Show Job Controls
Bid Cobra

DALLAS IH 35E (0442-02-161)

Items: 238

County: DALLAS
Length: 0.4240 MILES
Highway: IH 35E
District: DALLAS
Control Number: 0442-02-161
DBE Goal: 7.0%
Project: STP 2025(529)MM
Guaranty: $100,000.00
Time: 396 WORKING DAYS
Engineer's Estimate: $17,046,539.96
Date: 03/05/2025 (1 year ago)
Contract Number: 3253205
Type: CONSTRUCT NEW ROADWAY LANES
Project ID: A00061613
Contract Type: Federal
Project Description: CONSTRUCT INTERSECTION IMPROVEMENT, RECONSTRUCT EXISTING 4 CONTINUOUS TO 4 LANE CONTINUOUS FRONTAGE ROADS WITH THE ADDITION OF A TEXAS U-TURN AND SIDEWALKS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
NATHAN PETTER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$17,046,539.96
1
Awarded
$16,449,139.00
Over/Under Est: -3.5% -$597,400.96
Over/Under Est: 3.04% $518,773.48
Amt Left: 6.79% $1,116,174.44
Over/Under Est: 11.76% $2,004,435.85
Amt Left: 15.82% $2,601,836.81
Delta: -8.46% -$1,485,662.37
Over/Under Est: 19.44% $3,313,917.44
Amt Left: 23.78% $3,911,318.40
Delta: -6.87% -$1,309,481.59
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 18.88% $3,105,597.44
AXIS CONTRACTING, INC. 9.79% $1,610,370.71
MELS ELECTRIC, L.P. 8.49% $1,396,531.90
PEACHTREE CONSTRUCTION, LTD. 7.61% $1,251,779.48
OSCAR ORDUNO, INC. 3.07% $504,988.57
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.78% $292,794.67
BEAIRD DRILLING SERVICES, INC. 0.76% $125,013.46
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.49% $80,600.78
TRP CONSTRUCTION GROUP, LLC 0.38% $62,506.73
SUPERIOR TRAFFIC CONTROL, LLC 0.31% $50,992.33
S&S BRIDGE PAINTING 0.12% $19,738.97
PENHALL COMPANY 0.07% $11,514.40
EMERY SAPP & SON'S INC. 0.07% $11,514.40
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC 0.00% $0.00
Total: 51.82% $8,523,943.84

Bid Items & Bid Tabulations

238 Total 0 of 238
DALLAS  |  IH 35E  |  DALLAS  |  0442-02-161  |  03/05/2025  |  $17,046,539.96  |  STP 2025(529)MM  |  CONSTRUCT NEW ROADWAY LANES  |  396 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IBCTX, LLC
ED BELL CONSTRUCTION COMPANY
FLATIRON DRAGADOS CONSTRUCTORS, INC.
GREY SKY CONSTRUCTION LLC
PREPARING ROW
STA 12.250 $130,000.000 $25,000.000 $34,000.000 $57,500.000 $141,666.000
REMOV CONC (RIPRAP)
SY 218.000 $26.000 $22.000 $23.150 $65.000 $50.000
REMOV CONC (DRIVEWAYS)
SY 592.290 $14.000 $16.000 $36.340 $30.000 $50.000
REMOV CONC (CURB)
LF 629.000 $15.000 $16.000 $13.840 $10.000 $50.000
RMV (8"-14") TRT/UNTRT BASE & ASPH PAV
CY 10,257.020 $14.000 $20.000 $1.000 $5.000 $20.000
EXCAV (ROADWAY)
CY 7,600.130 $30.000 $40.000 $5.050 $20.000 $20.000
EMBANK (FNL)(DC)(TY C1)
CY 14,869.900 $25.000 $40.000 $29.150 $20.000 $40.000
EMBANK (FNL)(DC)(TY C2)
CY 1,650.580 $42.000 $44.000 $96.440 $75.000 $40.000
COMPOST MANUF TOPSOIL (4")
SY 19,402.000 $4.900 $4.000 $1.260 $4.000 $8.000
BLOCK SODDING
SY 19,451.000 $4.000 $10.000 $3.990 $4.550 $8.000
DRILL SEED (TEMP_WARM_COOL)
SY 1,983.000 $0.220 $2.000 $1.030 $0.750 $1.000
VEGETATIVE WATERING
TGL 3,181.000 $16.000 $1.000 $2.030 $10.000 $20.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 26.000 $100.000 $600.000 $283.520 $387.140 $500.000
LIME (QUICKLIME (SLURRY))
TON 509.000 $350.000 $440.000 $366.670 $502.400 $400.000
LIME TRT (EXIST MATL)(6")
SY 1,005.000 $20.000 $15.000 $13.330 $20.000 $10.000
LIME TRT (EXIST MATL)(10")
