Show Job Controls
Bid Cobra

DALLAS SL 12 (0581-01-156)

Items: 93

County: DALLAS
Length: N/A
Highway: SL 12
District: DALLAS
Control Number: 0581-01-156
DBE Goal: N/A
Project: F 2023(169)
Guaranty: N/A
Time: 188 WORKING DAYS
Engineer's Estimate: $6,665,555.05
Date: 11/03/2022 (3 years ago)
Contract Number: N/A
Type: PLANING, CONCRETE FULL DEPTH REPAIR,OV & SIDEWALKS
Mail/Deliver Bids To: N/A
AMANDA MOSER
NATHAN PETTER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$6,665,555.05
$7,277,370.47
Over/Under Est: 9.18% $611,815.42
Over/Under Est: 11.21% $747,124.99
Amt Left: 1.86% $135,309.57
Over/Under Est: 17.14% $1,142,701.91
Amt Left: 7.3% $530,886.49
Delta: -5.34% -$395,576.92
$8,873,976.04
Over/Under Est: 33.13% $2,208,420.99
Amt Left: 21.94% $1,596,605.57
Delta: -13.65% -$1,065,719.08

Bid Items & Bid Tabulations

93 Total 0 of 93
DALLAS  |  SL 12  |  DALLAS  |  0581-01-156  |  11/03/2022  |  $6,665,555.05  |  F 2023(169)  |  PLANING, CONC FULL DEPTH REPAIR,OV &...  |  188 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
GIBSON & ASSOCIATES, INC.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 60.000 $2,000.000 $10,000.000 $2,000.000 $250.000 $6,323.720
REMOVING CONC (RIPRAP)
SY 148.000 $25.000 $20.000 $28.000 $125.000 $24.580
REMOVING CONC (SIDEWALKS)
SY 30.000 $40.000 $40.000 $50.000 $190.000 $86.040
REMOVING CONC (CURB)
LF 1,600.000 $10.000 $10.000 $10.000 $10.000 $7.120
REMOVING CONC (MISC)
SY 100.000 $25.000 $30.000 $50.000 $110.000 $30.730
COMPOST MANUF TOPSOIL (4")
SY 3,032.000 $3.500 $1.500 $5.000 $10.450 $6.150
BLOCK SODDING
SY 3,032.000 $4.500 $8.000 $6.000 $5.500 $7.380
DRILL SEED (TEMP)(WARM OR COOL)
SY 3,032.000 $0.350 $0.350 $0.750 $0.390 $0.920
VEGETATIVE WATERING
MG 900.000 $7.500 $18.000 $30.000 $66.000 $34.420
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 2,000.000 $85.000 $89.500 $111.690 $145.420 $110.010
PLANE ASPH CONC PAV(0" TO 2")
SY 115,139.000 $2.000 $1.500 $4.000 $2.300 $3.180
PAV JT UNDERSEAL (24")
LF 168.000 $35.000 $62.000 $92.210 $118.000 $102.540
FULL - DEPTH REPAIR CPCD (10")
SY 1,000.000 $250.000 $278.000 $278.000 $320.000 $483.490
FULL - DEPTH REPAIR CPJR (9")
SY 1,800.000 $300.000 $259.000 $259.000 $328.000 $461.660
FLOWABLE BACKFILL
CY 128.000 $250.000 $190.000 $235.000 $275.000 $229.170
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 1,382.000 $125.000 $100.000 $77.000 $77.000 $39.520
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,297.000 $188.000 $120.000 $170.000 $170.000 $313.350
RIPRAP (CONC)(4 IN)
CY 1.000 $750.000 $1,000.000 $1,200.000 $1,500.000 $6,145.900
RIPRAP (CONC)(5 IN)
CY 24.000 $500.000 $650.000 $750.000 $1,220.000 $735.030
RIPRAP (STONE PROTECTION)(18 IN)
CY 175.000 $153.000 $150.000 $230.000 $191.400 $225.990
CLEANING AND SEALING EXISTING JOINTS
LF 16,479.000 $3.000 $3.000 $3.000 $3.500 $9.220
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 168.000 $40.000 $5.000 $5.000 $15.000 $43.910
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 3,209.000 $39.000 $23.000 $23.000 $25.000 $44.960
