Show Job Controls
Bid Cobra

DALLAS IH 35E (0442-02-166)

Items: 98

County: DALLAS
Length: 0.0000 MILES
Highway: IH 35E
District: DALLAS
Control Number: 0442-02-166
DBE Goal: 0.0%
Project: F 2026(690)
Guaranty: $100,000.00
Time: 310 WORKING DAYS
Engineer's Estimate: $13,090,782.97
Date: 05/07/2026 (4 weeks ago)
Contract Number: 5263239
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00141254
Contract Type: Federal
Project Description: FULL DEPTH CONCRETE REPAIR, FLEXIBLE PAVEMENT REPAIRS, BRIDGE REPAIRS AND PAVEMENT MARKINGS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$13,090,782.97
$11,542,445.93
Over/Under Est: -11.83% -$1,548,337.04
Over/Under Est: -10.76% -$1,408,326.14
Amt Left: 1.21% $140,010.90
Over/Under Est: -4.36% -$570,889.14
Amt Left: 8.47% $977,447.90
Delta: -7.17% -$837,437.00

Bid Items & Bid Tabulations

98 Total 0 of 98
DALLAS  |  IH 35E  |  DALLAS  |  0442-02-166  |  05/07/2026  |  $13,090,782.97  |  F 2026(690)  |  REHAB EXIST ROADWAY  |  310 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALTUS CONSTRUCTION LLC
RAGLE CONSTRUCTION, INC.
GIBSON & ASSOCIATES, INC.
PREPARING ROW
STA 11.000 $5,000.000 $52,467.010 $40,070.000 $6,600.000
REMOV CONC (RIPRAP)
SY 110.000 $20.000 $31.904 $25.000 $27.500
REMOV CONC (CURB)
LF 155.000 $20.000 $5.812 $15.000 $11.000
EXCAV (CHANNEL)
CY 1,912.000 $15.000 $7.395 $35.000 $33.000
EMBANK (FNL)(OC)(TY C)
CY 119.000 $27.000 $13.505 $40.000 $55.000
COMPOST MANUF TOPSOIL (4")
SY 1,771.000 $5.000 $1.439 $3.000 $8.800
BLOCK SODDING
SY 1,771.000 $4.000 $3.995 $13.750 $7.150
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 637.000 $5.000 $0.063 $2.500 $9.010
VEGETATIVE WATERING
TGL 358.000 $35.000 $5.520 $40.000 $291.500
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
SY 637.000 $3.250 $1.506 $3.000 $9.010
SP MIXES SP-C SAC-B PG76-22
TON 5,965.000 $125.000 $217.612 $180.000 $204.120
TACK COAT
GAL 5,965.000 $5.000 $1.615 $6.000 $0.010
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $100.000 $134.661 $90.000 $123.120
PLANE & TEXT ASPH CONC PAV(0" TO 3")
SY 8,927.000 $2.500 $21.511 $8.500 $8.780
PLANE ASPH CONC PAV(0" TO 2")
SY 54,193.000 $2.500 $3.143 $2.500 $2.960
FULL - DEPTH REPAIR CRCP (8")
SY 1,400.000 $250.000 $204.685 $245.000 $205.200
FULL - DEPTH REPAIR CRCP (13")
SY 700.000 $425.000 $323.186 $350.000 $324.000
FULL-DEPTH REP(BR APPR SLAB)(9"-13")
SY 3.000 $600.000 $276.963 $1,400.000 $1,500.000
FLOWABLE BACKFILL
CY 144.000 $250.000 $300.423 $270.000 $660.000
CL C CONC (ABUT)(HPC)(EXTEND)
CY 14.800 $600.000 $5,273.425 $1,500.000 $4,500.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 8.000 $200.000 $148.651 $400.000 $594.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 315.000 $120.000 $55.897 $50.000 $165.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 1,056.000 $125.000 $226.230 $90.000 $80.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 8,708.000 $100.000 $109.691 $125.000 $183.600
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 12.000 $350.000 $140.711 $250.000 $405.000
RIPRAP (CONC)(5 IN)
CY 58.000 $500.000 $530.897 $630.000 $693.000
RIPRAP (CONC)(FLUME)
CY 40.000 $600.000 $585.365 $680.000 $693.000
RIPRAP (MOW STRIP)(4 IN)
CY 164.000 $600.000 $439.535 $580.000 $693.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 2,018.000 $125.000 $132.987 $145.000 $172.800
RIPRAP (STONE PROTECTION)(18 IN)
CY 7,541.000 $150.000 $118.663 $145.000 $178.200
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 1,324.000 $40.000 $9.434 $18.000 $27.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 3,929.000 $50.000 $29.631 $23.000 $31.320
CLEANING EXISTING JOINTS
LF 504.000 $40.000 $14.867 $20.000 $27.000
POLYESTER POLYMER CONC OVERLAY (2")
SY 10,659.000 $220.000 $213.413 $210.000 $220.000
RETROFIT RAIL (TY SSTR)(HPC)
LF 1,568.100 $175.000 $147.675 $170.000 $161.700
RAISING EXIST STRUCT
EA 3.000 $25,000.000 $32,825.447 $45,000.000 $36,000.000
MOBILIZATION
LS 1.000 $1,238,743.422 $1,148,502.852 $1,100,000.000 $801,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $25,000.000 $30,375.637 $32,340.000 $35,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $15,000.000 $7,002.382 $25,000.000 $14,000.000
TMA (STATIONARY)
DAY 620.000 $225.000 $119.358 $300.000 $350.000
TMA (MOBILE OPERATION)
DAY 25.000 $400.000 $161.412 $680.000 $350.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 2,345.000 $35.000 $48.798 $70.000 $35.200
ROCK FILTER DAMS (REMOVE)
LF 2,345.000 $14.000 $6.821 $14.000 $16.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 848.000 $35.000 $23.866 $38.000 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 848.000 $11.000 $8.150 $12.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,725.000 $4.500 $1.820 $3.990 $3.630