SY 16,839.000 $20.000 $5.000 $16.830 $25.000 $12.000
TACK COAT
GAL 60.000 $4.000 $3.000 $2.500 $6.000 $10.000
SP MIXES SP-B PG64-22
TON 4,313.000 $146.000 $170.000 $170.000 $201.000 $150.000
SP MIXES SP-C SAC-B PG64-22
TON 111.000 $175.000 $181.000 $182.000 $310.000 $250.000
CONC PVMT (CRCP) (10")
SY 15,512.000 $120.000 $130.000 $108.750 $155.000 $100.000
CONC PVMT (CRCP)(HES) (10")
SY 1,527.000 $175.000 $140.000 $188.250 $235.000 $150.000
TRENCH EXCAVATION PROTECTION
LF 2,728.000 $7.800 $25.000 $32.590 $2.500 $10.000
TEMPORARY SPL SHORING
SF 10,521.800 $50.000 $57.000 $71.160 $80.000 $55.000
DRILL SHAFT (36 IN)
LF 596.000 $255.000 $420.000 $357.280 $380.920 $400.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 11.000 $650.000 $520.000 $255.000 $495.000 $550.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 39.000 $700.000 $660.000 $330.000 $628.000 $600.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $800.000 $776.000 $550.000 $739.000 $750.000
CL C CONC (ABUT)(HPC)
CY 38.700 $1,550.000 $2,800.000 $3,068.260 $2,800.000 $2,000.000
CL C CONC (CAP)(HPC)
CY 20.500 $1,825.000 $2,800.000 $2,836.580 $3,000.000 $2,000.000
CL C CONC (COLUMN)(HPC)
CY 19.800 $1,590.000 $2,800.000 $2,355.080 $2,400.000 $2,000.000
REINF CONC SLAB (HPC)
SF 5,797.000 $35.000 $40.000 $42.160 $40.000 $20.000
BRIDGE SIDEWALK
SF 904.000 $17.000 $32.000 $29.410 $15.000 $50.000
APPROACH SLAB
CY 82.000 $842.000 $1,200.000 $1,430.800 $1,000.000 $2,000.000
RETAINING WALL (MSE)
SF 9,014.400 $87.000 $110.000 $157.100 $125.000 $150.000
RETAINING WALL (SPREAD FOOTING)
SF 975.000 $85.000 $140.000 $182.100 $150.000 $85.000
PRESTR CONC GIRDER (TX28)
LF 908.220 $200.000 $330.000 $464.350 $250.000 $210.000
RIPRAP (CONC)(4 IN)
CY 94.400 $726.000 $1,100.000 $1,025.090 $935.420 $550.000
RIPRAP (CONC)(CL B)(5 IN)
CY 2.000 $700.000 $2,000.000 $2,010.820 $800.190 $650.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,286.000 $235.000 $185.000 $229.430 $150.000 $200.000
STR STEEL (MISC NON-BRIDGE)
LB 178.000 $12.000 $55.000 $24.310 $25.000 $50.000
RAIL (TY T221)
LF 160.400 $70.000 $190.000 $123.960 $125.000 $185.000
RAIL (TY T221)(HPC)
LF 120.000 $78.000 $195.000 $172.770 $150.000 $250.000
RAIL (TY C221)
LF 707.200 $125.000 $225.000 $247.980 $275.000 $200.000
RAIL (TY C221)(HPC)
LF 120.900 $110.000 $230.000 $255.220 $150.000 $250.000
RAIL (TY PR11)
LF 121.000 $200.000 $200.000 $188.660 $150.000 $200.000
RAIL (HANDRAIL)(TY F)
LF 134.000 $161.000 $250.000 $290.390 $50.000 $185.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 102.000 $176.000 $320.000 $291.570 $434.680 $100.000
CONC BOX CULV (5 FT X 3 FT)
LF 205.000 $475.000 $575.000 $968.750 $1,500.000 $1,000.000
CONC BOX CULV (10 FT X 10 FT)
LF 1,370.000 $1,800.000 $975.000 $1,080.660 $1,550.000 $2,200.000
RC PIPE (CL III)(18 IN)
LF 265.000 $99.500 $75.000 $187.830 $213.940 $85.000
RC PIPE (CL III)(24 IN)
LF 1,174.000 $142.000 $110.000 $215.720 $250.000 $125.000
RC PIPE (CL III)(30 IN)
LF 961.000 $150.000 $145.000 $268.640 $260.000 $150.000
RC PIPE (CL III)(36 IN)
LF 497.000 $190.000 $200.000 $289.530 $270.000 $200.000
MANH (COMPL)(PRM)(48IN)
