DALLAS SL 12 (0581-01-183)

Items: 127

County: DALLAS
Length: 7.3110 MILES
Highway: SL 12
District: DALLAS
Control Number: 0581-01-183
DBE Goal: 5.0%
Project: STP 2025(544)MM
Guaranty: $100,000.00
Time: 214 WORKING DAYS
Engineer's Estimate: $5,094,745.75
Date: 03/05/2025 (1 year ago)
Contract Number: 3253212
Type: INSTALL TRAFFIC SIGNAL
Project ID: A00212937
Contract Type: Federal
Project Description: INSTALL TRAFFIC SIGNALS AND PEDESTRIAN IMPROVEMENTS AT 7 LOCATIONS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTOPHER BLAIN
ERIC HERMAN
ANTHONY BLOCK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$5,094,745.75
$4,443,436.65
Over/Under Est: -12.78% -$651,309.10
Over/Under Est: 18.19% $926,973.25
Amt Left: 35.52% $1,578,282.35
Subcontractor Percentage Amount
WG ENGINEERING & CONSTRUCTION, LLC 49.94% $2,219,052.26
ADVANCED PAVING COMPANY 9.42% $418,571.73
ADVANCED TEXAS STRIPING LLC 1.34% $59,542.05
EC TRUCKING SERVICES LLC 0.34% $15,107.68
BLUE ROCK UTILITIES LLC 0.00% $0.00
MEDELLIN HDD LLC 0.00% $0.00
Total: 61.04% $2,712,273.72

Bid Items & Bid Tabulations

127 Total 0 of 127
DALLAS  |  SL 12  |  DALLAS  |  0581-01-183  |  03/05/2025  |  $5,094,745.75  |  STP 2025(544)MM  |  INSTL TRAF SIGNAL  |  214 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
GREY SKY CONSTRUCTION LLC
REMOV CONC (PAV)
SY 234.000 $80.000 $40.000 $30.000
REMOV CONC (RIPRAP)
SY 1,233.000 $50.000 $40.000 $50.000
REMOV CONC (MEDIANS)
SY 663.000 $80.000 $40.000 $50.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 211.000 $75.000 $40.000 $30.000
REMOV CONC (CURB)
LF 3,174.000 $30.000 $5.000 $30.000
REMOV CONC (CURB & GUTTER)
LF 6.000 $50.000 $100.000 $30.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 258.000 $75.000 $30.000 $20.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 2,938.000 $40.000 $40.000 $30.000
OBLITERATING ABANDONED ROAD
SY 255.000 $30.000 $50.000 $100.000
EXCAV (ROADWAY)
CY 20.000 $125.000 $100.000 $30.000
BACKFILL (TY A OR B)(VEH)
CY 11.000 $20.000 $100.000 $450.000
COMPOST MANUF TOPSOIL (4")
SY 332.000 $15.000 $5.000 $10.000
BLOCK SODDING
SY 332.000 $15.000 $10.000 $10.000
DRILL SEED (PERM_URBAN_CLAY)
SY 1,047.000 $3.000 $1.000 $1.000
DRILL SEED (TEMP_WARM_COOL)
SY 1,047.000 $3.000 $1.000 $1.000
VEGETATIVE WATERING
TGL 337.000 $100.000 $10.000 $50.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 58.000 $40.000 $50.000 $200.000
LIME (COMMERCIAL LIME SLURRY)
TON 29.000 $400.000 $400.000 $400.000
LIME TRT (EXIST MATL)(6")
SY 2,873.000 $40.000 $50.000 $20.000
TACK COAT
GAL 675.000 $10.000 $8.000 $10.000
SP MIXES SP-B SAC-B PG64-22
TON 1,825.000 $200.000 $180.000 $200.000
SP MIXES SP-C SAC-B PG70-22
TON 447.000 $250.000 $250.000 $300.000
PLANE ASPH CONC PAV(2" TO 4")
SY 1,063.000 $25.000 $10.000 $20.000
CONC PAV (JOINT REINF) (8")
SY 50.000 $85.000 $150.000 $500.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 77.000 $600.000 $700.000 $550.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 133.000 $800.000 $700.000 $585.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 154.000 $950.000 $950.000 $650.000
RIPRAP (CONC)(4 IN)
CY 205.000 $1,000.000 $1,000.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 13.000 $1,000.000 $600.000 $550.000
MOBILIZATION
LS 1.000 $444,526.250 $460,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $25,000.000 $10,000.000 $40,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 428.000 $175.000 $100.000 $150.000
TMA (STATIONARY)
