PREPARING ROW
|
STA
|
32.000
|
$4,000.000
|
$33,825.000
|
$15,000.000
|
$1,518.000
|
$49,595.890
|
$119,000.000
|
$130,000.000
|
$1,000.000
|
|
|
|
REMOVING CONC (PAV)
|
SY
|
13,679.000
|
$7.000
|
$6.200
|
$20.000
|
$4.120
|
$5.000
|
$7.350
|
$4.390
|
$6.500
|
|
|
|
REMOVING CONC (FLOORS)
|
SY
|
317.000
|
$100.000
|
$169.000
|
$20.000
|
$88.910
|
$160.000
|
$175.480
|
$84.390
|
$105.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
3,046.000
|
$8.000
|
$4.250
|
$20.000
|
$7.870
|
$6.250
|
$5.040
|
$5.390
|
$10.000
|
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
4,132.000
|
$12.300
|
$1.900
|
$20.000
|
$3.480
|
$2.750
|
$2.760
|
$10.000
|
$7.000
|
|
|
|
REMOVING CONC (CTB)
|
LF
|
2,213.000
|
$18.200
|
$23.100
|
$50.000
|
$15.160
|
$13.550
|
$4.270
|
$15.000
|
$30.000
|
|
|
|
REMOVING CONC (HEADWALL)
|
CY
|
16.300
|
$320.000
|
$328.000
|
$500.000
|
$270.810
|
$150.000
|
$124.710
|
$311.110
|
$265.000
|
|
|
|
REMOVING CONC (FLUME)
|
SY
|
184.000
|
$18.900
|
$15.200
|
$50.000
|
$12.480
|
$7.000
|
$5.490
|
$20.000
|
$10.000
|
|
|
|
REMOV STR (SCREEN WALL)
|
LF
|
719.000
|
$30.000
|
$18.500
|
$50.000
|
$17.010
|
$6.500
|
$33.100
|
$15.630
|
$45.000
|
|
|
|
REMOVE CONCRETE (MSE PANELS)
|
SF
|
545.000
|
$20.000
|
$4.850
|
$75.000
|
$10.800
|
$9.000
|
$20.390
|
$17.500
|
$7.500
|
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
8,303.000
|
$11.500
|
$7.900
|
$6.310
|
$3.160
|
$4.500
|
$5.390
|
$8.000
|
$6.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
16,750.000
|
$10.000
|
$3.450
|
$2.670
|
$2.550
|
$2.000
|
$2.870
|
$4.000
|
$3.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
43,656.000
|
$8.000
|
$5.950
|
$7.000
|
$4.960
|
$10.000
|
$10.000
|
$9.230
|
$12.000
|
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
48,497.000
|
$12.000
|
$7.550
|
$12.000
|
$3.150
|
$2.500
|
$23.000
|
$2.810
|
$21.000
|
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
9,200.000
|
$25.000
|
$16.900
|
$15.000
|
$24.090
|
$22.000
|
$39.000
|
$17.000
|
$21.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C3)
|
CY
|
65,963.000
|
$14.000
|
$43.500
|
$15.000
|
$45.400
|
$7.000
|
$48.000
|
$37.770
|
$21.000
|
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
44,855.000
|
$1.650
|
$1.550
|
$0.870
|
$1.880
|
$0.900
|
$0.710
|
$1.620
|
$2.000
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
44,855.000
|
$0.500
|
$0.150
|
$0.090
|
$0.180
|
$0.150
|
$0.270
|
$0.260
|
$0.250
|
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
44,855.000
|
$0.500
|
$0.150
|
$0.090
|
$0.180
|
$0.150
|
$0.270
|
$0.260
|
$0.250
|
|
|
|
VEGETATIVE WATERING
|
MG
|
7,784.800
|
$13.000
|
$20.000
|
$15.620
|
$21.800
|
$1.100
|
$20.200
|
$19.800
|
$18.000
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
18,684.000
|
$55.000
|
$37.250
|
$39.920
|
$39.000
|
$33.000
|
$49.460
|
$38.860
|
$50.000
|
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
34,589.000
|
$35.000
|
$14.100
|
$12.160
|
$15.550
|
$15.000
|
$13.550
|
$16.550
|
$31.000
|
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(14")
|
SY
|
8,766.000
|
$22.000
|
$16.300
|
$13.480
|
$17.640
|
$18.000
|
$17.270
|
$17.980
|
$31.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,121.200
|
$5.000
|
$4.000
|
$5.000
|
$4.400
|
$4.600
|
$4.390
|
$3.970
|
$4.000
|
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
14,162.000
|
$70.000
|
$63.250
|
$64.000
|
$68.000
|
$67.000
|
$64.650
|
$57.520
|
$75.000
|
|
|
|
SUPERPAVE MIXTURES SP-C PG76-22
|
TON
|
2,175.000
|
$80.000
|
$103.000
|
$69.000
|
$112.000
|
$72.000
|
$69.700
|
$64.260
|
$75.000
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
14,638.000
|
$62.000
|
$69.000
|
$70.000
|
$76.300
|
$70.000
|
$50.000
|
$75.640
|
$68.000
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (10.5")
|
SY
|
19,652.000
|
$60.000
|
$60.000
|
$59.270
|
$65.000
|
$58.000
|
$40.000
|
$60.720
|
$60.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
139.300
|
$118.000
|
$225.000
|
$137.560
|
$140.400
|
$85.000
|
$84.130
|
$85.000
|
$100.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
4,512.000
|
$1.660
|
$1.000
|
$2.850
|
$21.160
|
$10.000
|
$1.100
|
$1.000
|
$10.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
76,436.000
|
$18.000
|
$15.700
|
$14.160
|
$13.500
|
$14.800
|
$25.750
|
$10.000
|
$33.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,139.000
|
$155.000
|
$138.000
|
$143.630
|
$131.570
|
$150.000
|
$127.070
|
$132.950
|
$135.000
|
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
2,144.000
|
$175.000
|
$162.000
|
$181.980
|
$168.360
|
$165.000
|
$160.600
|
$174.310
|