EA 1.000 $5,890.000 $7,000.000 $12,561.880 $10,000.000 $15,000.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 3.000 $4,475.000 $9,800.000 $8,035.920 $10,100.000 $12,500.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 2.000 $6,045.000 $9,500.000 $15,818.010 $12,000.000 $12,500.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 3.000 $7,035.000 $9,100.000 $17,017.610 $12,500.000 $13,500.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 2.000 $6,800.000 $11,500.000 $17,017.570 $12,500.000 $13,500.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 6.000 $10,000.000 $10,800.000 $18,511.870 $13,000.000 $15,000.000
INLET (COMPL)(PMBD)(4FT)
EA 1.000 $6,500.000 $9,200.000 $17,726.500 $10,000.000 $12,500.000
INLET (COMPL)(PMBD)(5FT)
EA 1.000 $7,500.000 $10,200.000 $25,225.800 $12,200.000 $15,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $8,625.000 $9,200.000 $11,253.300 $10,000.000 $14,500.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 6.000 $9,561.000 $8,400.000 $10,983.950 $12,500.000 $14,500.000
INLET (COMPL)(COB)(10 FT)(FTW)
EA 1.000 $12,000.000 $7,000.000 $14,133.750 $22,000.000 $20,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $24,200.000 $30,000.000 $39,984.580 $34,000.000 $55,500.000
WINGWALL (PW-MSE)
EA 1.000 $50,620.000 $50,000.000 $49,206.900 $130,000.000 $100,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 3.000 $1,500.000 $1,500.000 $1,554.670 $2,000.000 $1,850.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 9.000 $1,900.000 $2,000.000 $2,079.870 $5,000.000 $2,500.000
ADJUSTING MANHOLES
EA 5.000 $2,540.000 $2,000.000 $7,588.500 $4,000.000 $2,500.000
REMOV STR (INLET)
EA 3.000 $1,225.000 $2,000.000 $1,907.230 $1,300.000 $2,500.000
REMOV STR (SET)
EA 7.000 $605.000 $500.000 $341.110 $500.000 $500.000
REMOV STR (WINGWALL)
EA 3.000 $3,500.000 $6,000.000 $5,085.910 $2,100.000 $5,000.000
REMOV STR (PIPE)
LF 846.000 $36.000 $20.000 $25.400 $20.000 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $24,000.000 $100,000.000 $47,111.600 $40,000.000 $150,000.000
REMOV STR (RET WALL)
LF 88.000 $40.000 $150.000 $115.520 $60.000 $150.000
MOBILIZATION
LS 1.000 $1,512,275.000 $1,640,000.990 $1,700,000.000 $1,905,097.580 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $30,000.000 $25,000.000 $51,750.000 $19,000.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $14,000.000 $35,000.000 $15,000.000 $17,000.000 $20,000.000
TMA (STATIONARY)
DAY 61.000 $250.000 $150.000 $420.000 $191.670 $250.000
TMA (MOBILE OPERATION)
DAY 15.000 $390.000 $300.000 $1,575.000 $850.000 $550.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 652.000 $36.500 $48.000 $69.880 $35.000 $50.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 158.000 $84.000 $58.000 $80.630 $65.000 $50.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 31.000 $73.000 $79.000 $91.380 $80.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 842.000 $14.000 $37.000 $48.380 $13.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,832.000 $26.500 $20.000 $32.250 $35.000 $55.000
CONSTRUCTION EXITS (REMOVE)
SY 1,832.000 $10.000 $16.000 $17.740 $11.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,054.000 $3.500 $5.000 $2.960 $3.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,054.000 $1.100 $2.000 $1.340 $1.100 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 435.000 $5.000 $10.000 $5.380 $5.750 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 435.000 $2.200 $5.000 $2.690 $1.250 $9.000
CONSTRUCTING DETOURS
