Show Job Controls
Bid Cobra

DALLAS SH 114 (0353-06-068)

Items: 43

County: DALLAS
Length: N/A
Highway: SH 114
District: DALLAS
Control Number: 0353-06-068
DBE Goal: N/A
Project: NH 2020(660)
Guaranty: N/A
Time: 192 WORKING DAYS
Engineer's Estimate: $863,963.01
Date: 03/05/2020 (6 years ago)
Contract Number: N/A
Type: INSTALL GUIDE SIGNS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$863,963.01
$861,230.00
Over/Under Est: -0.32% -$2,733.01
Over/Under Est: 1.67% $14,423.26
Amt Left: 1.99% $17,156.27
Over/Under Est: 2.84% $24,496.24
Amt Left: 3.16% $27,229.25
Delta: -1.15% -$10,072.98
Over/Under Est: 8.08% $69,794.25
Amt Left: 8.42% $72,527.26
Delta: -5.10% -$45,298.01
Over/Under Est: 8.43% $72,791.55
Amt Left: 8.77% $75,524.56
Delta: -0.32% -$2,997.30
Over/Under Est: 18.07% $156,121.39
Amt Left: 18.45% $158,854.40
Delta: -8.90% -$83,329.84
Over/Under Est: 39.69% $342,900.18
Amt Left: 40.13% $345,633.19
Delta: -18.31% -$186,778.79
$1,350,622.88
Over/Under Est: 56.33% $486,659.87
Amt Left: 56.82% $489,392.88
Delta: -11.91% -$143,759.69

