DALLAS SH 352 (0430-01-066)

Items: 122

County: DALLAS
Length: 0.6100 MILES
Highway: SH 352
District: DALLAS
Control Number: 0430-01-066
DBE Goal: 0.0%
Project: STP 2026(446)HES
Guaranty: $46,000.00
Time: 160 WORKING DAYS
Engineer's Estimate: $2,316,554.90
Date: 03/05/2026 (3 months ago)
Contract Number: 3263207
Type: TRAFFIC SIGNAL IMPROVEMENTS
Project ID: A00193765
Contract Type: Federal
Project Description: IMPROVE TRAFFIC SIGNALS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTOPHER BLAIN
ERIC HERMAN
ANTHONY BLOCK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$2,316,554.90
$1,590,456.00
Over/Under Est: -31.34% -$726,098.90
$1,986,243.28
Over/Under Est: -14.26% -$330,311.62
Amt Left: 24.89% $395,787.28
Over/Under Est: -5.03% -$116,554.90
Amt Left: 38.33% $609,544.00
Delta: -10.76% -$213,756.72
Over/Under Est: -3.54% -$82,107.98
Amt Left: 40.49% $643,990.92
Delta: -1.57% -$34,446.92
Over/Under Est: -2.57% -$59,573.70
Amt Left: 41.91% $666,525.20
Delta: -1.01% -$22,534.28
Over/Under Est: 7.45% $172,677.90
Amt Left: 56.51% $898,776.80
Delta: -10.29% -$232,251.60
Over/Under Est: 20.16% $467,091.40
Amt Left: 75.02% $1,193,190.30
Delta: -11.83% -$294,413.50
$2,793,908.25
Over/Under Est: 20.61% $477,353.35
Amt Left: 75.67% $1,203,452.25
Delta: -0.37% -$10,261.95

Bid Items & Bid Tabulations

122 Total 0 of 122
DALLAS  |  SH 352  |  DALLAS  |  0430-01-066  |  03/05/2026  |  $2,316,554.90  |  STP 2026(446)HES  |  TRAF SIGNAL IMPRVS  |  160 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELECNOR BELCO ELECTRIC, INC.
SICE, INC.
AMERICAN LIGHTING AND SIGNALIZATION, LLC
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC
DURABLE SPECIALTIES, INC.
WG ENGINEERING & CONSTRUCTION, LLC
SELECT MAINTENANCE, L.L.C.
YUNEX LLC
REMOV CONC (PAV)
SY 90.000 $74.000 $159.000 $108.589 $115.000 $160.550 $94.000 $100.000 $140.000 $162.470
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 36.000 $88.000 $131.000 $83.039 $88.000 $132.270 $72.000 $75.000 $115.000 $133.850
REMOV CONC (CURB & GUTTER)
LF 232.000 $28.000 $45.000 $44.714 $47.000 $45.270 $39.000 $40.000 $38.000 $45.810
EXCAV (ROADWAY)
CY 56.300 $88.000 $76.000 $89.427 $94.000 $76.730 $77.000 $80.000 $70.000 $77.650
BLOCK SODDING
SY 85.000 $30.000 $21.000 $15.331 $30.000 $28.420 $45.000 $15.000 $20.000 $4.570
LOOSE AGGR GRND COVER (TY II)
CY 3.300 $48.000 $533.000 $287.441 $1,078.000 $952.000 $880.000 $945.000 $500.000 $206.970
REWORK BS MTL (TY C)(8")(ORD COMP)
SY 56.000 $155.000 $44.000 $83.039 $88.000 $44.270 $72.000 $75.000 $50.000 $44.800
CONC PVMT (CRCP)(FAST TRK) (12")
SY 140.000 $287.560 $306.000 $304.049 $321.000 $310.470 $262.000 $280.000 $350.000 $314.170
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 16.000 $650.000 $356.000 $194.496 $350.000 $385.610 $590.000 $465.000 $350.000 $508.380