DAY 214.000 $350.000 $300.000 $250.000
TMA (MOBILE OPERATION)
DAY 16.000 $400.000 $300.000 $550.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,583.000 $7.500 $6.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,583.000 $1.500 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 486.000 $10.000 $10.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 486.000 $3.500 $5.000 $9.000
CONC CURB (TY II)
LF 3,744.000 $50.000 $20.000 $55.000
CONC CURB & GUTTER (TY II)
LF 732.000 $150.000 $50.000 $65.000
DRIVEWAYS (ACP)
SY 55.000 $85.000 $120.000 $55.000
CONC SIDEWALKS (6")
SY 355.000 $175.000 $100.000 $75.000
CURB RAMPS (TY 1)
EA 2.000 $5,000.000 $3,000.000 $3,250.000
CURB RAMPS (TY 2)
EA 1.000 $5,000.000 $3,000.000 $3,250.000
CURB RAMPS (TY 3)
EA 1.000 $5,000.000 $3,000.000 $3,250.000
CURB RAMPS (TY 5)
EA 6.000 $6,000.000 $3,000.000 $3,250.000
CURB RAMPS (TY 7)
EA 11.000 $5,000.000 $3,000.000 $3,250.000
CONC MEDIAN
SY 16.000 $250.000 $150.000 $250.000
MTL W-BEAM GD FEN (TIM POST)
LF 218.000 $35.000 $40.000 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,750.000 $3,000.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 138.000 $8.000 $5.000 $5.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $300.000 $500.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,500.000 $4,000.000 $3,520.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $400.000 $500.000 $1,500.000
CONDT (PVC) (SCH 80) (2")
LF 706.000 $25.000 $28.000 $30.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 95.000 $45.000 $36.000 $60.000
CONDT (PVC) (SCH 80) (3")
LF 895.000 $30.000 $31.000 $40.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 2,381.000 $50.000 $52.000 $60.000
CONDT (PVC) (SCH 80) (4")
LF 606.000 $35.000 $38.000 $50.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 2,336.000 $55.000 $60.000 $80.000
ELEC CONDR (NO.12) INSULATED
LF 1,920.000 $2.500 $2.400 $3.000
ELEC CONDR (NO.8) INSULATED
LF 5,756.000 $3.000 $3.000 $3.000
ELEC CONDR (NO.6) BARE
LF 4,261.000 $3.000 $3.500 $3.000
ELEC CONDR (NO.6) INSULATED
LF 558.000 $3.000 $4.000 $3.000
ITS GND BOX (POLY) TY 1 (243648)W/APRN
EA 7.000 $5,500.000 $5,500.000 $2,500.000
GROUND BOX TY C (162911)W/APRON
EA 1.000 $4,500.000 $3,000.000 $1,500.000
GROUND BOX TY D (162922)W/APRON
EA 40.000 $2,500.000 $2,500.000 $1,500.000
ELC SRV TY D 120/240 100(NS)SS(E)PS(U)
EA 7.000 $12,000.000 $10,000.000 $12,500.000
ALUMINUM SIGNS (TY A)
SF 484.000 $50.000 $42.000 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $750.000 $1,200.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 12.000 $250.000 $160.000 $500.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,069.000 $5.000 $1.500 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,317.000 $15.000 $11.750 $20.000
PAVEMENT SLER 6"
LF 10,178.000 $1.000 $0.300 $1.000
PAVEMENT SLER 8"
LF 881.000 $1.500 $44.000 $3.000
PAVEMENT SLER 24"
LF 2,317.000 $3.000 $2.500 $6.000
PAVEMENT SLER (ARROW)
EA 14.000 $55.000 $50.000 $250.000
PAVEMENT SLER (WORD)
EA 12.000 $55.000 $60.000 $250.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 930.000 $3.000 $1.150 $1.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 3,427.000 $3.000 $1.000 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 5,827.000 $3.000 $1.000 $1.000
PREFAB PM TY C (W)(ARROW)
EA 14.000 $500.000 $400.000 $250.000
PREFAB PM TY C (W)(WORD)
EA 12.000 $500.000 $500.000 $250.000
REFL PAV MRKR TY II-C-R
EA 148.000 $15.000 $7.000 $6.000
ELIM EXT PM & MRKS (6")