$222.000
|
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
232.000
|
$350.000
|
$262.000
|
$292.890
|
$276.010
|
$265.000
|
$255.390
|
$277.910
|
$345.000
|
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
272.000
|
$700.000
|
$660.000
|
$713.460
|
$661.710
|
$760.000
|
$616.980
|
$675.540
|
$700.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
10.000
|
$122.400
|
$220.000
|
$199.860
|
$242.050
|
$175.000
|
$222.550
|
$195.000
|
$400.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
34.000
|
$399.000
|
$380.000
|
$379.680
|
$418.090
|
$390.000
|
$384.400
|
$375.000
|
$800.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
35.000
|
$500.000
|
$520.000
|
$455.910
|
$572.120
|
$495.000
|
$526.020
|
$450.000
|
$1,000.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
160.000
|
$158.000
|
$209.000
|
$165.420
|
$229.950
|
$154.000
|
$211.420
|
$209.980
|
$190.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
116.000
|
$250.000
|
$418.000
|
$252.630
|
$459.900
|
$275.000
|
$422.840
|
$419.950
|
$300.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
232.000
|
$288.000
|
$643.000
|
$354.670
|
$707.450
|
$385.000
|
$650.450
|
$646.000
|
$400.000
|
|
|
|
CL B CONC (FLUME)
|
CY
|
102.300
|
$450.000
|
$370.000
|
$335.000
|
$559.160
|
$750.000
|
$400.000
|
$380.460
|
$400.000
|
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
365.500
|
$800.000
|
$1,070.000
|
$893.640
|
$796.060
|
$1,400.000
|
$524.950
|
$1,008.770
|
$800.000
|
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
284.000
|
$1,000.000
|
$681.000
|
$672.030
|
$764.240
|
$970.000
|
$716.090
|
$1,128.540
|
$1,500.000
|
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
865.400
|
$1,200.000
|
$645.000
|
$647.280
|
$661.530
|
$925.000
|
$596.800
|
$1,069.790
|
$900.000
|
|
|
|
CL C CONC (FOOTING)(HPC)
|
CY
|
11.100
|
$800.000
|
$899.000
|
$1,207.410
|
$1,023.750
|
$1,200.000
|
$428.120
|
$1,087.800
|
$900.000
|
|
|
|
CL C CONC (FOOTING)(HPC)(MASS)
|
CY
|
39.200
|
$210.000
|
$811.000
|
$816.220
|
$663.560
|
$750.000
|
$549.290
|
$796.400
|
$800.000
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
74.500
|
$430.000
|
$441.000
|
$365.000
|
$422.730
|
$350.000
|
$424.550
|
$425.920
|
$400.000
|
|
|
|
CL A CONC (CHANNEL LINING)
|
CY
|
147.000
|
$450.000
|
$630.000
|
$400.000
|
$482.030
|
$600.000
|
$479.870
|
$596.360
|
$390.000
|
|
|
|
CL C CONC (HPC)
|
CY
|
69.100
|
$750.000
|
$2,120.000
|
$2,114.700
|
$1,054.250
|
$1,400.000
|
$741.200
|
$1,812.730
|
$1,200.000
|
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
62,838.000
|
$14.000
|
$18.100
|
$14.010
|
$17.750
|
$20.000
|
$12.000
|
$16.070
|
$16.000
|
|
|
|
BRIDGE MEDIAN (HPC)
|
SF
|
10,588.000
|
$10.000
|
$7.000
|
$6.530
|
$7.360
|
$7.500
|
$5.430
|
$5.970
|
$6.000
|
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
24,168.000
|
$8.000
|
$11.000
|
$12.220
|
$27.010
|
$8.000
|
$8.060
|
$8.390
|
$11.000
|
|
|
|
APPROACH SLAB (HPC)
|
CY
|
593.000
|
$450.000
|
$307.000
|
$434.060
|
$451.120
|
$345.000
|
$291.340
|
$370.000
|
$375.000
|
|
|
|
CIP BOX (HPC)
|
CY
|
1,764.400
|
$1,200.000
|
$1,000.000
|
$991.740
|
$1,238.000
|
$1,200.000
|
$651.000
|
$1,750.000
|
$1,600.000
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
132,667.000
|
$53.000
|
$32.250
|
$53.680
|
$36.000
|
$55.000
|
$36.610
|
$35.820
|
$70.000
|
|
|
|
PRESTR CONC U - BEAM (U40)
|
LF
|
3,363.390
|
$200.000
|
$210.000
|
$350.000
|
$213.000
|
$200.000
|
$188.720
|
$195.570
|
$220.000
|
|
|
|
PRESTR CONC U - BEAM (U54)
|
LF
|
1,638.000
|
$225.000
|
$215.000
|
$400.000
|
$253.170
|
$240.000
|
$185.520
|
$191.230
|
$220.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
430.700
|
$500.000
|
$367.000
|
$310.000
|
$388.790
|
$325.000
|
$435.050
|
$345.240
|
$425.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
397.700
|
$500.000
|
$387.000
|
$325.000
|
$466.350
|
$315.000
|
$401.720
|
$450.000
|
$600.000
|
|
|
|
ELASTOMERIC BEARING (LAMINATED)
|
EA
|
170.000
|
$967.000
|
$295.000
|
$42.430
|
$450.100
|
$310.000
|
$223.710
|
$288.350
|
$575.000
|
|
|
|
ELASTOMERIC BEARING (SPECIAL)
|
EA
|
4.000
|
$2,100.000
|
$1,190.000
|
$300.510
|
$2,038.480
|
$3,200.000
|
$1,767.230
|
$4,559.120
|
$1,950.000
|
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
15,040.000
|
$9.940
|
$2.900
|
$1.940
|
$2.260
|
$2.800
|
$1.910
|
$1.830
|
$2.500
|
|
|
|
STR STEEL (MISC NON-BRIDGE) (CABLE)
|
LB
|
15,794.000
|
$12.000
|
$12.400
|
$16.450
|
$11.870
|
$21.000
|
$20.000
|
$7.610
|
$25.000
|
|
|
|
STR STEEL (MISC NON-BRIDGE) (TRUSS)
|
LB
|
336,444.000
|
$9.620
|
$2.950
|
$4.410
|
$4.400
|