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 3.000 $50,000.000 $48,000.000 $48,000.000 $39,600.000 $64,900.670
ADJUST STL SHOES
EA 39.000 $4,000.000 $3,500.000 $6,850.000 $6,850.000 $5,268.930
MOBILIZATION
LS 1.000 $716,750.390 $720,000.000 $741,268.000 $622,500.000 $860,425.600
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $25,000.000 $31,200.000 $50,000.000 $14,000.000 $14,750.150
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,100.000 $3.450 $2.850 $3.500 $3.140 $3.770
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,675.000 $0.810 $0.600 $1.000 $0.660 $0.900
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,263.000 $4.100 $4.500 $5.700 $4.950 $5.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,263.000 $1.250 $0.900 $0.700 $0.990 $1.670
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 1,575.000 $8.250 $8.000 $10.000 $8.800 $11.060
CONC CURB (TY II)
LF 1,380.000 $32.000 $12.000 $28.000 $71.500 $42.250
CONC SIDEWALKS (4")
SY 4,007.000 $80.000 $65.000 $75.000 $214.500 $98.420
CURB RAMPS (TY 1)
EA 2.000 $1,930.000 $2,000.000 $1,900.000 $8,250.000 $3,015.270
CURB RAMPS (TY 2)
EA 1.000 $2,662.000 $2,200.000 $1,800.000 $8,250.000 $3,925.990
CURB RAMPS (TY 5)
EA 1.000 $3,300.000 $2,200.000 $2,600.000 $8,250.000 $4,234.640
CONC SIDEWALKS (8")
SY 30.000 $200.000 $200.000 $120.000 $385.000 $137.780
RUMBLE STRIPS (SHOULDER)
LF 40,772.000 $0.200 $0.200 $0.100 $0.220 $0.450
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 13.000 $600.000 $500.000 $928.000 $300.000 $667.770
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 39.000 $26.250 $25.000 $24.540 $25.000 $42.210
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 10,839.000 $0.450 $0.400 $0.370 $0.550 $0.450
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 43,545.000 $0.250 $0.400 $0.330 $0.550 $0.450
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,252.000 $1.000 $0.550 $0.960 $5.000 $1.820
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 12,983.000 $1.200 $1.250 $1.000 $0.910 $1.230
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 702.000 $3.110 $3.000 $3.000 $4.400 $3.690
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 4,212.000 $4.400 $2.750 $3.500 $4.400 $4.300
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 4,721.000 $7.000 $6.500 $6.800 $6.050 $8.360
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 37.000 $140.000 $135.000 $125.000 $154.000 $153.650
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 37.000 $170.000 $175.000 $185.000 $178.200 $227.400
PAVEMENT SEALER 4"
LF 176,321.000 $0.150 $0.200 $0.140 $0.170 $0.170
PAVEMENT SEALER 8"
LF 10,330.000 $0.350 $0.350 $0.280 $0.390 $0.340
PAVEMENT SEALER 12"
LF 4,824.000 $1.100 $1.000 $1.000 $2.040 $1.230
PAVEMENT SEALER 24"
LF 2,596.000 $2.100 $2.000 $2.000 $2.810 $2.460
PAVEMENT SEALER (ARROW)
EA 31.000 $30.000 $75.000 $55.000 $60.500 $67.600
PAVEMENT SEALER (WORD)
EA 14.000 $42.000 $100.000 $67.000 $93.500 $82.360
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 44,679.000 $0.500 $0.500 $0.480 $0.610 $0.590
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 108,012.000 $0.450 $0.480 $0.440 $0.510 $0.540
