DALLAS SL 12 (0581-01-182)

Items: 102

County: DALLAS
Length: 4.2560 MILES
Highway: SL 12
District: DALLAS
Control Number: 0581-01-182
DBE Goal: 3.0%
Project: STP 2025(541)MM
Guaranty: $65,000.00
Time: 205 WORKING DAYS
Engineer's Estimate: $3,518,014.49
Date: 05/02/2025 (1 year ago)
Contract Number: 5253210
Type: INSTALL TRAFFIC SIGNAL
Project ID: A00212930
Contract Type: Federal
Project Description: INSTALL TRAFFIC SIGNALS AND PEDESTRIAN IMPROVEMENTS AT 5 LOCATIONS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTOPHER BLAIN
ERIC HERMAN
ANTHONY BLOCK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$3,518,014.49
$3,099,433.21
Over/Under Est: -11.9% -$418,581.28
Over/Under Est: -3.51% -$123,385.99
Amt Left: 9.52% $295,195.29
Over/Under Est: 7.26% $255,304.51
Amt Left: 21.74% $673,885.79
Delta: -11.16% -$378,690.50
Over/Under Est: 9.39% $330,271.61
Amt Left: 24.16% $748,852.89
Delta: -1.99% -$74,967.10
Over/Under Est: 19.2% $675,621.29
Amt Left: 35.3% $1,094,202.57
Delta: -8.97% -$345,349.68
Subcontractor Percentage Amount
PRECISION ROAD SERVICES, LLC 5.41% $167,679.34
TRAFFIC TECH SOLUTIONS, LLC 3.39% $105,070.79
AAA DRILLING FOUNDATION COMPANY, INC. 2.19% $67,877.59
JC DIRECTIONAL DRILLING 2.10% $65,088.10
RAGLE CONSTRUCTION, INC. 1.83% $56,719.63
ELITE STRIPING, LLC 1.24% $38,432.97
STRAIGHT LINE SAWING & SEALING, INC. 1.07% $33,163.94
H TORRES TRUCKING, L.L.C. 0.05% $1,549.72
Total: 17.28% $535,582.08

Bid Items & Bid Tabulations

102 Total 0 of 102
DALLAS  |  SL 12  |  DALLAS  |  0581-01-182  |  05/02/2025  |  $3,518,014.49  |  STP 2025(541)MM  |  INSTL TRAF SIGNAL  |  205 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SELECT MAINTENANCE, L.L.C.
WG ENGINEERING & CONSTRUCTION, LLC
GREY SKY CONSTRUCTION LLC
DURABLE SPECIALTIES, INC.
AMERICAN LIGHTING AND SIGNALIZATION, LLC
REMOV CONC (MEDIANS)
SY 311.000 $57.000 $45.000 $101.600 $50.000 $110.000 $406.440
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 329.000 $35.000 $39.000 $82.600 $50.000 $90.000 $203.220
REMOV CONC (CURB)
LF 39.000 $20.000 $22.000 $76.200 $50.000 $80.000 $101.610
EXCAV (ROADWAY)
CY 75.000 $90.000 $200.000 $254.000 $100.000 $110.000 $152.410
SP MIXES SP-B SAC-B PG64-22
TON 28.000 $300.000 $400.000 $983.900 $200.000 $70.000 $812.870
SP MIXES SP-C PG64-22
TON 132.000 $230.000 $400.000 $857.000 $250.000 $80.000 $812.870
TACK COAT
GAL 49.000 $4.000 $20.000 $9.300 $10.000 $55.000 $304.820
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 44.000 $615.000 $360.000 $495.000 $450.000 $915.000 $602.500
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 91.000 $650.000 $475.000 $780.000 $550.000 $1,020.000 $844.360
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 264.000 $900.000 $560.000 $1,100.000 $650.000 $1,290.000 $1,067.070
RIPRAP (CONC)(4 IN)
CY 2.000 $775.000 $2,500.000 $2,539.100 $650.000 $2,650.000 $1,422.530
RIPRAP (CONC)(6 IN)
CY 8.000 $800.000 $2,500.000 $2,539.100 $850.000 $2,800.000 $1,625.730
MOBILIZATION
LS 1.000 $319,836.140 $310,000.000 $325,939.500 $300,000.000 $375,000.000 $220,792.650