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 66.000 $525.000 $356.000 $249.873 $396.000 $523.600 $650.000 $510.000 $525.000 $589.900
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 117.000 $600.000 $404.000 $507.068 $485.000 $552.160 $720.000 $635.000 $650.000 $664.570
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $850.000 $541.000 $630.807 $805.000 $568.820 $845.000 $898.000 $750.000 $994.550
RIPRAP (CONC)(6 IN)
CY 3.100 $1,100.000 $1,758.000 $1,533.018 $1,617.000 $1,785.000 $1,320.000 $1,400.000 $2,500.000 $1,806.230
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 1.000 $1,000.000 $2,344.000 $3,960.296 $4,176.000 $773.500 $3,410.000 $3,650.000 $600.000 $3,010.390
MOBILIZATION
LS 1.000 $205,000.000 $58,000.000 $168,021.497 $91,657.480 $218,463.890 $82,000.000 $163,850.000 $280,000.000 $329,493.490
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,500.000 $5,800.000 $7,391.189 $2,694.000 $3,956.230 $8,000.000 $6,889.000 $30,000.000 $15,178.340
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 50.000 $165.000 $97.000 $320.011 $81.000 $65.450 $75.000 $150.000 $75.000 $144.500
TMA (STATIONARY)
DAY 160.000 $234.000 $268.000 $470.717 $255.000 $339.770 $185.000 $285.000 $100.000 $578.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 530.000 $8.000 $19.000 $10.221 $1.000 $9.520 $1.000 $8.000 $8.000 $7.610
BIODEG EROSN CONT LOGS (REMOVE)
LF 530.000 $2.000 $4.000 $2.556 $1.000 $2.380 $0.500 $3.000 $1.000 $2.860
COLORED TEXTURED CONC (6")
SY 13.000 $470.000 $204.000 $301.494 $318.000 $206.880 $260.000 $275.000 $250.000 $209.350
CONC CURB (TY II)
LF 126.000 $55.000 $42.000 $102.202 $108.000 $42.590 $88.000 $90.000 $40.000 $43.100
CONC CURB & GUTTER (TY II)
LF 285.000 $66.000 $80.000 $121.364 $128.000 $81.250 $105.000 $110.000 $75.000 $82.220
CONC SIDEWALKS (6")
SY 195.000 $120.000 $119.000 $153.302 $162.000 $120.000 $132.000 $145.000 $150.000 $121.430
CURB RAMPS (TY 2)
EA 2.000 $4,000.000 $2,930.000 $3,960.296 $4,176.000 $2,975.000 $3,410.000 $3,680.000 $2,500.000 $3,010.390
CURB RAMPS (TY 5)
EA 4.000 $5,280.000 $3,516.000 $5,365.562 $5,658.000 $3,570.000 $4,620.000 $5,000.000 $3,000.000 $3,612.460
CURB RAMPS (TY 7)
EA 23.000 $3,750.000 $2,930.000 $4,599.053 $4,850.000 $2,975.000 $3,960.000 $4,300.000 $2,500.000 $3,010.390
FIXED BOLLARD
EA 4.000 $975.000 $4,453.000 $1,022.012 $1,078.000 $952.000 $880.000 $1,554.000 $1,250.000 $1,806.230
CONC MEDIAN (MONO NOSE)
SY 47.000 $400.000 $189.000 $249.116 $263.000 $190.970 $215.000 $235.000 $200.000 $193.250
IN RD IL (TY SA) 30T-8 (250W EQ) LED
EA 2.000 $5,400.000 $4,079.000 $3,999.257 $3,402.000 $5,145.560 $5,500.000 $5,245.000 $6,500.000 $5,333.200
CONDT (PVC) (SCH 40) (2") (BORE)
LF 55.000 $45.000 $40.000 $33.462 $27.000 $43.790 $52.000 $30.000 $60.000 $54.550
CONDT (PVC) (SCH 40) (3")
LF 675.000 $26.000 $23.000 $23.233 $20.000 $17.020 $28.000 $26.000 $30.000 $42.450
CONDT (PVC) (SCH 40) (4")
