.000 $1.327 $1.800 $1.800 $1.300 $2.110 $1.310
ELEC CONDR (NO.8) BARE
LF 273.000 $3.000 $1.930 $2.000 $2.000 $1.975 $1.750 $1.750 $1.950 $2.110 $1.950
ELEC CONDR (NO.8) INSULATED
LF 4,831.000 $3.000 $2.000 $2.500 $2.500 $1.884 $2.250 $2.250 $1.850 $2.110 $1.860
ELEC CONDR (NO.6) BARE
LF 3,815.000 $4.000 $2.000 $2.500 $2.500 $2.026 $2.200 $2.200 $2.000 $3.160 $2.000
ELEC CONDR (NO.6) INSULATED
LF 4,384.000 $7.200 $2.000 $3.250 $3.200 $2.026 $2.800 $2.800 $2.000 $3.160 $2.000
ELEC CONDR (NO.4) BARE
LF 1,032.000 $3.000 $3.500 $3.300 $3.300 $3.545 $2.950 $2.950 $3.500 $3.690 $3.500
ELEC CONDR (NO.4) INSULATED
LF 10,376.000 $3.750 $3.500 $4.000 $4.000 $3.322 $3.600 $3.500 $3.300 $3.690 $3.280
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 12.000 $7,000.000 $4,500.000 $7,200.000 $7,200.000 $4,473.484 $6,485.000 $6,485.000 $4,420.000 $6,214.470 $4,416.000
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 1.000 $13,500.000 $6,300.000 $10,800.000 $10,900.000 $6,366.813 $9,680.000 $9,680.000 $6,290.000 $9,269.040 $6,285.000
REMOVE ITS GROUND BOX
EA 5.000 $835.000 $1,000.000 $400.000 $400.000 $1,570.176 $355.000 $355.000 $1,550.000 $526.650 $1,550.000
GROUND BOX TY C (162911)W/APRON
EA 7.000 $2,915.000 $1,400.000 $2,400.000 $2,400.000 $1,365.547 $2,090.000 $2,090.000 $1,350.000 $1,934.910 $1,348.000
ALUMINUM SIGNS (TY A)
SF 28.000 $45.000 $35.000 $50.000 $43.000 $24.312 $42.690 $50.000 $35.000 $44.970 $24.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $620.000 $690.000 $600.000 $36.000 $545.236 $665.000 $1,000.000 $686.000 $700.440 $875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $975.000 $717.000 $600.000 $920.000 $1,023.147 $775.000 $1,200.000 $717.000 $816.310 $1,010.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 1.000 $4,865.000 $6,000.000 $600.000 $5,000.000 $4,178.696 $6,960.000 $7,500.000 $5,540.000 $7,330.970 $4,125.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $535.000 $500.000 $500.000 $660.000 $815.478 $875.000 $700.000 $500.000 $921.640 $805.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 26.000 $18.000 $65.000 $55.000 $21.000 $24.312 $15.000 $20.000 $20.000 $52.670 $24.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 55.000 $20.000 $65.000 $55.000 $56.000 $30.390 $25.000 $25.000 $25.000 $26.330 $30.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 1,790.000 $1.550 $1.750 $2.500 $2.200 $1.013 $1.750 $1.500 $1.000 $1.840 $1.000
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 76.000 $4.700 $2.000 $5.000 $2.500 $5.065 $2.000 $1.500 $5.000 $2.110 $5.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 6,706.000 $1.750 $1.500 $2.000 $1.900 $1.013 $1.500 $1.250 $1.000 $1.580 $1.000
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 234.000 $3.750 $3.000 $5.000 $3.800 $5.065 $3.000 $2.000 $5.000 $3.160 $5.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 666.000 $2.500 $2.250 $4.500 $2.800 $2.026 $2.250 $2.000 $2.000 $2.370 $2.000
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 50.000 $12.450 $6.000 $9.000 $7.500 $10.130 $6.000 $3.500 $10.000 $6.320 $10.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 2.000 $385.000 $200.000 $600.000 $250.000 $253.254 $200.000 $250.000 $250.000 $210.660 $250.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 2.000 $425.000 $245.000 $650.000 $305.000 $253.254 $245.000 $250.000 $250.000 $258.060 $250.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 7,394.000 $1.120 $1.750 $2.000 $2.200 $0.506 $1.750 $1.250 $0.500 $1.840 $0.