$5.000
|
$3.000
|
$4.160
|
$2.500
|
|
|
|
STR STEEL(MISC NON-BRDG)(POST & PLATES)
|
LB
|
18,978.000
|
$9.000
|
$12.600
|
$5.350
|
$6.160
|
$4.700
|
$4.420
|
$4.880
|
$3.000
|
|
|
|
RAIL (TY T221)
|
LF
|
6,159.000
|
$55.000
|
$37.500
|
$53.200
|
$47.500
|
$50.000
|
$74.750
|
$61.210
|
$65.000
|
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
657.800
|
$50.000
|
$53.500
|
$62.640
|
$62.000
|
$85.000
|
$96.480
|
$113.570
|
$68.000
|
|
|
|
RAIL (TY T551)
|
LF
|
852.000
|
$70.000
|
$40.000
|
$58.900
|
$61.000
|
$45.000
|
$50.850
|
$68.510
|
$64.000
|
|
|
|
RAIL (TY C221)
|
LF
|
1,840.000
|
$83.000
|
$91.500
|
$76.470
|
$66.000
|
$75.000
|
$76.430
|
$93.100
|
$76.000
|
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
359.000
|
$115.000
|
$125.000
|
$83.990
|
$72.000
|
$110.000
|
$74.750
|
$82.840
|
$90.000
|
|
|
|
RAIL (TY T551RW)
|
LF
|
1,701.000
|
$70.000
|
$57.500
|
$61.480
|
$62.500
|
$51.000
|
$71.030
|
$88.640
|
$60.000
|
|
|
|
RAIL (TY C221) (HPC) (MOD)
|
LF
|
822.600
|
$73.000
|
$218.000
|
$133.820
|
$142.000
|
$130.000
|
$103.040
|
$149.780
|
$130.000
|
|
|
|
RAIL (TY LOW PROF BR RAIL)(MOD)
|
LF
|
904.500
|
$80.000
|
$118.000
|
$47.030
|
$86.000
|
$87.000
|
$67.290
|
$81.600
|
$60.000
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
751.000
|
$90.000
|
$65.500
|
$69.460
|
$74.120
|
$82.000
|
$78.040
|
$113.120
|
$70.000
|
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
340.000
|
$355.000
|
$225.000
|
$206.000
|
$203.900
|
$245.000
|
$250.000
|
$202.500
|
$280.000
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
12.000
|
$336.000
|
$245.000
|
$224.000
|
$212.560
|
$240.000
|
$400.000
|
$270.100
|
$300.000
|
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
380.000
|
$410.000
|
$327.000
|
$303.000
|
$285.400
|
$325.000
|
$400.000
|
$306.750
|
$300.000
|
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
857.000
|
$468.000
|
$424.000
|
$401.000
|
$390.550
|
$400.000
|
$500.000
|
$399.250
|
$500.000
|
|
|
|
CONC BOX CULV (8 FT X 8 FT)
|
LF
|
1,330.000
|
$700.000
|
$550.000
|
$498.000
|
$785.000
|
$500.000
|
$700.000
|
$700.000
|
$800.000
|
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
14.000
|
$64.000
|
$56.000
|
$52.690
|
$154.300
|
$80.000
|
$55.430
|
$96.000
|
$80.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,495.000
|
$70.000
|
$63.000
|
$55.050
|
$74.340
|
$90.000
|
$43.450
|
$60.850
|
$93.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,539.000
|
$83.000
|
$79.000
|
$65.640
|
$74.860
|
$100.000
|
$56.320
|
$68.000
|
$105.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
776.000
|
$100.000
|
$96.000
|
$77.570
|
$93.690
|
$120.000
|
$75.440
|
$84.750
|
$130.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
499.000
|
$145.000
|
$125.000
|
$98.450
|
$117.220
|
$140.000
|
$92.380
|
$114.500
|
$150.000
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
371.000
|
$108.000
|
$66.000
|
$57.070
|
$58.570
|
$90.000
|
$45.210
|
$83.250
|
$105.000
|
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
339.000
|
$100.000
|
$88.000
|
$66.730
|
$97.460
|
$115.000
|
$63.790
|
$82.900
|
$117.000
|
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
291.000
|
$97.000
|
$106.000
|
$84.310
|
$95.280
|
$130.000
|
$79.680
|
$100.750
|
$140.000
|
|
|
|
RC PIPE (CL V)(12 IN)
|
LF
|
126.000
|
$115.000
|
$59.000
|
$65.850
|
$54.020
|
$90.000
|
$40.370
|
$80.000
|
$105.000
|
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
10.000
|
$3,092.000
|
$2,400.000
|
$2,136.070
|
$2,188.450
|
$3,400.000
|
$1,809.820
|
$1,384.000
|
$4,750.000
|
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
2.000
|
$5,243.000
|
$5,450.000
|
$6,309.270
|
$4,766.060
|
$6,000.000
|
$4,183.820
|
$5,391.000
|
$5,800.000
|
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
4.000
|
$6,280.000
|
$4,630.000
|
$3,748.970
|
$4,096.740
|
$5,000.000
|
$3,549.000
|
$4,743.000
|
$5,400.000
|
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
23.000
|
$6,074.000
|
$4,600.000
|
$3,845.070
|
$4,085.170
|
$4,800.000
|
$3,362.260
|
$4,687.000
|
$9,400.000
|
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
4.000
|
$3,850.000
|
$5,600.000
|
$3,757.350
|
$3,728.480
|
$3,500.000
|
$3,582.330
|
$2,689.000
|
$5,360.000
|
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
4.000
|
$5,261.000
|
$4,640.000
|
$4,744.190
|
$2,750.440
|
$4,100.000
|
$3,582.330
|
$3,869.000
|
$5,360.000
|
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
5.000
|
$5,070.000
|
$5,110.000
|
$4,781.810
|
$4,314.430
|
$4,500.000
|
$3,537.900
|
$4,198.000
|
$5,850.000
|