SY 5,455.000 $150.000 $122.000 $151.000 $150.000 $55.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 120.000 $77.000 $150.000 $163.430 $140.000 $120.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,200.000 $40.000 $60.000 $30.870 $81.690 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 200.000 $60.000 $60.000 $57.910 $115.900 $100.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 140.000 $7.000 $25.000 $24.560 $27.600 $30.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 60.000 $14.000 $25.000 $57.300 $91.400 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,200.000 $10.000 $30.000 $14.810 $11.780 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 200.000 $12.500 $30.000 $34.380 $19.320 $30.000
PORT CTB (PINNING)
EA 14.000 $72.000 $350.000 $100.000 $196.510 $500.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 714.000 $115.000 $150.000 $180.390 $244.260 $250.000
CONC CURB (MONO) (TY II)
LF 6,529.000 $17.000 $12.000 $6.500 $13.800 $20.000
DRIVEWAYS (CONC)
SY 786.000 $115.000 $127.000 $153.450 $141.330 $100.000
CONC SIDEWALKS (4")
SY 1,257.000 $125.000 $110.000 $106.160 $140.000 $55.000
CURB RAMPS (TY 2)
EA 2.000 $3,450.000 $3,200.000 $3,553.500 $3,300.000 $3,250.000
CURB RAMPS (TY 5)
EA 3.000 $2,750.000 $3,900.000 $5,257.930 $3,100.000 $3,250.000
CURB RAMPS (TY 7)
EA 5.000 $2,900.000 $3,300.000 $4,094.470 $3,100.000 $3,250.000
CURB RAMPS (TY 10)
EA 2.000 $2,700.000 $3,300.000 $4,094.470 $2,800.000 $3,250.000
CONC MEDIAN
SY 27.000 $125.000 $160.000 $408.470 $200.000 $250.000
RIGHT OF WAY MARKERS
EA 10.000 $306.000 $600.000 $600.000 $500.000 $500.000
MTL W-BEAM GD FEN (STEEL POST)
LF 143.000 $40.000 $34.000 $32.250 $32.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $2,200.000 $3,245.840 $2,100.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,540.000 $1,250.000 $2,100.000 $1,190.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 496.000 $5.000 $10.000 $5.250 $3.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $135.000 $500.000 $630.000 $215.000 $500.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $247.000 $500.000 $630.000 $250.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,390.000 $3,100.000 $3,360.000 $2,900.000 $3,520.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $335.000 $500.000 $735.000 $325.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $800.000 $2,500.000 $735.000 $800.000 $3,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $26,000.000 $35,000.000 $36,500.000 $28,000.000 $31,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $12,000.000 $11,000.000 $11,000.000 $7,755.000 $21,000.000
CHAIN LINK FENCE (INSTALL) (6')
LF 18.000 $40.000 $67.000 $105.000 $63.000 $20.000
CHAIN LINK FENCE (REMOVE)
LF 28.000 $15.000 $30.000 $21.000 $11.000 $3.000
GATE (INSTALL)(6'X10')
EA 1.000 $2,000.000 $1,700.000 $2,625.000 $1,600.000 $5,000.000
PIPE UNDERDRAINS (TY 6) (6")
LF 1,026.600 $41.500 $15.000 $45.000 $62.830 $60.000
RELOCATE EXISTING MAILBOX
EA 1.000 $550.000 $1,500.000 $500.000 $500.000 $1,500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 4.000 $1,055.000 $1,400.000 $945.000 $1,328.000 $1,500.000
REMOVE RD IL ASM (U/P)
EA 6.000 $525.000 $735.000 $525.000 $700.000 $1,500.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 6.000 $1,470.000 $2,265.000 $1,155.000 $2,155.000 $8,500.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 2.000 $2,100.000 $2,540.000 $1,155.000 $2,418.000 $10,000.000
