REMOVING CONC (PAV)
|
SY
|
42.000
|
$9.600
|
$92.300
|
$771.190
|
$105.000
|
$50.000
|
$315.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
56.000
|
$65.000
|
$90.100
|
$574.460
|
$100.000
|
$50.000
|
$315.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9.000
|
$110.000
|
$151.900
|
$2,192.500
|
$170.000
|
$100.000
|
$525.000
|
|
|
BLOCK SODDING
|
SY
|
50.000
|
$50.000
|
$81.400
|
$91.880
|
$330.000
|
$20.000
|
$100.000
|
|
|
VEGETATIVE WATERING
|
MG
|
5.000
|
$45.000
|
$1,084.800
|
$375.880
|
$550.000
|
$100.000
|
$5,000.000
|
|
|
PROOF ROLLING
|
HR
|
3.000
|
$100.000
|
$1,735.600
|
$643.120
|
$1,920.000
|
$150.000
|
$525.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
10.000
|
$15.000
|
$217.000
|
$6,700.000
|
$240.000
|
$100.000
|
$630.000
|
|
|
CONC PVMT (JOINTED - CPCD) (10")
|
SY
|
49.000
|
$350.000
|
$341.700
|
$778.670
|
$380.000
|
$300.000
|
$1,000.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(12")
|
SY
|
10.000
|
$500.000
|
$688.800
|
$512.500
|
$765.000
|
$1,000.000
|
$3,500.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
8.000
|
$265.000
|
$1,014.300
|
$874.360
|
$1,125.000
|
$500.000
|
$2,100.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
52.000
|
$500.000
|
$867.700
|
$298.110
|
$655.000
|
$450.000
|
$525.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
171.000
|
$625.000
|
$925.200
|
$376.690
|
$715.000
|
$550.000
|
$630.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
104.000
|
$775.000
|
$994.300
|
$427.480
|
$785.000
|
$650.000
|
$840.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
8.500
|
$1,050.000
|
$1,301.700
|
$1,402.220
|
$1,440.000
|
$650.000
|
$2,100.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$1,000.000
|
$4,122.000
|
$4,256.250
|
$4,500.000
|
$2,500.000
|
$5,000.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
5.000
|
$2,892.000
|
$1,952.500
|
$4,541.250
|
$2,100.000
|
$1,500.000
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$172,000.000
|
$313,816.600
|
$277,125.000
|
$293,715.000
|
$400,000.000
|
$1,112,250.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$8,500.000
|
$22,391.000
|
$4,117.610
|
$18,612.000
|
$10,000.000
|
$450.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
580.000
|
$18.000
|
$14.200
|
$1.380
|
$2.000
|
$18.000
|
$25.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
580.000
|
$9.000
|
$1.200
|
$0.690
|
$1.000
|
$9.000
|
$5.000
|
|
|
CONC CURB (TY II)
|
LF
|
371.000
|
$55.000
|
$70.600
|
$278.850
|
$80.000
|
$65.000
|
$31.500
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
98.000
|
$100.000
|
$92.300
|
$259.570
|
$105.000
|
$75.000
|
$210.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
392.000
|
$150.000
|
$124.800
|
$297.670
|
$140.000
|
$85.000
|
$420.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
7.000
|
$2,995.000
|
$3,471.100
|
$3,718.570
|
$3,900.000
|
$3,500.000
|
$6,000.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
6.000
|
$3,003.000
|
$3,579.600
|
$3,593.750
|
$4,000.000
|
$3,500.000
|
$6,000.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
6.000
|
$3,500.000
|
$3,471.100
|
$3,593.750
|
$4,000.000
|
$3,500.000
|
$6,000.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
10.000
|
$4,371.000
|
$4,013.500
|
$3,568.750
|
$4,500.000
|
$3,500.000
|
$12,000.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
1.000
|
$3,400.000
|
$3,796.600
|
$5,206.250
|
$4,200.000
|
$3,500.000
|
$6,000.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