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 268.000 $1.870 $1.650 $4.250 $2.100 $2.026 $1.650 $1.500 $2.000 $1.740 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 225.000 $2.250 $1.750 $2.500 $2.200 $5.065 $1.750 $2.000 $5.000 $1.840 $5.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 131.000 $2.200 $4.000 $10.000 $5.000 $5.065 $4.000 $4.000 $5.000 $4.210 $5.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 2.000 $680.000 $425.000 $650.000 $530.000 $607.810 $425.000 $350.000 $600.000 $447.660 $600.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 1.000 $1,700.000 $1,400.000 $2,300.000 $1,800.000 $709.112 $1,400.000 $1,500.000 $700.000 $1,474.620 $700.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 1.000 $1,600.000 $1,950.000 $2,400.000 $2,500.000 $709.112 $1,950.000 $2,000.000 $700.000 $2,053.940 $700.000
PAVEMENT SLER 6"
LF 2,305.000 $0.280 $0.300 $0.400 $0.400 $0.303 $0.300 $0.250 $0.300 $0.320 $0.300
PAVEMENT SLER 8"
LF 225.000 $1.310 $0.600 $0.650 $0.800 $1.013 $0.600 $0.250 $1.000 $0.630 $1.000
PAVEMENT SLER 12"
LF 131.000 $1.450 $1.750 $2.000 $2.200 $1.013 $1.750 $0.500 $1.000 $1.840 $1.000
PAVEMENT SLER (ARROW)
EA 1.000 $50.000 $50.000 $60.000 $63.000 $101.301 $50.000 $20.000 $100.000 $52.670 $100.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,610.000 $2.500 $1.700 $1.500 $2.200 $1.013 $1.700 $0.900 $1.000 $1.790 $1.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 3,053.000 $1.090 $1.350 $1.500 $1.700 $1.013 $1.350 $0.650 $1.000 $1.420 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 3,772.000 $1.500 $1.350 $1.500 $1.700 $1.013 $1.350 $0.650 $1.000 $1.420 $1.000
REFL PAV MRKR TY II-C-R
EA 217.000 $7.000 $7.250 $7.000 $9.100 $10.130 $7.250 $4.250 $10.000 $7.640 $10.000
ELIM EXT PM & MRKS (6")
LF 4,868.000 $0.650 $0.850 $1.000 $1.100 $1.013 $0.850 $0.550 $1.000 $0.900 $1.000
ELIM EXT PM & MRKS (8")
LF 705.000 $2.500 $125.000 $2.000 $1.600 $3.039 $1.250 $0.650 $3.000 $1.320 $3.000
PAV SURF PREP FOR MRK (6")
LF 15,350.000 $0.700 $0.250 $0.250 $0.320 $0.273 $0.250 $0.070 $0.250 $0.260 $0.270
PAV SURF PREP FOR MRK (8")
LF 1,029.000 $1.000 $0.300 $0.250 $0.400 $0.303 $0.300 $0.070 $0.300 $0.320 $0.300
PAV SURF PREP FOR MRK (12")
LF 293.000 $1.300 $1.000 $1.000 $1.250 $0.303 $1.000 $0.140 $0.300 $1.050 $0.300
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $20.000 $45.000 $30.000 $56.000 $70.911 $45.000 $10.000 $70.000 $47.400 $70.000
INS TRF SIG PL AM(S)1 ARM(48')
EA 1.000 $17,500.000 $15,000.000 $19,000.000 $18,500.000 $15,195.260 $16,260.000 $16,260.000 $15,000.000 $13,150.450 $15,000.000
REMOVE TRF SIG PL
EA 1.000 $4,300.000 $2,600.000 $3,400.000 $3,400.000 $2,583.194 $3,000.000 $3,000.000 $2,550.000 $1,263.960 $2,550.000
INSTALL CIRCUIT BREAKER
EA 4.000 $198.000 $270.000 $260.000 $260.000 $405.014 $228.000 $228.000 $270.000 $631.980 $270.000
STONE COLUMNS (30 IN)
LF 21,270.000 $50.000 $10.000 $41.000 $37.000 $38.747 $45.000 $51.000 $50.250 $75.000 $52.960
BARRIER GATE
EA 1.000 $25,000.000 $5,000.000 $11,000.000 $21,000.000 $3,798.815 $29,990.920 $21,500.000 $30,000.000 $26,332.500 $25,000.000
ITS RVSD (DATA COLLECT & WWA) SYS
EA 1.000 $26,500.000 $10,000.000 $15,000.000 $15,000.000 $10,130.173 $12,715.000 $12,715.000 $10,000.000 $14,851.530 $10,000.000
ITS RVSD (DC & WWA)(RELOCATE)
EA 6.000 $3,100.000 $3,300.000 $1,300.000 $1,350.000 $3,337.892 $1,175.000 $1,175.000 $3,300.000 $684.650 $3,295.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 2.000 $7,420.000 $6,740.000 $8,600.000 $8,600.000 $12,640.683 $7,750.000 $7,750.000 $6,740.000 $6,397.750 $6,740.000
ITS POLE (60 FT)(90 MPH)
EA 1.000 $29,500.000 $24,000.000 $36,000.000 $36,000.000 $46,299.957 $32,270.000 $32,270.000 $23,470.000 $30,214.960 $23,470.000