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
15.000
|
$2,180.000
|
$4,990.000
|
$4,913.380
|
$4,184.020
|
$4,400.000
|
$3,328.580
|
$3,991.000
|
$5,850.000
|
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
4.000
|
$4,550.000
|
$5,240.000
|
$4,874.430
|
$3,675.510
|
$4,500.000
|
$4,019.000
|
$4,435.000
|
$5,400.000
|
|
|
|
INLET (COMPL)(RWI)(TY II)
|
EA
|
10.000
|
$5,500.000
|
$3,860.000
|
$6,171.480
|
$4,057.210
|
$4,200.000
|
$3,804.790
|
$3,734.000
|
$5,800.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$4,400.000
|
$1,750.000
|
$7,576.450
|
$2,674.530
|
$2,900.000
|
$4,081.890
|
$1,854.000
|
$1,750.000
|
|
|
|
WINGWALL (PW - 1) (HW=14 FT)
|
EA
|
1.000
|
$59,755.000
|
$140,851.400
|
$27,179.220
|
$87,678.910
|
$120,000.000
|
$104,816.680
|
$83,042.940
|
$91,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$10,196.000
|
$11,550.000
|
$9,689.080
|
$15,264.400
|
$11,000.000
|
$62,734.320
|
$12,243.000
|
$20,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$13,225.000
|
$9,520.000
|
$14,602.890
|
$11,153.670
|
$12,000.000
|
$8,799.270
|
$10,091.000
|
$20,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$26,063.000
|
$70,700.000
|
$18,980.640
|
$70,599.640
|
$60,000.000
|
$7,429.710
|
$48,562.750
|
$50,000.000
|
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$2,800.000
|
$745.000
|
$1,101.130
|
$1,517.110
|
$1,100.000
|
$998.620
|
$862.000
|
$2,500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,300.000
|
$725.000
|
$1,077.090
|
$1,501.990
|
$1,100.000
|
$1,010.070
|
$1,075.000
|
$2,500.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,759.000
|
$3,600.000
|
$3,608.930
|
$4,400.000
|
$2,900.000
|
$3,866.400
|
$3,910.000
|
$6,000.000
|
|
|
|
CAST-IN-PLACE TRENCH DRAIN
|
LF
|
84.000
|
$840.000
|
$234.000
|
$667.530
|
$191.700
|
$325.000
|
$235.380
|
$133.890
|
$235.000
|
|
|
|
REMOV STR (INLET)
|
EA
|
18.000
|
$750.000
|
$645.000
|
$688.120
|
$495.000
|
$650.000
|
$1,097.970
|
$783.000
|
$1,200.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
3,348.000
|
$24.000
|
$15.500
|
$20.730
|
$12.050
|
$22.000
|
$10.120
|
$13.650
|
$20.000
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
1,365.000
|
$40.000
|
$32.500
|
$37.760
|
$24.600
|
$100.000
|
$21.270
|
$39.080
|
$50.000
|
|
|
|
REMOV STR (ABUTMENT)
|
EA
|
1.000
|
$20,000.000
|
$3,660.000
|
$6,618.760
|
$2,512.360
|
$4,500.000
|
$4,459.140
|
$5,343.230
|
$20,000.000
|
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
1.000
|
$15,000.000
|
$3,020.000
|
$2,034.680
|
$1,018.300
|
$1,700.000
|
$3,805.010
|
$2,270.130
|
$25,000.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,373,994.000
|
$3,800,000.000
|
$3,656,793.000
|
$3,930,000.000
|
$4,381,826.330
|
$4,000,000.000
|
$4,680,007.000
|
$4,656,645.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$20,000.000
|
$14,810.000
|
$35,803.300
|
$13,077.210
|
$16,000.000
|
$27,040.550
|
$977.700
|
$25,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
150.000
|
$60.000
|
$55.000
|
$31.430
|
$59.770
|
$55.000
|
$33.620
|
$32.950
|
$45.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
150.000
|
$10.000
|
$10.000
|
$8.740
|
$10.870
|
$10.000
|
$17.350
|
$17.000
|
$10.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
163.000
|
$20.000
|
$19.300
|
$15.470
|
$20.920
|
$20.000
|
$14.230
|
$13.950
|
$35.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
163.000
|
$10.000
|
$10.000
|
$10.140
|
$10.870
|
$10.000
|
$8.150
|
$7.990
|
$12.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,611.000
|
$2.250
|
$1.550
|
$3.250
|
$1.680
|
$1.550
|
$1.200
|
$1.180
|
$3.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,611.000
|
$1.000
|
$0.500
|
$0.850
|
$0.540
|
$0.500
|
$0.510
|
$0.500
|
$1.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,564.000
|
$4.000
|
$2.950
|
$4.070
|
$3.210
|
$2.950
|
$2.030
|
$1.990
|
$5.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,564.000
|
$1.250
|
$0.750
|
$1.250
|
$0.820
|
$0.750
|
$0.510
|
$0.500
|
$1.000
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
781.000
|
$70.000
|
$94.000
|
$53.680
|
$76.090
|
$100.000
|
$80.000
|
$68.750
|
$70.000
|
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
4,410.000
|
$30.000
|
$5.950
|
$27.970
|
$29.530
|
$22.000
|
$50.000
|
$9.940
|
$75.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,120.000
|
$50.000
|
$9.500
|
$26.870
|
$38.850
|
$44.000
|
$45.000
|
$13.900
|
$75.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
100.000
|
$50.000
|
$9.500
|
$38.730
|
$32.680
|
$46.000
|
$45.000
|
$17.070
|
$75.000
|
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,910.000