$3,820.000
|
$5,206.700
|
$5,206.250
|
$5,800.000
|
$3,500.000
|
$12,000.000
|
|
|
CONC MEDIAN
|
SY
|
27.000
|
$500.000
|
$233.300
|
$600.000
|
$260.000
|
$250.000
|
$315.000
|
|
|
CONCRETE MEDIAN (NOSE)
|
SY
|
8.000
|
$500.000
|
$244.100
|
$1,063.750
|
$270.000
|
$500.000
|
$1,575.000
|
|
|
IN RD IL (TY SA) 20T-4 (150W EQ) LED
|
EA
|
7.000
|
$6,000.000
|
$3,910.500
|
$4,265.540
|
$7,000.000
|
$6,500.000
|
$6,065.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
325.000
|
$25.000
|
$23.700
|
$23.230
|
$38.000
|
$20.000
|
$33.750
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
85.000
|
$50.000
|
$29.600
|
$42.070
|
$72.000
|
$40.000
|
$47.500
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
895.000
|
$31.000
|
$25.500
|
$30.260
|
$42.000
|
$30.000
|
$38.130
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
2,125.000
|
$50.000
|
$33.600
|
$46.990
|
$75.000
|
$50.000
|
$51.880
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
340.000
|
$40.000
|
$28.600
|
$36.420
|
$45.000
|
$40.000
|
$43.130
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
3,035.000
|
$70.000
|
$38.000
|
$51.860
|
$77.000
|
$60.000
|
$56.880
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
1,120.000
|
$3.000
|
$1.700
|
$2.030
|
$2.000
|
$3.000
|
$1.380
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,460.000
|
$3.000
|
$2.500
|
$2.210
|
$3.000
|
$3.000
|
$2.380
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
4,520.000
|
$3.000
|
$2.600
|
$1.850
|
$4.000
|
$3.000
|
$2.810
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
265.000
|
$3.000
|
$5.400
|
$2.970
|
$4.000
|
$3.000
|
$2.810
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
28.000
|
$2,500.000
|
$1,969.900
|
$2,354.460
|
$3,115.000
|
$1,500.000
|
$2,858.750
|
|
|
REMOVE GROUND BOX
|
EA
|
12.000
|
$500.000
|
$572.200
|
$419.380
|
$425.000
|
$500.000
|
$485.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(E)PS(U)
|
EA
|
6.000
|
$11,310.000
|
$9,122.500
|
$9,400.000
|
$12,000.000
|
$9,500.000
|
$12,786.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$1,000.000
|
$1,123.800
|
$1,675.000
|
$1,255.000
|
$1,500.000
|
$1,562.500
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$1,000.000
|
$1,340.200
|
$1,543.750
|
$810.000
|
$1,100.000
|
$1,250.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
59.000
|
$3.500
|
$10.900
|
$11.540
|
$2.000
|
$6.000
|
$11.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
630.000
|
$7.000
|
$2.200
|
$3.310
|
$2.000
|
$6.000
|
$2.200
|
|
|
PAVEMENT SEALER 6"
|
LF
|
16,265.000
|
$0.500
|
$0.600
|
$2.000
|
$0.200
|
$2.000
|
$0.450
|
|
|
PAVEMENT SEALER 8"
|
LF
|
689.000
|
$0.500
|
$1.100
|
$2.150
|
$0.250
|
$6.000
|
$0.900
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,385.000
|
$8.000
|
$2.800
|
$3.600
|
$2.000
|
$20.000
|
$2.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
14.000
|
$150.000
|
$59.700
|
$63.410
|
$18.000
|
$250.000
|
$60.500
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$200.000
|
$81.400
|
$111.120
|
$24.000
|
$250.000
|
$82.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,855.000
|
$1.500
|
$2.800
|
$3.600
|
$0.150
|
$2.000
|
$2.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
6,862.000
|
$1.500
|
$2.500
|
$3.320
|
$1.500
|
$2.000
|
$2.200
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
109.000
|
$1.500
|
$2.800
|
$3.600
|
$1.500
|
$2.000
|
$2.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
5,578.000
|
$1.500
|
$2.500
|
$3.320
|
$1.500
|
$2.000