LF 5,021.000 $1.500 $1.000 $1.000
ELIM EXT PM & MRKS (8")
LF 96.000 $5.000 $1.200 $6.000
ELIM EXT PM & MRKS (ARROW)
EA 1.000 $100.000 $75.000 $250.000
PAV SURF PREP FOR MRK (6")
LF 8,733.000 $1.000 $0.100 $1.000
PAV SURF PREP FOR MRK (8")
LF 895.000 $3.500 $0.100 $2.000
PAV SURF PREP FOR MRK (24")
LF 2,317.000 $4.000 $1.000 $5.000
PAV SURF PREP FOR MRK (ARROW)
EA 14.000 $100.000 $20.000 $150.000
PAV SURF PREP FOR MRK (WORD)
EA 12.000 $100.000 $25.000 $150.000
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 7.000 $45,000.000 $50,000.000 $65,000.000
VEH SIG SEC (12")LED(GRN)
EA 69.000 $400.000 $400.000 $325.000
VEH SIG SEC (12")LED(GRN ARW)
EA 18.000 $400.000 $400.000 $325.000
VEH SIG SEC (12")LED(YEL)
EA 69.000 $400.000 $400.000 $325.000
VEH SIG SEC (12")LED(YEL ARW)
EA 24.000 $400.000 $400.000 $325.000
VEH SIG SEC (12")LED(RED)
EA 70.000 $400.000 $400.000 $325.000
VEH SIG SEC (12")LED(RED ARW)
EA 24.000 $400.000 $400.000 $325.000
PED SIG SEC (LED)(COUNTDOWN)
EA 43.000 $1,000.000 $800.000 $8,500.000
LOUVER (12") (ADJUSTABLE)
EA 14.000 $300.000 $500.000 $1,500.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 64.000 $300.000 $250.000 $400.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 8.000 $350.000 $100.000 $500.000
BACKPLATE W/REFL BRDR(5 SEC)ALUM
EA 10.000 $400.000 $400.000 $600.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 3,051.000 $3.000 $4.000 $3.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 751.000 $4.000 $4.000 $3.000
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 2,294.000 $5.000 $5.000 $3.000
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 2,872.000 $7.000 $10.000 $3.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 4,669.000 $3.000 $2.500 $3.000
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 2.000 $15,000.000 $15,000.000 $22,500.000
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 4.000 $16,000.000 $18,000.000 $26,500.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 1.000 $15,000.000 $20,000.000 $32,000.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $15,500.000 $20,000.000 $36,500.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 3.000 $18,000.000 $20,000.000 $45,000.000
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 4.000 $20,000.000 $20,000.000 $48,000.000
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 2.000 $35,000.000 $25,000.000 $50,000.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 3.000 $36,000.000 $25,000.000 $52,000.000
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $37,000.000 $45,000.000 $60,000.000
INS TRF SIG PL AM(S)2 ARM(40-28')LUM
EA 1.000 $40,000.000 $45,000.000 $55,000.000
INS TRF SIG PL AM(S)2 ARM(44-36')LUM
EA 1.000 $45,000.000 $45,000.000 $58,000.000
INS TRF SIG PL AM(S)2 ARM(50-32')LUM
EA 1.000 $50,000.000 $45,000.000 $60,000.000
PED POLE ASSEMBLY
EA 19.000 $3,500.000 $4,000.000 $6,500.000
PED DETECT PUSH BUTTON (APS)
EA 38.000 $1,250.000 $1,500.000 $1,850.000
PED DETECTOR CONTROLLER UNIT
EA 7.000 $4,500.000 $5,000.000 $6,500.000
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 126.000 $350.000 $20.000 $200.000
RVDS (PRESENCE DET)(INSTALL ONLY)
EA 27.000 $2,500.000 $2,000.000 $5,000.000
RVDS (PRES AND ADV)(INSTALL ONLY)
EA 14.000 $2,500.000 $2,500.000 $5,000.000
Totals: $5,094,745.750 $4,443,436.650 $6,021,719.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $21,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
MATERIALS FURNISHED BY CITY (PART) $700,000.00
Total: $723,000.00