|
$5.000
|
$7.550
|
$5.970
|
$5.420
|
$5.150
|
$5.890
|
$19.670
|
$10.000
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,120.000
|
$7.000
|
$9.800
|
$12.280
|
$3.590
|
$11.000
|
$5.760
|
$9.910
|
$10.000
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$10.000
|
$7.850
|
$34.390
|
$3.630
|
$27.000
|
$6.000
|
$12.970
|
$10.000
|
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
4,410.000
|
$10.000
|
$6.000
|
$7.290
|
$3.320
|
$4.500
|
$5.520
|
$8.000
|
$12.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,120.000
|
$10.000
|
$11.200
|
$9.570
|
$5.380
|
$9.000
|
$6.210
|
$8.000
|
$12.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
100.000
|
$11.000
|
$15.000
|
$32.070
|
$4.000
|
$9.000
|
$11.470
|
$11.100
|
$12.000
|
|
|
|
PERM CTB (F-SHAPE) (TY 3)
|
LF
|
233.000
|
$150.000
|
$117.000
|
$125.000
|
$173.250
|
$135.000
|
$232.430
|
$159.500
|
$90.000
|
|
|
|
PERM CTB (SSCB)(TY 1)(MOD)
|
LF
|
1,980.000
|
$200.000
|
$75.000
|
$250.000
|
$97.260
|
$66.000
|
$63.280
|
$50.000
|
$90.000
|
|
|
|
COLORED TEXTURED CONC (6"-17")
|
SY
|
2,680.000
|
$25.000
|
$52.000
|
$83.000
|
$93.470
|
$75.000
|
$83.840
|
$129.000
|
$125.000
|
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
386.000
|
$14.000
|
$2.500
|
$15.750
|
$4.490
|
$6.500
|
$15.910
|
$1.950
|
$3.000
|
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
6,291.000
|
$11.000
|
$2.000
|
$16.500
|
$4.620
|
$7.000
|
$16.670
|
$1.970
|
$1.810
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,158.000
|
$30.000
|
$23.300
|
$18.750
|
$23.450
|
$11.500
|
$18.940
|
$19.000
|
$20.000
|
|
|
|
CONC SIDEWALKS (4")
|
SY
|
2,337.000
|
$50.000
|
$41.250
|
$33.500
|
$45.800
|
$40.000
|
$37.350
|
$45.290
|
$50.000
|
|
|
|
CONC SIDEWALKS (6")
|
SY
|
209.000
|
$110.000
|
$129.000
|
$55.500
|
$140.890
|
$52.000
|
$59.570
|
$50.290
|
$140.000
|
|
|
|
CURB RAMPS (TY 1)
|
EA
|
12.000
|
$1,750.000
|
$1,330.000
|
$1,325.000
|
$1,430.640
|
$1,250.000
|
$1,338.380
|
$1,250.000
|
$1,500.000
|
|
|
|
CURB RAMPS (TY 20)
|
EA
|
4.000
|
$2,050.000
|
$1,050.000
|
$1,050.000
|
$1,502.900
|
$2,200.000
|
$1,060.610
|
$1,250.000
|
$1,500.000
|
|
|
|
CONC MEDIAN
|
SY
|
46.000
|
$84.500
|
$63.500
|
$63.500
|
$51.140
|
$42.000
|
$67.650
|
$50.000
|
$50.000
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
4,300.000
|
$28.000
|
$19.000
|
$20.000
|
$20.480
|
$19.550
|
$19.040
|
$19.000
|
$19.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
9.000
|
$1,400.000
|
$1,260.000
|
$1,450.000
|
$1,575.720
|
$1,500.000
|
$1,464.650
|
$1,258.000
|
$1,540.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,100.000
|
$925.000
|
$980.000
|
$738.960
|
$705.000
|
$686.870
|
$925.000
|
$680.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,554.000
|
$3.000
|
$3.400
|
$3.000
|
$3.100
|
$3.000
|
$2.880
|
$3.400
|
$2.850
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$200.000
|
$87.750
|
$150.000
|
$190.170
|
$180.000
|
$176.770
|
$87.710
|
$203.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,300.000
|
$2,200.000
|
$2,125.000
|
$2,146.240
|
$2,050.000
|
$1,994.950
|
$2,200.000
|
$2,300.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$260.000
|
$300.000
|
$300.000
|
$190.170
|
$182.000
|
$176.770
|
$300.000
|
$175.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
3.000
|
$11,000.000
|
$7,500.000
|
$7,285.000
|
$8,150.280
|
$16,500.000
|
$19,795.920
|
$7,500.000
|
$18,600.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$1,655.000
|
$950.000
|
$1,400.000
|
$1,032.370
|
$1,000.000
|
$3,826.530
|
$950.000
|
$2,500.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$1,200.000
|
$750.000
|
$1,304.050
|
$400.000
|
$1,530.610
|
$1,200.000
|
$1,000.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
4.000
|
$14,750.000
|
$13,500.000
|
$13,250.000
|
$14,670.510
|
$7,100.000
|
$8,163.270
|
$13,500.000
|
$9,450.000
|
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
717.000
|
$20.000
|
$18.800
|
$25.850
|
$20.460
|
$22.000
|
$26.680
|
$18.830
|
$25.000
|
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
863.000
|
$3.500
|
$3.450
|
$2.180
|
$3.750
|
$2.500
|
$2.000
|
$3.450
|
$2.000
|
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
55.000
|
$25.000
|
$59.750
|
$34.710
|
$232.210
|
$50.000
|
$22.270
|
$75.110
|
$32.000
|
|
|
|
PIPE UNDERDRAINS (TY 9) (6")
|
LF
|
257.000
|
$34.000
|
$89.250
|
$38.080
|
$102.390
|
$50.000
|
$49.680
|
$101.750
|
$110.000
|
|
|
|
PIPE UNDERDRAINS (TY 9)(4")
|
LF
|
130.000
|
$25.000
|
$60.250
|
$36.970
|
$61.600
|
$50.000
|
$16.960
|
$70.140
|
$55.000
|
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