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 108,012.000 $0.450 $0.480 $0.440 $0.510 $0.540
REFL PAV MRKR TY II-C-R
EA 3,038.000 $4.660 $4.000 $4.800 $3.960 $5.900
ELIM EXT PAV MRK & MRKS (4")
LF 176,321.000 $0.350 $0.650 $0.400 $0.570 $0.490
ELIM EXT PAV MRK & MRKS (8")
LF 10,330.000 $0.850 $0.750 $0.700 $0.830 $0.860
ELIM EXT PAV MRK & MRKS (12")
LF 4,824.000 $1.750 $1.000 $2.000 $3.300 $2.460
ELIM EXT PAV MRK & MRKS (24")
LF 2,596.000 $3.500 $2.000 $4.000 $4.400 $4.920
ELIM EXT PAV MRK & MRKS (ARROW)
EA 29.000 $53.000 $55.000 $50.000 $110.000 $61.460
ELIM EXT PAV MRK & MRKS (WORD)
EA 13.000 $70.000 $75.000 $60.000 $110.000 $73.750
PAV SURF PREP FOR MRK (4")
LF 176,321.000 $0.100 $0.100 $0.010 $0.060 $0.010
PAV SURF PREP FOR MRK (8")
LF 10,330.000 $0.200 $0.300 $0.010 $0.110 $0.010
PAV SURF PREP FOR MRK (12")
LF 4,824.000 $0.390 $1.000 $0.010 $0.830 $0.010
PAV SURF PREP FOR MRK (24")
LF 2,596.000 $1.000 $2.000 $0.010 $1.100 $0.010
PAV SURF PREP FOR MRK (ARROW)
EA 31.000 $37.000 $25.000 $0.010 $55.000 $0.010
PAV SURF PREP FOR MRK (WORD)
EA 14.000 $37.000 $35.000 $0.010 $55.000 $0.010
VEH LP DETECT (SAWCUT)
LF 4,733.000 $11.000 $26.750 $26.750 $29.430 $12.940
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 280.000 $50.000 $55.000 $96.000 $73.000 $61.950
FIBER REINFORCED POLYMER PATCHING MATLS
LB 6,800.000 $4.500 $6.000 $7.250 $8.250 $20.710
DRAIN INLET CLEANING
EA 85.000 $275.000 $700.000 $1,200.000 $250.000 $2,245.060
REP METAL POST W/ BASE PLATE(T4(S)RAIL)
EA 10.000 $150.000 $300.000 $100.000 $100.000 $491.670
REPAIR (STEEL RAIL)
LF 68.000 $230.000 $120.000 $360.000 $360.000 $281.970
CONCRETE RAIL REPAIR (IN-KIND)
LF 52.000 $700.000 $650.000 $490.000 $490.000 $281.520
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 785.000 $40.000 $47.000 $25.000 $25.000 $40.780
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 31.000 $110.000 $105.000 $150.000 $150.000 $151.210
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 82.000 $95.000 $76.000 $80.000 $75.000 $139.030
REP STL BRIDGE MEMBER (WELD REPAIR)
LF 11.000 $550.000 $1,650.000 $270.000 $270.000 $122.920
BRIDGE JOINT REPAIR (FULL DEPTH)
LF 106.000 $175.000 $110.000 $750.000 $750.000 $614.590
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 320.000 $500.000 $600.000 $1,300.000 $1,300.000 $557.210
SP MIXES SP-C SAC-B PG70-22
TON 13,932.600 $125.000 $140.000 $112.460 $121.000 $154.690
TACK COAT
GAL 12,666.000 $3.500 $1.500 $3.000 $3.300 $1.840
REPLACE ELASTOMERIC BEARING PADS
EA 23.000 $4,500.000 $3,000.000 $6,875.000 $4,700.000 $4,336.250
CONCRETE SCUPPER
EA 1.000 $2,200.000 $4,000.000 $9,375.000 $1,000.000 $21,481.140
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $12,000.000 $15,000.000 $8,800.000 $9,500.000 $6,145.900
GROUND BOX (PREPARE)
EA 29.000 $350.000 $675.000 $675.000 $742.500 $533.880
TMA (STATIONARY)
DAY 470.000 $200.000 $260.000 $19.720 $250.000 $184.380
TMA (MOBILE OPERATION)
DAY 83.000 $400.000 $600.000 $3.460 $350.000 $245.840
Totals: $6,665,555.050 $7,277,370.470 $7,412,680.046 $7,808,256.960 $8,873,976.044