Bid Items & Bid Tabulations

43 Total 0 of 43
DALLAS  |  SH 114  |  DALLAS  |  0353-06-068  |  03/05/2020  |  $863,963.01  |  NH 2020(660)  |  INSTL GUIDE SIGNS  |  192 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MICA CORPORATION
CREATIVE DESIGN CONCEPTS, LLC
SELECT MAINTENANCE, L.L.C.
AMERICAN LIGHTING AND SIGNALIZATION, LLC
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SYNERGY SIGNS & SERVICES LLC
FLORIDA TRAFFIC CONTROL DEVICES, INC.
ALTUS CONSTRUCTION LLC
REMOVING CONCRETE(MOW STRIP)
LF 126.000 $8.000 $42.000 $100.000 $10.000 $33.050 $49.330 $20.000 $54.760 $11.200
DRILL SHAFT (SIGN MTS) (24 IN)
LF 10.000 $150.000 $168.000 $120.000 $200.000 $157.080 $152.540 $165.000 $281.260 $242.320
DRILL SHAFT (SIGN MTS) (42 IN)
LF 32.000 $170.000 $346.000 $150.000 $250.000 $358.460 $313.300 $400.000 $374.650 $446.700
DRILL SHAFT (SIGN MTS) (48 IN)
LF 80.000 $200.000 $393.000 $180.000 $300.000 $467.810 $385.390 $450.000 $453.880 $660.680
DRILL SHAFT (SIGN MTS) (54 IN)
LF 17.000 $511.000 $410.000 $200.000 $500.000 $478.080 $503.050 $485.000 $575.940 $807.730
RIPRAP (MOW STRIP)(4 IN)
CY 103.000 $510.000 $598.000 $700.000 $450.000 $511.160 $609.630 $425.000 $725.560 $486.890
MOBILIZATION
LS 1.000 $54,362.070 $86,000.000 $15,000.000 $88,000.000 $94,704.720 $85,698.910 $50,000.000 $120,118.070 $134,622.290
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,000.000 $7,825.000 $2,125.000 $14,000.000 $3,481.150 $9,522.000 $20,000.000 $3,065.230 $18,357.590
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 100.000 $3.000 $36.000 $0.720 $5.000 $14.190 $9.260 $10.000 $8.210 $5.520
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.000 $10.000 $0.720 $2.000 $11.990 $4.310 $2.000 $2.050 $1.490
MTL W-BEAM GD FEN (TIM POST)
LF 1,450.000 $22.000 $16.160 $26.000 $17.500 $21.090 $20.850 $21.500 $30.120 $21.120
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $1,310.000 $923.000 $2,500.000 $1,000.000 $1,251.690 $1,153.250 $1,250.000 $1,300.540 $1,254.040
REMOVE METAL BEAM GUARD FENCE
LF 562.500 $3.000 $2.400 $5.000 $3.000 $4.870 $4.900 $3.000 $3.420 $2.730
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $275.000 $240.000 $500.000 $125.000 $210.400 $164.130 $250.000 $308.020 $241.200
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $300.000 $240.000 $500.000 $125.000 $210.400 $164.130 $250.000 $308.020 $216.390
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,100.000 $2,475.000 $2,500.000 $2,575.000 $3,024.800 $2,859.130 $2,850.000 $3,251.350 $2,676.780
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $580.000 $250.000 $350.000 $476.700 $411.630 $350.000 $308.020 $287.810
ALUMINUM SIGNS (TY A)
SF 21.920 $21.000 $22.400 $19.000 $40.000 $19.940 $39.220 $24.000 $28.910 $42.830
ALUMINUM SIGNS (TY G)
SF 67.500 $26.000 $23.250 $19.000 $30.000 $26.590 $45.260 $24.000 $31.520 $36.720
ALUMINUM SIGNS (TY O)
SF 1,676.750 $26.000 $20.550 $19.000 $22.000 $22.860 $25.800 $21.000 $27.590 $29.980
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 438.090 $18.000 $21.200 $13.000 $30.000 $20.790 $27.420 $23.000 $26.800 $30.600
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 393.500 $29.000 $18.300 $28.000 $30.000 $23.280 $34.610 $23.000 $38.340 $36.720
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 8,257.500 $29.000 $27.450 $28.250 $28.500 $36.730 $25.800 $23.000 $40.440 $28.150
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $475.000 $640.000 $1,000.000 $300.000 $753.900 $609.320 $525.000 $1,437.730 $673.110
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $565.000 $695.000 $1,100.000 $300.000 $811.100 $668.770 $625.000 $1,508.510 $703.710
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 4.000 $632.000 $847.000 $1,200.000 $325.000 $876.000 $824.910 $685.000 $1,588.970 $795.500
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
EA 5.000 $1,736.000 $1,640.000 $1,600.000 $700.000 $1,270.900 $1,203.590 $1,225.000 $2,039.760 $2,202.910
IN SM RD SN SUP&AM TY10BWG(2)SB(P-EXAL)
EA 1.000 $1,290.000 $1,670.000 $1,700.000 $600.000 $1,352.300 $1,288.800 $1,350.000 $2,141.190 $1,835.760
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 3.000 $750.000 $1,015.000 $1,500.000 $350.000 $1,002.500 $957.600 $830.000 $1,746.920 $917.880
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $800.000 $1,050.000 $1,600.000 $450.000 $1,090.500 $1,049.290 $955.000 $1,856.070 $1,119.810
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 7.000 $800.000 $1,165.000 $1,700.000 $425.000 $1,156.500 $1,118.690 $1,050.000 $1,938.690 $1,223.840
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 6.000 $1,475.000 $1,835.000 $2,000.000 $650.000 $1,488.700 $1,483.850 $1,550.000 $2,310.000 $2,141.720
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 6.000 $2,175.000 $2,235.000 $2,800.000 $1,000.000 $1,519.500 $2,447.630 $1,950.000 $2,129.550 $2,325.290
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,075.000 $2,235.000 $2,900.000 $1,100.000 $1,569.000 $2,180.500 $2,050.000 $2,363.810 $2,753.640
REMOVE SM RD SN SUP&AM
EA 33.000 $75.000 $184.000 $50.000 $120.000 $120.100 $106.500 $75.000 $115.730 $139.520
INSTALL LRSS (STRUCT STEEL)
LB 290.000 $8.000 $5.550 $9.000 $10.000 $7.510 $16.480 $4.500 $8.350 $7.770
REMOVE LRSA
EA 3.000 $675.000 $700.000 $150.000 $550.000 $955.730 $1,278.000 $1,250.000 $1,019.040 $3,671.520
INS OH SN SUP(30 FT CANT)
EA 1.000 $27,600.000 $14,120.000 $34,500.000 $18,000.000 $13,868.200 $14,575.300 $19,200.000 $17,445.900 $27,903.530
INS OH SN SUP(35 FT CANT)
EA 6.000 $18,000.000 $16,005.000 $34,850.000 $17,000.000 $15,784.400 $16,868.400 $22,260.000 $19,901.870 $28,943.790
INS OH SN SUP(40 FT CANT)
EA 1.000 $22,830.000 $18,705.000 $36,000.000 $20,000.000 $18,611.400 $19,823.900 $23,150.000 $23,858.620 $32,431.730
REMOVE OVERHD SIGN SUP
EA 13.000 $5,375.000 $1,075.000 $1,000.000 $800.000 $1,366.600 $2,130.000 $5,000.000 $4,384.460 $10,402.630
REMOVE SIGN WALKWAY
EA 4.000 $800.000 $555.000 $1,100.000 $800.000 $1,145.650 $2,130.000 $1,500.000 $3,507.570 $1,835.760
TMA (STATIONARY)
DAY 200.000 $182.000 $138.000 $4.000 $100.000 $266.400 $217.150 $175.000 $538.540 $244.770
Totals: $863,963.010 $861,230.028 $878,386.275 $888,459.250 $933,757.286 $936,754.575 $1,020,084.400 $1,206,863.202 $1,350,622.903