LF 190.000 $32.000 $33.000 $10.284 $31.000 $19.640 $29.000 $30.000 $30.000 $43.410
CONDT (PVC) (SCH 40) (4") (BORE)
LF 1,605.000 $50.000 $28.000 $42.473 $40.000 $35.220 $54.000 $48.000 $60.000 $68.700
CONDT (PVC) (SCH 80) (2")
LF 640.000 $24.000 $22.000 $19.608 $19.000 $14.040 $27.000 $26.000 $30.000 $30.650
CONDUIT (PREPARE)
LF 690.000 $2.000 $4.500 $2.773 $5.300 $4.400 $1.000 $7.000 $1.000 $9.270
ELEC CONDR (NO.12) INSULATED
LF 960.000 $2.000 $1.400 $0.805 $3.200 $1.670 $2.000 $2.500 $1.500 $3.050
ELEC CONDR (NO.8) INSULATED
LF 3,130.000 $3.000 $2.000 $1.411 $3.700 $2.380 $3.000 $3.000 $2.000 $3.610
ELEC CONDR (NO.6) BARE
LF 3,155.000 $3.000 $2.600 $1.499 $3.900 $2.500 $4.000 $3.000 $2.100 $3.810
ELEC CONDR (NO.6) INSULATED
LF 330.000 $3.000 $2.600 $2.011 $4.400 $2.740 $4.000 $3.350 $2.300 $4.090
TRAY CABLE (3 CONDR) (12 AWG)
LF 3,755.000 $4.000 $2.800 $10.859 $4.400 $2.860 $4.000 $3.000 $3.500 $3.880
GROUND BOX TY D (162922)W/APRON
EA 23.000 $2,215.000 $1,758.000 $2,040.646 $2,668.000 $1,586.270 $2,280.000 $2,355.000 $3,500.000 $3,612.460
REMOVE GROUND BOX
EA 18.000 $260.000 $250.000 $638.758 $450.000 $503.370 $350.000 $400.000 $200.000 $457.580
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 4.000 $10,250.000 $4,298.000 $8,680.734 $9,769.000 $11,791.360 $10,000.000 $9,889.000 $25,000.000 $9,010.680
ALUMINUM SIGNS (TY A)
SF 216.000 $52.000 $47.000 $96.690 $53.000 $52.360 $45.000 $45.000 $60.000 $49.590
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 5.000 $700.000 $488.000 $1,273.491 $1,400.000 $841.760 $400.000 $1,152.000 $700.000 $919.480
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,840.000 $2.000 $1.150 $1.597 $1.900 $1.490 $1.500 $2.500 $1.250 $1.510
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 2,990.000 $11.000 $7.000 $8.113 $10.000 $7.560 $8.000 $13.500 $6.350 $7.650
REFL PAV MRK TY I (W)(RR XING)(090MIL)
EA 2.000 $654.000 $528.000 $862.323 $472.000 $803.250 $385.000 $650.000 $675.000 $812.810
PAVEMENT SLER 6"
LF 6,910.000 $0.370 $0.300 $0.230 $0.200 $0.210 $1.500 $0.300 $0.180 $0.220
PAVEMENT SLER 8"
LF 2,840.000 $0.600 $0.350 $0.256 $0.270 $0.240 $0.200 $0.500 $0.200 $0.250
PAVEMENT SLER 24"
LF 2,990.000 $3.000 $1.200 $0.767 $2.700 $0.710 $2.000 $4.000 $0.600 $0.730
PAVEMENT SLER (ARROW)
EA 28.000 $22.000 $71.000 $25.551 $20.000 $23.800 $16.000 $28.000 $20.000 $24.090
PAVEMENT SLER (WORD)
EA 25.000 $40.000 $71.000 $25.551 $27.000 $23.800 $22.000 $38.000 $20.000 $24.090
PAVEMENT SLER (RR XING)
EA 2.000 $95.000 $118.000 $38.326 $162.000 $35.700 $132.000 $223.000 $30.000 $36.130
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 2,060.000 $1.000 $1.500 $1.150 $1.500 $1.070 $2.000 $2.000 $0.900 $1.090
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 685.000 $1.000 $1.600 $0.920 $1.500 $0.860 $2.000 $2.000 $0.720 $0.870
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 3,665.000 $1.000 $1.600 $0.920 $1.500 $0.860 $2.000 $2.000 $0.720 $0.870