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $25,000.000 $29,500.000 $14,007.200 $8,500.000 $15,000.000 $3,809.650
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 50.000 $150.000 $75.000 $127.000 $150.000 $80.000 $175.000
TMA (STATIONARY)
DAY 205.000 $315.000 $140.000 $300.000 $250.000 $750.000 $675.070
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 250.000 $14.000 $6.000 $9.000 $18.000 $2.000 $25.050
BIODEG EROSN CONT LOGS (REMOVE)
LF 250.000 $7.000 $1.000 $4.000 $9.000 $1.000 $10.110
CONC CURB (TY II)
LF 604.000 $40.000 $26.000 $101.600 $60.000 $110.000 $121.930
CONC CURB (MONO) (TY II)
LF 179.000 $8.000 $26.000 $50.800 $15.000 $55.000 $203.220
CONC CURB & GUTTER (TY I)
LF 36.000 $75.000 $70.000 $127.000 $65.000 $135.000 $875.000
CONC SIDEWALKS (4")
SY 269.000 $75.000 $105.000 $190.500 $65.000 $200.000 $304.820
CURB RAMPS (TY 1)
EA 2.000 $3,125.000 $2,500.000 $6,220.800 $3,850.000 $6,500.000 $8,128.760
CURB RAMPS (TY 2)
EA 3.000 $3,800.000 $2,500.000 $6,347.700 $3,850.000 $6,800.000 $8,128.760
CURB RAMPS (TY 5)
EA 10.000 $5,000.000 $2,800.000 $7,363.300 $3,850.000 $7,900.000 $8,128.760
CURB RAMPS (TY 7)
EA 12.000 $3,250.000 $3,000.000 $6,347.700 $3,850.000 $6,800.000 $8,128.760
CURB RAMPS (TY 10)
EA 1.000 $3,250.000 $3,200.000 $6,220.800 $3,850.000 $6,500.000 $10,160.950
CURB RAMPS (TY 21)
EA 2.000 $3,500.000 $4,000.000 $7,617.200 $3,850.000 $8,100.000 $10,160.950
CONDT (PVC) (SCH 80) (2")
LF 496.000 $29.000 $21.000 $22.800 $30.000 $37.000 $35.000
CONDT (PVC) (SCH 80) (3")
LF 932.000 $36.000 $21.000 $26.000 $40.000 $41.000 $45.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,968.000 $60.000 $45.000 $34.000 $70.000 $74.000 $58.000
CONDT (PVC) (SCH 80) (4")
LF 581.000 $69.000 $22.000 $30.000 $60.000 $43.000 $51.510
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,968.000 $70.000 $45.000 $40.000 $80.000 $77.000 $92.510
ELEC CONDR (NO.12) INSULATED
LF 1,840.000 $2.750 $1.500 $2.000 $3.000 $3.000 $2.920
ELEC CONDR (NO.8) INSULATED
LF 4,095.000 $3.000 $2.000 $3.000 $3.000 $4.000 $9.850
ELEC CONDR (NO.6) BARE
LF 5,914.000 $3.250 $2.200 $3.000 $3.000 $5.000 $9.580
ELEC CONDR (NO.6) INSULATED
LF 508.000 $3.500 $2.500 $4.000 $3.000 $5.000 $9.580
ELEC CONDR (NO.4) INSULATED
LF 328.000 $5.000 $3.200 $5.000 $3.000 $6.000 $10.250
ITS GND BOX (POLY) TY 1 (243624)W/APRN
EA 5.000 $4,000.000 $3,000.000 $4,359.600 $3,000.000 $6,000.000 $6,600.000
GROUND BOX TY D (162922)
EA 10.000 $1,700.000 $2,000.000 $1,767.200 $1,150.000 $1,900.000 $1,800.000
GROUND BOX TY D (162922)W/APRON
EA 23.000 $2,000.000 $3,000.000 $2,188.700 $1,150.000 $2,815.000 $3,000.000
ELC SRV TY D 120/240 100(NS)SS(E)PS(U)
EA 5.000 $12,000.000 $30,000.000 $9,121.600 $12,500.000 $12,250.000 $11,194.170
ALUMINUM SIGNS (TY A)
SF 338.000 $36.000 $60.000 $35.000 $40.000 $90.000 $75.000
REMOVE SM RD SN SUP&AM
EA 8.000 $450.000 $60.000 $167.600 $250.000 $250.000 $540.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,225.000 $3.750 $1.500 $3.900 $6.000 $2.000 $5.080