1.000
|
$360.000
|
$605.000
|
$605.000
|
$665.640
|
$700.000
|
$612.010
|
$607.820
|
$1,265.000
|
|
|
|
IN RD IL (TY SP) 38S-4 (250W EQ) LED
|
EA
|
3.000
|
$4,000.000
|
$3,470.000
|
$3,466.000
|
$3,813.420
|
$2,875.000
|
$3,506.140
|
$3,482.170
|
$7,000.000
|
|
|
|
IN RD IL (TY SA) 40S-12 (250W EQ) LED
|
EA
|
5.000
|
$3,500.000
|
$3,450.000
|
$3,450.000
|
$3,795.820
|
$2,800.000
|
$3,489.950
|
$3,466.100
|
$6,800.000
|
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
20.000
|
$3,627.000
|
$2,940.000
|
$2,935.000
|
$3,229.200
|
$3,250.000
|
$2,968.990
|
$2,948.700
|
$9,000.000
|
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
1,009.000
|
$10.000
|
$14.100
|
$14.100
|
$15.510
|
$9.500
|
$14.260
|
$14.170
|
$9.000
|
|
|
|
CONDT (PVC) (SCH 40) (1 1/4")
|
LF
|
194.000
|
$13.210
|
$12.700
|
$12.700
|
$13.970
|
$15.300
|
$12.850
|
$12.760
|
$15.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
11,912.000
|
$8.850
|
$14.700
|
$14.660
|
$16.130
|
$11.050
|
$14.830
|
$14.730
|
$11.000
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
420.000
|
$20.000
|
$32.000
|
$32.050
|
$35.260
|
$23.250
|
$32.420
|
$32.200
|
$23.000
|
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
601.000
|
$11.000
|
$16.400
|
$16.350
|
$17.990
|
$13.000
|
$16.540
|
$16.430
|
$13.000
|
|
|
|
CONDT (RM) (3/4")
|
LF
|
906.000
|
$12.440
|
$20.900
|
$20.850
|
$22.940
|
$22.250
|
$21.090
|
$20.950
|
$22.000
|
|
|
|
CONDT (RM) (1 1/2")
|
LF
|
45.000
|
$11.420
|
$34.500
|
$34.550
|
$38.010
|
$21.510
|
$34.950
|
$34.710
|
$21.000
|
|
|
|
CONDT (RM) (2")
|
LF
|
367.000
|
$20.000
|
$60.750
|
$60.750
|
$66.840
|
$25.000
|
$61.450
|
$61.030
|
$25.000
|
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
1,044.000
|
$0.550
|
$1.600
|
$1.600
|
$1.760
|
$0.880
|
$1.620
|
$1.610
|
$1.000
|
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
2,088.000
|
$1.340
|
$1.600
|
$1.600
|
$1.760
|
$0.900
|
$1.620
|
$1.610
|
$1.000
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,312.000
|
$1.500
|
$1.600
|
$1.600
|
$1.760
|
$1.030
|
$1.620
|
$1.610
|
$1.000
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,624.000
|
$1.250
|
$1.750
|
$1.750
|
$1.930
|
$1.110
|
$1.770
|
$1.760
|
$1.000
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
9,976.000
|
$1.250
|
$1.750
|
$1.770
|
$1.950
|
$1.270
|
$1.790
|
$1.780
|
$1.000
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
29,922.000
|
$1.250
|
$1.900
|
$1.900
|
$2.090
|
$1.360
|
$1.920
|
$1.910
|
$1.000
|
|
|
|
ELEC CONDR (NO.1/0) BARE
|
LF
|
1,076.000
|
$4.800
|
$4.400
|
$4.400
|
$4.840
|
$3.400
|
$4.450
|
$4.420
|
$3.000
|
|
|
|
ELEC CONDR (NO.1/0) INSULATED
|
LF
|
2,152.000
|
$3.200
|
$4.800
|
$4.800
|
$5.280
|
$3.650
|
$4.860
|
$4.820
|
$3.000
|
|
|
|
GROUND BOX TY A (122311)
|
EA
|
31.000
|
$924.000
|
$995.000
|
$995.000
|
$1,094.740
|
$900.000
|
$1,006.520
|
$999.640
|
$900.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
24.000
|
$830.000
|
$1,710.000
|
$1,705.000
|
$1,875.900
|
$1,100.000
|
$1,724.750
|
$1,712.960
|
$1,100.000
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
|
EA
|
2.000
|
$6,200.000
|
$8,850.000
|
$8,845.000
|
$9,731.600
|
$5,650.000
|
$8,947.430
|
$8,886.280
|
$5,000.000
|
|
|
|
ELC SRV TY D 120/240 125(NS)SS(E)PS(U)
|
EA
|
1.000
|
$4,100.000
|
$19,210.000
|
$19,210.000
|
$21,135.560
|
$7,800.000
|
$19,432.460
|
$19,299.650
|
$7,900.000
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
146.000
|
$22.000
|
$32.750
|
$24.000
|
$35.980
|
$25.500
|
$33.080
|
$24.000
|
$25.250
|
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
887.000
|
$25.000
|
$28.000
|
$22.000
|
$30.810
|
$25.000
|
$28.320
|
$22.000
|
$25.000
|
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
581.000
|
$30.000
|
$37.750
|
$21.000
|
$41.530
|
$25.000
|
$38.190
|
$21.000
|
$22.500
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$500.000
|
$693.000
|
$465.000
|
$566.620
|
$370.000
|
$701.030
|
$465.000
|
$365.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$575.000
|
$830.000
|
$595.000
|
$704.150
|
$485.000
|
$839.610
|
$595.000
|
$475.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$696.260
|
$810.000
|
$525.000
|
$704.150
|
$445.000
|
$819.380
|
$525.000
|
$500.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$750.000
|
$956.000
|
$725.000
|
$863.690
|
$590.000
|
$967.070
|
$725.000
|
$585.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$800.000
|
$1,150.000
|
$850.000
|
$974.810
|
$685.000
|
$1,164.330
|
$850.000
|
$675.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
1.000
|
$620.000
|
$1,270.000
|