CONDT (PVC) (SCH 40) (2")
LF 452.000 $19.000 $13.000 $10.000 $11.760 $30.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 717.000 $45.000 $35.000 $25.000 $33.000 $60.000
CONDT (PVC) (SCH 40) (3")
LF 1,355.000 $20.000 $14.000 $16.000 $13.210 $40.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 888.000 $68.000 $43.000 $33.000 $41.000 $70.000
CONDT (PVC) (SCH 40) (4")
LF 218.000 $20.000 $27.000 $18.000 $25.480 $50.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 167.000 $34.000 $54.000 $36.000 $51.000 $80.000
CONDT (PVC) (SCH 80) (2")
LF 30.000 $21.500 $15.000 $14.000 $14.000 $35.000
CONDT (RM) (3/4")
LF 70.000 $22.000 $41.000 $26.500 $39.000 $95.000
CONDT (RM) (1")
LF 420.000 $30.000 $46.000 $37.000 $43.000 $100.000
CONDT (RM) (2")
LF 100.000 $45.000 $58.000 $48.000 $55.000 $150.000
CONDUIT (PREPARE)
LF 40.000 $4.500 $8.000 $4.250 $7.370 $50.000
ITS MULTI-DUCT CND (PVC-40)
LF 570.000 $25.500 $41.000 $42.000 $38.550 $200.000
ITS MULTI-DUCT CND (RMC)
LF 490.000 $147.600 $296.000 $120.000 $281.750 $500.000
ELEC CONDR (NO.8) BARE
LF 1,365.000 $1.750 $2.000 $2.200 $1.890 $4.000
ELEC CONDR (NO.8) INSULATED
LF 5,819.000 $2.150 $3.000 $2.200 $1.950 $4.000
ELEC CONDR (NO.6) BARE
LF 2,778.000 $2.000 $4.000 $2.700 $2.930 $4.000
ELEC CONDR (NO.6) INSULATED
LF 1,987.000 $2.900 $4.000 $2.700 $3.430 $4.000
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 1.000 $8,635.000 $9,220.000 $6,100.000 $8,780.000 $5,000.000
REMOVE ITS GROUND BOX
EA 1.000 $835.000 $1,630.000 $2,700.000 $1,550.000 $500.000
GROUND BOX TY A (122311)W/APRON
EA 6.000 $1,170.000 $2,226.000 $1,400.000 $2,119.950 $1,500.000
GROUND BOX TY C (162911)W/APRON
EA 6.000 $1,825.000 $2,930.000 $1,500.000 $2,788.990 $1,500.000
GROUND BOX TY D (162922)W/APRON
EA 6.000 $2,450.000 $2,750.000 $1,600.000 $2,617.180 $1,500.000
REMOVE GROUND BOX
EA 4.000 $495.000 $268.000 $550.000 $255.000 $150.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 100.000 $11.000 $7.000 $6.300 $6.300 $10.000
TIMBER POLE (CL 2) 40 FT
EA 2.000 $2,325.000 $5,850.000 $2,750.000 $5,570.000 $5,000.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $450.000 $735.000 $1,100.000 $700.000 $6,500.000
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 1.000 $10,136.000 $17,530.000 $8,200.000 $16,695.980 $12,500.000
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 1.000 $11,507.000 $15,450.000 $9,000.000 $14,715.370 $12,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $785.000 $750.000 $750.000 $705.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $950.000 $980.000 $900.000 $930.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,260.000 $1,250.000 $1,300.000 $1,190.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,400.000 $1,360.000 $1,500.000 $1,295.000 $1,500.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $3,500.000 $2,170.000 $3,100.000 $2,060.000 $5,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $4,500.000 $2,780.000 $3,150.000 $2,640.000 $5,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $1,340.000 $720.000 $800.000 $670.000 $1,150.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 2.000 $360.000 $120.000 $900.000 $110.000 $250.000
IN SRSS & AM (RAIL)(130 MPH)(P MOUNT)
EA 2.000 $5,000.000 $4,450.000 $7,000.000 $4,220.000 $15,000.000
IN SRSS & AM (RAIL)(130 MPH)(T MOUNT)