ITS POLE (40 FT)(RELOCATE)
EA 1.000 $5,200.000 $8,450.000 $4,500.000 $4,500.000 $12,534.154 $4,020.000 $4,020.000 $8,450.000 $3,686.550 $8,450.000
ITS POLE MNT CAB (TY 3)(CONF 1)(REL)
EA 1.000 $8,300.000 $1,870.000 $1,800.000 $1,800.000 $1,894.342 $1,595.000 $1,595.000 $1,870.000 $1,108.070 $1,870.000
GROUND BOX (PREPARE)
EA 14.000 $235.000 $290.000 $400.000 $400.000 $739.441 $357.000 $357.000 $285.000 $263.330 $285.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 1.000 $5,500.000 $1,000.000 $1,100.000 $1,100.000 $989.717 $941.000 $941.000 $977.000 $1,579.950 $977.000
RELOCATE CCTV FIELD EQUIPMENT
EA 1.000 $2,800.000 $1,900.000 $1,300.000 $1,400.000 $5,478.529 $1,175.000 $1,175.000 $1,880.000 $1,579.950 $1,880.000
CCTV MOUNT (PEDESTAL)
EA 1.000 $2,500.000 $390.000 $1,400.000 $1,450.000 $395.076 $1,265.000 $1,265.000 $390.000 $631.980 $390.000
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 250.000 $6.000 $2.900 $8.000 $8.000 $2.887 $7.100 $7.100 $2.850 $2.840 $2.850
FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER)
LF 660.000 $5.000 $2.400 $10.000 $10.000 $2.421 $8.800 $8.800 $2.400 $3.270 $2.390
FIBER OPTIC FUSION SPLICE
EA 300.000 $90.000 $325.000 $89.000 $89.000 $329.230 $80.000 $80.000 $325.000 $52.670 $325.000
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 2.000 $1,500.000 $1,350.000 $1,500.000 $1,500.000 $13,199.615 $1,295.000 $1,295.000 $1,330.000 $1,711.620 $1,330.000
FIBER OPTIC PATCH PANEL (36 POSITIONS)
EA 1.000 $1,800.000 $2,200.000 $2,100.000 $2,100.000 $2,218.507 $1,838.000 $1,838.300 $2,190.000 $2,995.590 $2,190.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 7.000 $2,800.000 $3.000 $1,700.000 $1,700.000 $2,932.685 $1,475.000 $1,475.000 $2,900.000 $1,296.610 $2,895.000
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 1,940.000 $4.000 $3.000 $7.000 $7.000 $2.340 $5.750 $5.750 $2.300 $2.840 $2.310
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 4.000 $1,730.000 $2,900.000 $1,150.000 $1,290.000 $2,850.630 $1,012.000 $1,012.000 $2,810.000 $1,711.610 $2,814.000
FIBER OPTIC CBL (SNGL-MODE)(48 FIBER)
LF 5,891.000 $5.000 $5.000 $11.000 $11.000 $4.933 $9.850 $9.850 $4.850 $4.210 $4.870
FIBER OPTIC CBL (SING-MODE)(24 FIBER)
LF 1,675.000 $4.000 $4.000 $8.000 $8.000 $7.790 $7.150 $7.150 $3.700 $3.160 $3.690
FIBER OPTIC PATCH PANEL (48 POSITION)
EA 3.000 $2,000.000 $8,000.000 $2,200.000 $2,200.000 $12,365.902 $1,985.000 $1,985.000 $7,710.000 $3,110.390 $7,707.000
FIBER OPTIC PATCH PANEL (24 POSITION)
EA 1.000 $2,000.000 $4,000.000 $1,700.000 $1,700.000 $3,976.093 $1,500.000 $1,500.000 $3,930.000 $2,157.160 $3,925.000
ETHERNET SWITCH (INSTALL ONLY)
EA 4.000 $2,750.000 $10,000.000 $1,500.000 $1,400.000 $1,519.526 $1,245.000 $1,245.000 $1,500.000 $1,053.300 $1,500.000
INSTALLATION OF TERMINAL SERVER
EA 1.000 $1,950.000 $1,000.000 $175.000 $175.000 $1,013.017 $155.000 $155.000 $1,000.000 $3,475.890 $1,000.000
REMOVE HUB BUILDING
EA 1.000 $4,000.000 $23,610.000 $9,000.000 $9,000.000 $23,917.339 $8,110.000 $7,500.000 $23,610.000 $3,159.900 $23,610.000
ITS GRND MNT CAB (TY 4) (CONF 2)
EA 1.000 $19,000.000 $8,690.000 $17,000.000 $16,500.000 $8,803.120 $14,891.000 $20,000.000 $8,690.000 $12,755.460 $8,690.000
Totals: $16,165,948.940 $16,606,596.570 $16,856,015.350 $17,236,229.390 $17,327,417.518 $18,525,941.640 $19,232,025.570 $19,951,728.152 $21,415,405.066 $24,831,322.873
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
MATERIAL FURNISHED BY THE STATE (PART) $27,900.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $75,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $300,000.00
Total: $502,900.00