|
$2.200
|
|
PREFAB PAV MRK TY B (W)(6")(SLD)
|
LF
|
1,861.000
|
$9.000
|
$13.100
|
$15.580
|
$10.000
|
$2.000
|
$13.200
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
2,385.000
|
$60.000
|
$35.800
|
$37.630
|
$21.000
|
$20.000
|
$36.300
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
14.000
|
$246.000
|
$325.500
|
$332.910
|
$300.000
|
$250.000
|
$330.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
61.000
|
$23.000
|
$10.900
|
$12.530
|
$5.000
|
$6.000
|
$11.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
121.000
|
$19.000
|
$1.100
|
$12.330
|
$5.000
|
$6.000
|
$11.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
82.000
|
$5.000
|
$10.900
|
$12.730
|
$5.000
|
$6.000
|
$11.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,014.000
|
$0.660
|
$1.500
|
$2.550
|
$1.000
|
$2.000
|
$1.320
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
5,291.000
|
$0.460
|
$2.200
|
$2.760
|
$1.000
|
$2.000
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
287.000
|
$0.500
|
$3.300
|
$3.310
|
$1.500
|
$6.000
|
$2.750
|
|
|
ELIM EXT PAV MRK & MRKS (18")
|
LF
|
394.000
|
$1.500
|
$4.900
|
$5.520
|
$2.000
|
$20.000
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,241.000
|
$2.000
|
$7.600
|
$8.260
|
$4.000
|
$20.000
|
$7.700
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
8.000
|
$80.000
|
$135.600
|
$141.750
|
$48.000
|
$250.000
|
$137.500
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$80.000
|
$157.300
|
$166.880
|
$54.000
|
$250.000
|
$160.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
16,265.000
|
$0.300
|
$0.600
|
$1.170
|
$0.100
|
$2.000
|
$0.280
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
689.000
|
$0.350
|
$0.900
|
$0.830
|
$0.100
|
$2.000
|
$0.610
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,385.000
|
$1.000
|
$2.200
|
$3.110
|
$1.000
|
$20.000
|
$1.950
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
14.000
|
$46.090
|
$54.300
|
$57.910
|
$12.000
|
$250.000
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$53.000
|
$65.100
|
$67.120
|
$18.000
|
$250.000
|
$66.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
253.000
|
$1.540
|
$5.500
|
$3.860
|
$0.100
|
$100.000
|
$3.300
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
6.000
|
$12,500.000
|
$16,867.400
|
$15,562.500
|
$10,744.000
|
$12,500.000
|
$23,066.250
|
|
|
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
|
EA
|
6.000
|
$50,000.000
|
$79,587.500
|
$54,041.670
|
$30,000.000
|
$45,000.000
|
$25,006.250
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
71.000
|
$463.000
|
$363.700
|
$401.810
|
$700.000
|
$325.000
|
$552.500
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
13.000
|
$463.000
|
$363.700
|
$401.630
|
$700.000
|
$325.000
|
$552.500
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
71.000
|
$463.000
|
$363.700
|
$401.810
|
$700.000
|
$325.000
|
$552.500
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
19.000
|
$463.000
|
$363.700
|
$401.600
|
$700.000
|
$325.000
|
$552.500
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
72.000
|
$463.000
|
$363.700
|
$401.670
|
$700.000
|
$325.000
|
$552.500
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
14.000
|
$463.000
|
$363.700
|
$400.940
|
$700.000
|
$325.000
|
$552.500
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
48.000
|
$1,350.000
|
$619.400
|
$608.750
|
$1,400.000
|
$8,500.000
|
$1,062.500
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
66.000
|
$250.000
|
$223.000
|