PREFAB PM TY C (W)(ARROW)
EA 28.000 $255.000 $241.000 $287.441 $296.000 $267.750 $242.000 $410.000 $225.000 $270.940
PREFAB PM TY C (W)(WORD)
EA 25.000 $300.000 $288.000 $325.767 $317.000 $303.450 $255.000 $435.000 $255.000 $307.060
REFL PAV MRKR TY I-C
EA 167.000 $6.000 $6.000 $5.047 $5.300 $4.700 $5.000 $7.350 $3.950 $4.760
REFL PAV MRKR TY II-A-A
EA 268.000 $7.000 $6.000 $5.047 $5.300 $4.700 $5.000 $7.350 $3.950 $4.760
REFL PAV MRKR TY II-C-R
EA 471.000 $8.000 $7.000 $5.047 $5.300 $4.700 $5.000 $7.350 $3.950 $4.760
ELIM EXT PM & MRKS (4")
LF 10,265.000 $1.000 $0.800 $0.703 $0.880 $0.650 $1.000 $1.500 $0.550 $0.670
ELIM EXT PM & MRKS (6")
LF 400.000 $1.000 $0.800 $0.703 $1.400 $0.650 $1.000 $2.000 $0.550 $0.670
ELIM EXT PM & MRKS (8")
LF 2,670.000 $2.000 $0.900 $0.831 $1.800 $0.770 $1.000 $3.000 $0.650 $0.790
ELIM EXT PM & MRKS (12")
LF 1,885.000 $2.000 $1.200 $1.981 $2.700 $1.840 $2.000 $4.000 $1.550 $1.870
ELIM EXT PM & MRKS (24")
LF 730.000 $5.000 $2.400 $3.833 $5.400 $3.570 $4.000 $8.000 $3.000 $3.620
ELIM EXT PM & MRKS (ARROW)
EA 16.000 $65.000 $94.000 $61.321 $61.000 $57.120 $50.000 $85.000 $48.000 $57.800
ELIM EXT PM & MRKS (WORD)
EA 7.000 $65.000 $94.000 $61.321 $74.000 $57.120 $60.000 $105.000 $48.000 $57.800
ELIM EXT PM & MRKS (RR XING)
EA 2.000 $185.000 $176.000 $249.116 $242.000 $232.050 $200.000 $335.000 $195.000 $234.810
PAV SURF PREP FOR MRK (6")
LF 6,910.000 $0.250 $0.300 $0.064 $0.090 $0.060 $0.050 $0.150 $0.050 $0.070
PAV SURF PREP FOR MRK (8")
LF 2,840.000 $0.500 $0.300 $0.103 $0.130 $0.100 $0.100 $0.200 $0.080 $0.100
PAV SURF PREP FOR MRK (24")
LF 2,990.000 $0.600 $0.900 $0.307 $0.810 $0.290 $1.000 $1.500 $0.240 $0.290
PAV SURF PREP FOR MRK (ARROW)
EA 28.000 $15.000 $24.000 $12.776 $13.000 $11.900 $11.000 $19.000 $10.000 $12.050
PAV SURF PREP FOR MRK (WORD)
EA 25.000 $20.000 $24.000 $12.776 $20.000 $11.900 $16.000 $30.000 $10.000 $12.050
PAV SURF PREP FOR MRK (RR XING)
EA 2.000 $45.000 $59.000 $57.489 $108.000 $53.550 $88.000 $150.000 $45.000 $54.190
PAV SURF PREP FOR MRK (RPM)
EA 906.000 $1.000 $1.000 $0.320 $0.070 $0.300 $0.100 $0.200 $0.250 $0.310
REMOVING TRAFFIC SIGNALS
EA 4.000 $10,000.000 $5,000.000 $5,470.756 $24,039.000 $22,719.480 $5,000.000 $12,858.000 $10,000.000 $25,148.720
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 4.000 $35,000.000 $13,600.000 $11,761.109 $25,446.000 $56,898.660 $30,000.000 $60,525.000 $65,000.000 $43,438.290
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $35,000.000 $3,900.000 $3,581.459 $43,428.000 $13,287.540 $8,000.000 $28,582.000 $25,000.000 $15,389.070
VEH SIG SEC (12")LED(GRN)
EA 40.000 $350.000 $224.000 $312.370 $450.000 $334.390 $700.000 $403.000 $300.000 $445.540
VEH SIG SEC (12")LED(GRN ARW)
EA 20.000 $350.000 $224.000 $286.422 $450.000 $340.340 $700.000 $403.000 $300.000 $445.540
VEH SIG SEC (12")LED(YEL)