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,599.000 $16.000 $6.500 $19.100 $20.000 $10.000 $16.260
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 13.000 $185.000 $200.000 $1,951.300 $250.000 $225.000 $406.440
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $350.000 $350.000 $457.100 $550.000 $415.000 $609.660
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000 $275.000 $250.000 $380.900 $500.000 $230.000 $406.440
PAVEMENT SLER 6"
LF 1,664.000 $0.650 $0.200 $1.300 $3.000 $0.250 $0.100
PAVEMENT SLER 8"
LF 341.000 $2.000 $0.200 $2.600 $6.000 $0.250 $0.120
PAVEMENT SLER 24"
LF 2,557.000 $4.250 $0.600 $2.600 $20.000 $3.000 $0.240
PAVEMENT SLER (ARROW)
EA 13.000 $150.000 $25.000 $95.300 $250.000 $20.000 $40.640
PAVEMENT SLER (WORD)
EA 8.000 $150.000 $25.000 $120.700 $250.000 $25.000 $40.640
PAVEMENT SLER (DBL ARROW)
EA 2.000 $60.000 $35.000 $152.400 $500.000 $40.000 $60.960
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,703.000 $1.000 $1.200 $3.900 $3.000 $1.500 $4.060
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 2,186.000 $1.000 $0.850 $3.900 $3.000 $1.500 $4.060
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 4,129.000 $1.000 $0.850 $3.900 $3.000 $1.000 $4.060
REFL PAV MRKR TY I-C
EA 16.000 $4.000 $5.000 $7.700 $6.000 $5.000 $12.190
REFL PAV MRKR TY II-A-A
EA 49.000 $4.250 $5.000 $7.700 $6.000 $5.000 $12.190
REFL PAV MRKR TY II-C-R
EA 155.000 $6.500 $5.000 $7.700 $6.000 $5.000 $16.260
ELIM EXT PM & MRKS (4")
LF 717.000 $0.700 $0.600 $3.900 $2.000 $1.000 $3.050
ELIM EXT PM & MRKS (8")
LF 6.000 $1.500 $1.000 $5.100 $6.000 $2.000 $6.100
ELIM EXT PM & MRKS (12")
LF 275.000 $2.000 $2.000 $6.400 $20.000 $2.500 $10.160
ELIM EXT PM & MRKS (24")
LF 312.000 $6.000 $4.000 $12.700 $20.000 $5.000 $20.320
ELIM EXT PM & MRKS (ARROW)
EA 1.000 $135.000 $65.000 $146.000 $250.000 $60.000 $304.820
ELIM EXT PM & MRKS (DBL ARROW)
EA 1.000 $200.000 $100.000 $241.300 $500.000 $110.000 $406.440
PAV SURF PREP FOR MRK (6")
LF 1,858.000 $0.200 $0.070 $1.300 $3.000 $0.100 $1.020
PAV SURF PREP FOR MRK (8")
LF 387.000 $0.500 $0.100 $1.300 $6.000 $0.150 $1.520
PAV SURF PREP FOR MRK (24")
LF 2,629.000 $2.000 $0.300 $3.900 $20.000 $1.000 $2.020
PAV SURF PREP FOR MRK (ARROW)
EA 9.000 $50.000 $10.000 $95.300 $250.000 $14.000 $91.450
PAV SURF PREP FOR MRK (WORD)
EA 8.000 $65.000 $10.000 $348.200 $250.000 $20.000 $101.610
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 5.000 $50,000.000 $75,000.000 $65,000.000 $35,000.000 $35,000.000 $25,801.410
VEH SIG SEC (12")LED(GRN)
EA 79.000 $360.000 $270.000 $421.500 $350.000 $750.000 $761.610
VEH SIG SEC (12")LED(GRN ARW)
EA 18.000 $363.000 $270.000 $421.500 $350.000 $750.000 $761.610
VEH SIG SEC (12")LED(YEL)
EA 79.000 $360.000 $270.000 $421.500 $350.000 $750.000 $761.610
VEH SIG SEC (12")LED(YEL ARW)
EA 28.000 $363.000 $270.000 $421.500 $350.000 $750.000 $761.610
VEH SIG SEC (12")LED(RED)
EA 79.000 $360.000 $270.000 $421.500 $350.000 $750.000 $761.610
VEH SIG SEC (12")LED(RED ARW)