$263.440
|
$250.000
|
$300.000
|
$238.750
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
3.000
|
$300.000
|
$255.500
|
$331.250
|
$265.000
|
$300.000
|
$330.000
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)ALUM
|
EA
|
10.000
|
$370.000
|
$266.300
|
$363.440
|
$290.000
|
$300.000
|
$348.750
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
2,550.000
|
$4.500
|
$3.200
|
$4.710
|
$3.000
|
$3.000
|
$4.250
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
870.000
|
$5.000
|
$3.800
|
$4.810
|
$4.000
|
$3.000
|
$4.880
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
3,640.000
|
$5.000
|
$4.000
|
$6.630
|
$6.000
|
$3.000
|
$6.560
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
3,425.000
|
$10.000
|
$6.300
|
$9.310
|
$8.000
|
$3.000
|
$11.940
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
7,260.000
|
$3.000
|
$2.300
|
$3.970
|
$3.000
|
$3.000
|
$3.750
|
|
|
INS TRF SIG PL AM (S)1 ARM(24')
|
EA
|
2.000
|
$12,500.000
|
$11,153.900
|
$11,319.660
|
$12,000.000
|
$15,000.000
|
$17,881.250
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')LUM
|
EA
|
1.000
|
$14,500.000
|
$21,907.500
|
$14,012.440
|
$15,200.000
|
$16,000.000
|
$24,098.750
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
1.000
|
$16,000.000
|
$10,530.500
|
$11,479.210
|
$12,600.000
|
$18,000.000
|
$22,068.750
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
2.000
|
$16,500.000
|
$12,266.000
|
$12,399.020
|
$15,200.000
|
$19,000.000
|
$28,370.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
6.000
|
$17,500.000
|
$10,815.900
|
$12,419.090
|
$14,000.000
|
$22,000.000
|
$24,543.750
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
3.000
|
$18,500.000
|
$13,386.500
|
$12,926.000
|
$16,500.000
|
$23,000.000
|
$29,933.750
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$20,000.000
|
$14,471.300
|
$14,875.120
|
$17,800.000
|
$26,000.000
|
$32,615.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
6.000
|
$28,000.000
|
$13,954.900
|
$14,100.090
|
$18,100.000
|
$40,000.000
|
$34,001.250
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
1.000
|
$33,000.000
|
$15,664.400
|
$18,312.500
|
$21,400.000
|
$42,000.000
|
$39,538.750
|
|
|
PED POLE ASSEMBLY
|
EA
|
16.000
|
$6,000.000
|
$3,784.300
|
$3,281.250
|
$7,000.000
|
$8,500.000
|
$4,275.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
48.000
|
$1,800.000
|
$1,227.900
|
$1,695.830
|
$1,800.000
|
$1,850.000
|
$1,438.750
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
6.000
|
$6,500.000
|
$3,995.100
|
$4,709.380
|
$6,000.000
|
$6,500.000
|
$7,478.750
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
1.000
|
$500.000
|
$7,423.800
|
$3,637.500
|
$6,000.000
|
$10,000.000
|
$6,300.000
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
2.000
|
$50.000
|
$2,711.800
|
$2,618.750
|
$3,000.000
|
$5,000.000
|
$10,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$250.000
|
$180.800
|
$846.880
|
$750.000
|
$250.000
|
$525.000
|
|
|
ITS GND BOX (POLY) TY 1 (243624)W/APRN
|
EA
|
6.000
|
$10,000.000
|
$6,470.400
|
$5,867.710
|
$5,850.000
|
$3,500.000
|
$4,942.500
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
23.000
|
$4,500.000
|
$1,422.300
|
$1,709.380
|
$2,500.000
|
$3,000.000
|
$625.000
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
15.000
|
$4,500.000
|
$1,398.100
|
$1,709.380
|
$2,500.000
|
$3,000.000
|
$625.000
|
|
Totals: |
$3,244,516.830
|
$3,166,592.950
|
$3,279,598.080
|
$3,387,543.200
|
$3,814,902.000
|
$4,449,564.770
|