$835.000
|
$974.810
|
$660.000
|
$1,284.710
|
$835.000
|
$650.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
3.000
|
$1,490.000
|
$2,130.000
|
$1,400.000
|
$1,320.280
|
$960.000
|
$2,157.700
|
$1,400.000
|
$950.000
|
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
15.000
|
$4,335.000
|
$4,080.000
|
$2,850.000
|
$4,400.950
|
$2,275.000
|
$4,123.200
|
$2,850.000
|
$2,600.000
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
318.000
|
$6.000
|
$5.800
|
$5.250
|
$6.380
|
$8.000
|
$5.870
|
$5.250
|
$0.500
|
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
3.000
|
$26,000.000
|
$19,310.000
|
$19,995.000
|
$21,240.080
|
$19,100.000
|
$19,528.560
|
$19,995.000
|
$17,500.000
|
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$6,400.000
|
$5,180.000
|
$8,500.000
|
$5,699.230
|
$7,750.000
|
$5,239.990
|
$8,500.000
|
$7,500.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
3.000
|
$43.000
|
$75.000
|
$50.970
|
$55.390
|
$40.000
|
$76.530
|
$55.000
|
$40.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
85.000
|
$21.000
|
$24.000
|
$18.000
|
$19.870
|
$14.000
|
$24.490
|
$18.000
|
$15.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
56.000
|
$21.000
|
$23.000
|
$23.000
|
$10.870
|
$10.500
|
$23.470
|
$18.000
|
$10.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
41.000
|
$20.000
|
$24.000
|
$23.130
|
$19.890
|
$8.000
|
$24.490
|
$18.000
|
$15.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
21.000
|
$21.000
|
$23.000
|
$23.000
|
$10.870
|
$23.000
|
$23.470
|
$18.000
|
$10.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
2.000
|
$70.000
|
$65.000
|
$77.410
|
$84.120
|
$70.000
|
$66.330
|
$95.000
|
$50.000
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,778.000
|
$1.000
|
$2.000
|
$1.200
|
$2.170
|
$2.150
|
$2.040
|
$2.000
|
$2.000
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,922.000
|
$1.000
|
$2.000
|
$0.880
|
$2.170
|
$2.150
|
$2.040
|
$2.000
|
$2.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,606.000
|
$1.500
|
$2.000
|
$0.880
|
$2.170
|
$2.150
|
$2.040
|
$2.000
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,136.000
|
$1.250
|
$0.850
|
$0.950
|
$0.910
|
$0.900
|
$0.860
|
$0.840
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
5,657.000
|
$4.000
|
$2.800
|
$3.500
|
$3.040
|
$3.000
|
$2.860
|
$2.800
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
202.000
|
$6.500
|
$5.500
|
$6.900
|
$5.980
|
$5.950
|
$5.610
|
$5.500
|
$5.000
|
|
|
|
PAVEMENT SEALER 4"
|
LF
|
57,581.000
|
$0.370
|
$0.100
|
$0.200
|
$0.110
|
$0.110
|
$0.100
|
$0.100
|
$0.100
|
|
|
|
PAVEMENT SEALER 8"
|
LF
|
6,136.000
|
$0.560
|
$0.200
|
$0.300
|
$0.220
|
$0.220
|
$0.200
|
$0.200
|
$0.200
|
|
|
|
PAVEMENT SEALER 12"
|
LF
|
6,657.000
|
$1.300
|
$0.750
|
$0.650
|
$0.820
|
$0.810
|
$0.770
|
$0.750
|
$0.750
|
|
|
|
PAVEMENT SEALER 24"
|
LF
|
202.000
|
$2.130
|
$1.250
|
$1.300
|
$1.360
|
$1.200
|
$1.280
|
$1.250
|
$1.250
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
16,920.000
|
$0.500
|
$0.400
|
$0.450
|
$0.460
|
$0.450
|
$0.430
|
$0.420
|
$0.400
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
21,297.000
|
$0.340
|
$0.400
|
$0.380
|
$0.410
|
$0.410
|
$0.390
|
$0.380
|
$0.350
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
20,226.000
|
$0.500
|
$0.400
|
$0.380
|
$0.410
|
$0.410
|
$0.390
|
$0.380
|
$0.350
|
|
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
1,000.000
|
$3.100
|
$3.300
|
$3.000
|
$3.590
|
$3.550
|
$3.370
|
$3.300
|
$0.380
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
11.000
|
$238.000
|
$181.000
|
$281.000
|
$196.150
|
$195.000
|
$184.180
|
$180.500
|
$180.000
|
|
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$487.000
|
$375.000
|
$439.000
|
$408.060
|
$405.000
|
$383.170
|
$375.500
|
$375.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
9.000
|
$439.000
|
$219.000
|
$376.000
|
$237.440
|
$235.000
|
$222.960
|
$218.500
|
$200.000
|
|
|
|
PREFAB PAV MRK TY C (W)(BIKE ARROW)
|
EA
|
12.000
|
$80.000
|
$90.000
|
$198.000
|
$97.800
|
$97.000
|
$91.840
|
$90.000
|
$90.000
|
|
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
12.000
|
$208.000
|
$170.000
|
$236.000
|
$184.740
|
$185.000
|
$173.470
|
$170.000
|
$170.000
|
|
|
|
TRAFFIC BUTTON TY II-C-R
|
EA
|
214.000
|
$3.500
|
$4.000
|
$12.750
|
$4.350
|
$4.300
|
$4.080
|
$4.000
|
$4.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,986.000
|
$0.700
|
$0.600
|
$0.350
|
$0.650
|
$0.650
|
$0.610
|
$0.600
|
$0.600
|
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
57,581.000
|
$0.250
|
$0.050
|
$0.100
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