EA 24.000 $363.000 $270.000 $421.500 $350.000 $750.000 $761.610
PED SIG SEC (LED)(COUNTDOWN)
EA 44.000 $1,500.000 $1,000.000 $421.500 $4,500.000 $1,400.000 $1,011.060
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 78.000 $325.000 $220.000 $198.100 $300.000 $285.000 $243.330
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 14.000 $500.000 $220.000 $279.300 $300.000 $300.000 $344.940
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 3,150.000 $3.500 $3.300 $3.000 $3.000 $4.000 $6.520
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 977.000 $3.500 $3.300 $4.000 $3.000 $4.000 $12.860
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 1,095.000 $4.000 $4.500 $5.000 $3.000 $7.000 $13.060
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 3,495.000 $7.000 $6.000 $9.000 $3.000 $9.000 $15.880
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 4,655.000 $4.000 $3.000 $3.000 $3.000 $3.000 $15.880
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $6,300.000 $1,000.000 $1,340.700 $2,500.000 $2,000.000 $12,153.430
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 1.000 $14,000.000 $20,000.000 $15,000.000 $16,500.000 $17,800.000 $19,259.930
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 3.000 $26,000.000 $22,000.000 $16,000.000 $18,500.000 $18,600.000 $21,901.780
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 6.000 $30,000.000 $23,000.000 $17,200.000 $21,000.000 $20,100.000 $22,308.220
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 2.000 $40,000.000 $27,000.000 $21,000.000 $23,000.000 $22,200.000 $31,453.070
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 6.000 $55,000.000 $40,000.000 $37,000.000 $62,000.000 $41,900.000 $52,259.310
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $60,000.000 $41,000.000 $38,200.000 $63,000.000 $42,900.000 $55,000.000
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 3.000 $40,000.000 $42,000.000 $38,000.000 $64,000.000 $43,900.000 $58,000.000
INS TRF SIG PL AM(S)2 ARM(60-40')LUM
EA 1.000 $75,000.000 $52,000.000 $45,000.000 $70,000.000 $52,500.000 $66,000.000
PED POLE ASSEMBLY
EA 9.000 $5,500.000 $2,000.000 $3,610.600 $3,500.000 $7,000.000 $2,359.590
PED DETECT PUSH BUTTON (APS)
EA 44.000 $1,700.000 $1,200.000 $1,302.600 $1,850.000 $1,250.000 $1,234.410
PED DETECTOR CONTROLLER UNIT
EA 5.000 $5,750.000 $6,500.000 $5,327.000 $6,500.000 $5,500.000 $12,614.660
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 20.000 $100.000 $250.000 $255.000 $500.000 $50.000 $952.880
RVDS (PRESENCE DET)(INSTALL ONLY)
EA 24.000 $2,000.000 $850.000 $1,900.000 $10,000.000 $3,050.000 $1,627.180
RVDS (PRES AND ADV)(INSTALL ONLY)
EA 10.000 $2,000.000 $850.000 $1,900.000 $15,000.000 $3,050.000 $1,627.180
Totals: $3,518,014.490 $3,099,433.210 $3,394,628.500 $3,773,319.000 $3,848,286.100 $4,193,635.780
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $15,000.00
MATERIALS FURNISHED BY CITY (PART) $550,000.00
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
Total: $567,000.00