EA 2.000 $7,000.000 $4,600.000 $7,000.000 $4,370.000 $15,000.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 6.000 $75.000 $50.000 $150.000 $44.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 17.000 $26.500 $25.000 $80.000 $22.000 $100.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 4.000 $250.000 $275.000 $250.000 $260.000 $100.000
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 517.000 $2.000 $3.000 $3.230 $2.300 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 17,675.000 $1.000 $1.000 $1.560 $0.900 $1.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 542.000 $7.800 $7.000 $16.930 $6.850 $20.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 9,884.000 $1.000 $1.000 $1.560 $0.900 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 118.000 $1.700 $3.000 $3.230 $2.100 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,639.000 $1.200 $2.000 $2.420 $1.050 $6.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 20.000 $4.000 $5.000 $10.750 $4.400 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 721.000 $9.000 $9.000 $16.130 $8.000 $20.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 14.000 $55.000 $72.000 $129.000 $69.000 $150.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 246.000 $7.300 $9.000 $16.130 $8.150 $20.000
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 370.000 $0.750 $1.000 $5.380 $0.780 $1.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 4,554.000 $0.550 $1.000 $3.230 $0.690 $1.000
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 6,038.000 $0.600 $1.000 $3.230 $0.690 $1.000
PAVEMENT SLER 6"
LF 10,962.000 $0.570 $0.250 $0.540 $0.190 $1.000
PAVEMENT SLER 8"
LF 1,757.000 $0.590 $0.500 $1.080 $0.290 $1.000
PAVEMENT SLER 12"
LF 20.000 $1.200 $1.000 $3.230 $0.870 $5.000
PAVEMENT SLER 24"
LF 967.000 $3.000 $2.000 $6.450 $1.650 $20.000
PAVEMENT SLER (YLD TRI)
EA 14.000 $52.000 $15.000 $53.750 $13.500 $150.000
PREFAB PM TY C (W)(ARROW)
EA 10.000 $215.000 $290.000 $392.380 $277.000 $250.000
PREFAB PM TY C (W)(UTURN ARROW)
EA 3.000 $420.000 $492.000 $833.130 $468.000 $250.000
PREFAB PM TY C (W)(WORD)
EA 10.000 $250.000 $384.000 $559.000 $365.000 $250.000
REFL PAV MRKR TY I-C
EA 93.000 $4.200 $6.000 $16.130 $5.000 $6.000
REFL PAV MRKR TY II-A-A
EA 88.000 $3.900 $6.000 $16.130 $5.000 $6.000
REFL PAV MRKR TY II-C-R
EA 26.000 $5.200 $6.000 $16.130 $5.000 $6.000
PAV SURF PREP FOR MRK (6")
LF 10,962.000 $0.360 $0.050 $0.480 $0.020 $1.000
PAV SURF PREP FOR MRK (8")
LF 1,757.000 $0.350 $0.100 $0.810 $0.080 $3.000
PAV SURF PREP FOR MRK (12")
LF 20.000 $0.900 $0.500 $2.960 $0.270 $6.000
PAV SURF PREP FOR MRK (24")
LF 967.000 $1.400 $0.750 $5.910 $0.580 $20.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 14.000 $15.500 $7.000 $43.000 $6.650 $150.000
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $35,950.000 $51,200.000 $60,000.000 $48,760.000 $65,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $8,000.000 $10,230.000 $6,000.000 $9,740.000 $15,000.000
TEMP TRAF SIGNALS
EA 1.000 $90,000.000 $91,770.000 $125,000.000 $87,400.000 $95,000.000
VEH SIG SEC (12")LED(GRN)
EA 10.000 $345.000 $480.000 $450.000 $455.000 $325.000
VEH SIG SEC (12")LED(GRN ARW)
EA 7.000 $344.000 $492.000 $450.000 $468.000 $325.000
VEH SIG SEC (12")LED(YEL)
EA 14.000 $344.000 $480.000 $450.000 $455.000 $325.000
VEH SIG SEC (12")LED(YEL ARW)
EA 6.000 $345.000 $492.000 $450.000 $468.000 $325.000