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 1,000.000 $25.000 $1.763 $10.000 $5.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,725.000 $1.400 $0.909 $1.000 $1.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $15.000 $4.192 $5.000 $6.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $5.000 $0.302 $1.250 $1.100
PTB (FUR & INST)(STEEL)
LF 1,120.000 $150.000 $50.423 $150.000 $40.000
PTB (MOVE)(STEEL)
LF 1,840.000 $50.000 $9.935 $50.000 $9.410
PTB (REMOVE)(STEEL)
LF 1,120.000 $25.000 $21.791 $20.000 $10.740
CONC CURB (TY I)
LF 150.000 $50.000 $14.344 $22.000 $55.000
CONC CURB (TY II)
LF 5.000 $40.000 $24.130 $90.000 $88.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,162.500 $25.000 $20.841 $23.500 $27.280
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 17.000 $1,500.000 $1,892.664 $1,800.000 $2,194.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $3,000.000 $1,229.351 $1,200.000 $1,848.000
REMOVE METAL BEAM GUARD FENCE
LF 2,987.500 $3.000 $2.630 $2.500 $2.200
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $500.000 $255.353 $150.000 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,800.000 $3,447.860 $3,000.000 $3,729.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $700.000 $237.705 $250.000 $220.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $3,000.000 $586.349 $1,800.000 $1,259.500
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $3,000.000 $703.133 $1,000.000 $907.500
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,000.000 $6,747.916 $15,000.000 $8,563.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 55.000 $50.000 $16.344 $20.000 $16.500
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 50.000 $75.000 $22.000 $25.000 $27.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 968.000 $0.750 $0.747 $1.000 $7.000
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
LF 450.000 $3.000 $0.807 $1.000 $1.100
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 6.000 $1,100.000 $1,373.544 $1,450.000 $1,595.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 7.000 $2,250.000 $1,912.189 $2,250.000 $2,475.000
PAVEMENT SLER 6"
LF 90,078.000 $25.000 $0.150 $0.150 $0.170
PAVEMENT SLER (ENTR GORE)
EA 6.000 $500.000 $323.186 $400.000 $440.000
PAVEMENT SLER (EXIT GORE)
EA 7.000 $500.000 $538.644 $500.000 $550.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 18,016.000 $1.000 $0.570 $0.530 $0.580
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 36,031.000 $1.000 $0.538 $0.500 $0.550
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 36,031.000 $1.000 $0.538 $0.500 $0.550
REFL PAV MRKR TY II-C-R
EA 901.000 $8.000 $4.093 $3.750 $4.130
ELIM EXT PM & MRKS (6")
LF 90,078.000 $0.350 $0.635 $0.550 $0.610
ELIM EXT PM & MRKS (ENTR GORE)
EA 6.000 $500.000 $861.831 $300.000 $330.000
ELIM EXT PM & MRKS (EXIT GORE)
EA 7.000 $450.000 $1,292.747 $400.000 $440.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 6.000 $150.000 $538.644 $150.000 $165.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 7.000 $400.000 $861.831 $200.000 $220.000
LONGT CRACK CLEANING AND SEALING (CRCP)
LF 210.000 $50.000 $22.821 $25.000 $31.320
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 500.000 $65.000 $118.501 $95.000 $118.800
FIBER REINFORCED POLYMER PATCHING MATLS
LB 2,000.000 $6.000 $20.468 $10.000 $20.520
REPAIR (STEEL POST W/BASE PLATE)
EA 1.000 $300.000 $4,039.836 $1,500.000 $2,000.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 3.000 $200.000 $342.622 $900.000 $1,750.000
CONCRETE RAIL REPAIR (MISC)
LF 127.000 $200.000 $52.847 $30.000 $80.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 388.000 $40.000 $21.094 $25.000 $27.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 628.000 $25.000 $43.023 $25.000 $64.800
REP STL BRIDGE MBR (ANCHOR BOLT NUTS)
EA 3.000 $200.000 $296.170 $450.000 $250.000
BRIDGE JOINT REPLACEMENT (CONCRETE)
LF 409.000 $200.000 $420.095 $145.000 $520.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 963.000 $250.000 $379.990 $260.000 $615.000
CARBON FIBER REINF POLYMER STRENGTHNING
SF 114.000 $100.000 $38.831 $175.000 $105.000
CONCRETE BEAM REPAIR (CFRP)
EA 11.000 $10,000.000 $6,497.973 $3,500.000 $1,000.000
DECK DRAIN SYSTEM DLE
LS 1.000 $15,000.000 $4,039.836 $75,000.000 $22,000.000
BENT CAP/ABUTMENT CAP CLEANING
EA 3.000 $700.000 $605.221 $880.000 $1,188.000
Totals: $13,090,782.972 $11,542,445.863 $11,682,456.830 $12,519,893.830
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $125,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $150,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $250,000.00
Total: $525,000.00