EA 44.000 $350.000 $224.000 $287.280 $450.000 $334.390 $700.000 $403.000 $300.000 $445.540
VEH SIG SEC (12")LED(YEL ARW)
EA 28.000 $350.000 $224.000 $285.420 $450.000 $340.340 $700.000 $403.000 $300.000 $445.540
VEH SIG SEC (12")LED(RED)
EA 44.000 $350.000 $224.000 $287.280 $450.000 $334.390 $700.000 $403.000 $300.000 $445.540
VEH SIG SEC (12")LED(RED ARW)
EA 20.000 $350.000 $224.000 $285.787 $450.000 $340.340 $700.000 $403.000 $300.000 $445.540
PED SIG SEC (LED)(COUNTDOWN)
EA 44.000 $850.000 $721.000 $740.768 $779.000 $809.200 $1,200.000 $1,200.000 $1,500.000 $842.910
BACKPLATE W/REFL BRDR(4 SEC)
EA 2.000 $255.000 $121.000 $400.275 $316.000 $159.460 $230.000 $245.000 $215.000 $287.500
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 44.000 $250.000 $121.000 $358.943 $314.000 $197.540 $210.000 $260.000 $215.000 $246.860
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 14.000 $350.000 $187.000 $424.483 $395.000 $266.560 $230.000 $270.000 $215.000 $287.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,415.000 $3.500 $2.800 $1.960 $5.800 $2.860 $3.000 $3.000 $3.200 $4.470
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 1,945.000 $4.000 $2.800 $2.296 $6.300 $3.210 $3.000 $3.500 $3.500 $4.890
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 4,130.000 $6.000 $4.000 $3.457 $8.300 $4.520 $6.000 $4.000 $4.100 $6.060
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 2,865.000 $8.000 $7.600 $6.511 $12.000 $6.550 $8.000 $6.000 $7.000 $8.830
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 7,155.000 $4.000 $2.000 $1.799 $6.200 $1.900 $2.000 $3.000 $3.100 $4.400
INS TRF SIG PL AM(S)1 ARM(32')ILSN
EA 2.000 $17,510.000 $9,941.000 $11,392.940 $14,289.000 $13,499.360 $15,300.000 $10,349.000 $15,000.000 $14,571.450
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
EA 4.000 $17,276.000 $12,026.000 $14,416.391 $15,848.000 $15,807.960 $17,100.000 $12,536.000 $16,500.000 $16,653.430
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
EA 1.000 $18,000.000 $13,265.000 $15,914.337 $18,082.000 $17,344.250 $19,300.000 $14,424.000 $19,000.000 $19,278.480
INS TRF SIG PL AM(S)1 ARM(44')ILSN
EA 1.000 $18,253.000 $12,288.000 $14,321.223 $16,839.000 $15,931.720 $17,900.000 $14,070.000 $18,000.000 $18,059.880
INS TRF SIG PL AM(S)1 ARM(44')LUM&ILSN
EA 1.000 $18,000.000 $13,946.000 $16,378.075 $19,570.000 $17,797.640 $19,600.000 $15,903.000 $19,000.000 $19,715.590
INS TRF SIG PL AM(S)1 ARM(48')ILSN
EA 3.000 $20,800.000 $13,915.000 $16,207.140 $18,388.000 $17,616.760 $18,600.000 $16,535.000 $18,500.000 $19,684.280
INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN
EA 2.000 $20,200.000 $16,011.000 $18,657.127 $20,043.000 $19,938.450 $20,300.000 $18,732.000 $19,500.000 $21,778.300
INS TRF SIG PL AM(S)1 ARM(55')LUM&ILSN
EA 1.000 $41,200.000 $35,402.000 $39,296.617 $44,726.000 $40,436.360 $38,200.000 $35,275.000 $34,000.000 $42,291.040