VEH SIG SEC (12")LED(RED)
EA 14.000 $344.000 $480.000 $450.000 $455.000 $325.000
VEH SIG SEC (12")LED(RED ARW)
EA 6.000 $347.000 $492.000 $450.000 $468.000 $325.000
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $925.000 $925.000 $800.000 $881.000 $6,500.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 14.000 $295.000 $270.000 $350.000 $256.000 $200.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 3.000 $315.000 $285.000 $360.000 $267.000 $250.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 4,853.000 $3.000 $4.000 $3.200 $3.280 $1.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 203.000 $4.000 $4.000 $3.200 $3.550 $1.000
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 1,782.000 $5.000 $5.000 $8.500 $3.980 $1.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 4,392.000 $6.000 $4.000 $2.150 $2.950 $1.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 1.000 $14,500.000 $15,270.000 $16,000.000 $14,539.000 $32,500.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $16,500.000 $17,710.000 $18,000.000 $16,865.000 $35,000.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $15,515.000 $18,555.000 $20,000.000 $17,670.000 $40,000.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $20,015.000 $22,650.000 $22,000.000 $21,540.000 $45,000.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 2.000 $32,275.000 $41,510.000 $45,000.000 $39,530.000 $50,000.000
PED POLE ASSEMBLY
EA 11.000 $3,920.000 $4,100.000 $2,500.000 $3,895.000 $6,500.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $1,260.000 $930.000 $1,200.000 $882.000 $1,850.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $4,150.000 $4,200.000 $4,000.000 $4,000.000 $6,500.000
REMOVAL OF CONDUIT
LF 360.000 $3.800 $5.000 $1.100 $4.580 $20.000
REMOVAL OF TIMBER POLES
EA 2.000 $560.000 $1,725.000 $1,100.000 $1,540.000 $1,500.000
INSTL DOWN GUY W/GUARD
EA 2.000 $1,040.000 $525.000 $700.000 $500.000 $1,500.000
REMOVE DOWN GUY W/GUARD
EA 2.000 $280.000 $265.000 $300.000 $250.000 $500.000
ANTI-GRAFFITI COATING (PERMNENT-TY II)
SF 6,069.800 $1.700 $5.000 $3.000 $1.500 $5.000
VIVDS TEMPORARY
EA 1.000 $7,720.000 $80,000.000 $18,000.000 $75,380.000 $80,000.000
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 1.000 $43,775.000 $11,500.000 $10,000.000 $10,896.000 $8,500.000
RVDS (PRESENCE DETECTION ONLY)
EA 6.000 $8,070.000 $10,500.000 $9,000.000 $9,895.000 $20,000.000
RVDS (ADVANCE DETENTION ONLY)
EA 4.000 $8,830.000 $13,200.000 $9,000.000 $12,530.000 $20,000.000
GROUND BOX (PREPARE)
EA 3.000 $540.000 $1,210.000 $500.000 $1,145.780 $2,500.000
FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER)
LF 2,480.000 $2.000 $15.000 $4.250 $13.860 $25.000
FIBER OPTIC FUSION SPLICE
EA 144.000 $275.000 $261.000 $60.000 $248.000 $500.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 4.000 $1,920.000 $3,900.000 $1,000.000 $3,675.000 $6,500.000
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 130.000 $7.500 $13.000 $3.500 $11.650 $20.000
REMOVE FIBER OPTIC CABLE
LF 2,190.000 $1.400 $2.000 $1.600 $1.180 $3.000
Totals: $17,046,539.960 $16,449,139.000 $17,565,313.420 $19,050,975.806 $20,360,457.400
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $6,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $170,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
Total: $376,000.00