INS TRF SIG PL AM(S)1 ARM(60')ILSN
EA 1.000 $41,000.000 $33,543.000 $36,879.628 $43,336.000 $37,962.190 $35,300.000 $34,191.000 $32,000.000 $41,578.180
INS TRF SIG PL AM(S)2 ARM(40-28')ILSN
EA 1.000 $30,500.000 $16,654.000 $19,704.517 $20,408.000 $22,861.090 $21,200.000 $20,639.000 $20,000.000 $24,469.580
PED POLE ASSEMBLY
EA 30.000 $2,550.000 $2,110.000 $3,571.962 $2,103.000 $3,772.300 $6,000.000 $4,125.000 $2,100.000 $4,590.110
PED DETECT PUSH BUTTON (APS)
EA 44.000 $1,200.000 $1,205.000 $1,026.324 $1,031.000 $1,066.240 $975.000 $1,354.000 $1,500.000 $899.510
PED DETECTOR CONTROLLER UNIT
EA 5.000 $3,950.000 $3,858.000 $3,963.210 $4,288.000 $3,985.310 $5,500.000 $3,954.000 $4,000.000 $4,377.100
VIVDS PROSR SYS
EA 4.000 $5,600.000 $12,779.000 $12,292.359 $14,859.000 $12,304.600 $5,000.000 $24,085.000 $35,000.000 $7,330.280
VIVDS CAM ASSY FXD LNS
EA 14.000 $7,500.000 $2,610.000 $2,463.709 $2,680.000 $3,215.380 $7,400.000 $7,500.000 $10,000.000 $8,246.300
VIVDS CABLING
LF 3,215.000 $4.000 $1.600 $1.373 $3.400 $2.500 $3.000 $3.000 $2.750 $4.680
VIVDS PROSR SYS (INSTALL ONLY)
EA 1.000 $1,500.000 $488.500 $607.903 $813.000 $2.380 $450.000 $1,650.000 $1,250.000 $915.160
VIVDS CAM ASSY (INSTALL ONLY)
EA 4.000 $1,500.000 $488.000 $911.855 $813.000 $1,385.160 $1,250.000 $1,650.000 $1,250.000 $457.580
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 4.000 $9,215.000 $9,173.000 $10,366.737 $10,450.000 $10,245.900 $8,600.000 $8,255.000 $15,000.000 $8,108.770
GROUND BOX (PREPARE)
EA 9.000 $790.000 $244.000 $383.255 $500.000 $545.020 $150.000 $465.000 $150.000 $402.790
ITS COM CBL (ETHERNET)
LF 635.000 $5.000 $3.000 $1.763 $3.700 $4.050 $4.000 $3.000 $2.750 $15.930
FIELD HARDENED ETHERNET SWITCH RELOCATE
EA 4.000 $750.000 $485.000 $385.256 $250.000 $2,552.690 $150.000 $502.000 $1,000.000 $1,493.150
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 380.000 $3.500 $1.600 $2.366 $5.400 $7.020 $12.000 $6.000 $5.000 $17.310
FIBER OPTIC FUSION SPLICE
EA 16.000 $80.000 $80.000 $40.402 $54.000 $524.610 $300.000 $60.000 $100.000 $191.470
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 4.000 $1,950.000 $1,548.000 $945.361 $2,627.000 $3,380.610 $1,550.000 $2,350.000 $1,500.000 $7,851.080
FO SPLICE ENCLOSURE (TYPE 1)
EA 4.000 $2,815.000 $1,182.000 $792.060 $2,662.000 $3,380.610 $2,400.000 $2,350.000 $1,500.000 $3,781.040
Totals: $2,316,554.900 $1,590,456.000 $1,986,243.166 $2,200,000.000 $2,234,446.919 $2,256,981.200 $2,489,232.800 $2,783,646.300 $2,793,908.249
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
MATERIALS FURNISHED BY CITY (PART) $60,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $3,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
MATERIALS FURNISHED BY CITY (PART) $44,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $5,000.00
RAILROAD FORCE ACCOUNT WORK (PART) $25,000.00
Total: $138,500.00