6,136.000
|
$0.300
|
$0.100
|
$0.150
|
$0.110
|
$0.110
|
$0.100
|
$0.100
|
$0.100
|
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
6,657.000
|
$2.000
|
$0.500
|
$0.500
|
$0.540
|
$0.550
|
$0.510
|
$0.500
|
$0.500
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
202.000
|
$3.000
|
$1.000
|
$1.000
|
$1.090
|
$1.100
|
$1.020
|
$1.000
|
$1.000
|
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
13.000
|
$20.000
|
$20.000
|
$20.000
|
$21.730
|
$21.500
|
$20.410
|
$20.000
|
$20.000
|
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
9.000
|
$30.000
|
$30.000
|
$23.000
|
$32.600
|
$32.250
|
$30.610
|
$30.000
|
$30.000
|
|
|
|
PAV SURF PREP FOR MRK (BIKE ARROW)
|
EA
|
12.000
|
$25.000
|
$15.000
|
$20.000
|
$16.300
|
$16.200
|
$15.310
|
$15.000
|
$15.000
|
|
|
|
PAV SURF PREP FOR MRK (BIKE SYMBOL)
|
EA
|
12.000
|
$25.000
|
$20.000
|
$20.000
|
$21.730
|
$21.500
|
$20.410
|
$20.000
|
$20.000
|
|
|
|
INSTALL OF FND FOR GROUND MNT CABINETS
|
EA
|
2.000
|
$1,900.000
|
$5,340.000
|
$5,335.000
|
$5,869.770
|
$1,500.000
|
$5,396.790
|
$5,359.900
|
$2,050.000
|
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
902.000
|
$0.700
|
$0.750
|
$1.000
|
$0.700
|
$1.080
|
$0.750
|
$1.500
|
$1.500
|
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
1,175.000
|
$5.000
|
$6.000
|
$35.980
|
$15.330
|
$5.000
|
$3.000
|
$5.000
|
$4.000
|
|
|
|
REPAIR (REACT)
|
EA
|
4.000
|
$3,000.000
|
$3,500.000
|
$5,000.000
|
$2,591.150
|
$1,750.000
|
$3,500.000
|
$2,000.000
|
$3,500.000
|
|
|
|
AESTHETIC FENCE
|
LF
|
657.800
|
$179.000
|
$478.000
|
$465.660
|
$507.720
|
$440.000
|
$475.160
|
$478.110
|
$400.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$8,750.000
|
$8,500.000
|
$21,842.770
|
$12,000.000
|
$17,320.000
|
$15,420.000
|
$6,000.000
|
|
|
|
INST LED AES RDWY ILL ASSEM (TY I)
|
EA
|
48.000
|
$1,500.000
|
$3,230.000
|
$3,231.000
|
$3,554.870
|
$3,450.000
|
$3,268.420
|
$3,246.080
|
$4,400.000
|
|
|
|
INST LED AES RDWY ILL ASSEM (TY II)
|
EA
|
15.000
|
$4,000.000
|
$6,960.000
|
$6,955.000
|
$7,652.150
|
$4,400.000
|
$7,035.540
|
$6,987.460
|
$6,000.000
|
|
|
|
INST LED AES RDWY ILL ASSEM (TY III)
|
EA
|
5.000
|
$4,000.000
|
$6,020.000
|
$6,022.000
|
$6,625.630
|
$4,600.000
|
$6,091.740
|
$6,050.100
|
$6,000.000
|
|
|
|
REMOVE & DISPOSE WASTEWATER MANHOLE
|
EA
|
3.000
|
$750.000
|
$830.000
|
$1,004.000
|
$913.200
|
$850.000
|
$1,152.860
|
$1,004.000
|
$3,000.000
|
|
|
|
ABANDON 6" WASTEWATER MAIN
|
LF
|
111.000
|
$3.000
|
$2.850
|
$8.000
|
$3.140
|
$2.950
|
$9.190
|
$8.000
|
$6.000
|
|
|
|
ABANDON 10" WASTEWATER MAIN
|
LF
|
591.000
|
$4.000
|
$3.450
|
$8.000
|
$3.800
|
$3.550
|
$9.190
|
$8.000
|
$12.000
|
|
|
|
ABANDON 12" WASTEWATER MAIN
|
LF
|
1,111.000
|
$5.000
|
$4.150
|
$8.000
|
$4.570
|
$4.250
|
$9.190
|
$8.000
|
$18.000
|
|
|
|
INSTL 24" PS 46 PVC WASTEWATER MAIN
|
LF
|
476.000
|
$225.000
|
$126.000
|
$90.000
|
$138.630
|
$130.000
|
$103.340
|
$90.000
|
$60.000
|
|
|
|
INSTL 36"(1/2"TH STL CAS)(SS)(JK&BORE)
|
LF
|
453.000
|
$700.000
|
$545.000
|
$632.000
|
$599.640
|
$560.000
|
$725.700
|
$632.000
|
$800.000
|
|
|
|
CONSTRUCT 6' WASTEWATER MANHOLE
|
EA
|
1.000
|
$6,000.000
|
$15,150.000
|
$13,628.000
|
$16,663.090
|
$15,500.000
|
$15,648.550
|
$13,628.000
|
$12,000.000
|
|
|
|
CONSTRUCT 6' WASTEWATER DROP MANHOLE
|
EA
|
1.000
|
$7,000.000
|
$18,390.000
|
$16,310.000
|
$20,233.360
|
$19,000.000
|
$18,728.190
|
$16,310.000
|
$12,000.000
|
|
|
|
TRENCH, EMBED & BACKFILL (WASTEWATER)
|
LF
|
476.000
|
$15.000
|
$2.000
|
$13.000
|
$2.200
|
$2.050
|
$14.930
|
$13.000
|
$100.000
|
|
|
|
TRENCH SAFETY (WASTEWATER)
|
LF
|
476.000
|
$2.000
|
$1.000
|
$5.000
|
$1.100
|
$1.030
|
$5.740
|
$5.000
|
$10.000
|
|
|
|
ABANDON 12" WATER MAIN
|
LF
|
3,107.000
|
$5.000
|
$4.150
|
$10.000
|
$4.570
|
$4.250
|
$11.480
|
$10.000
|
$18.000
|
|
|
|
REMOVE & SALVAGE 12" GATE VALVE
|
EA
|
5.000
|
$500.000
|
$490.000
|
$564.000
|
$539.120
|
$500.000
|
$647.620
|
$564.000
|
$600.000
|
|
|
|
INSTL 6" CL 235 C900 PVC WATER PIPE
|
LF
|
108.000
|
$40.000
|
$52.000
|
$36.000
|
$57.220
|
$53.250
|
$41.340
|
$36.000
|
$35.000
|
|
|
|
INSTL 8" CL 235 C900 PVC WATER PIPE
|
LF
|
1,265.000
|
$50.000
|
$63.000
|
$39.000
|
$69.330
|
$65.500
|
$44.780
|
$39.000
|
$45.000
|
|
|
|
INSTL 12" CL 235 C900 PVC WATER PIPE
|
LF
|
2,210.000
|
$60.000
|
$79.000
|
$60.000
|
$86.930
|
$81.000
|
$68.900
|
$60.000
|
$60.000
|
|
|
|
INSTL 24"(1/2"TH STL CAS)(WL)(JK&BORE)
|
LF
|
603.000
|
$550.000
|
$416.000
|
$431.000
|
$457.710
|
$425.000
|
$494.900
|
$431.000
|
$580.000
|
|
|
|
INSTL 24"(1/2"TH STL CAS)(WL)(OPN CUT)
|
LF
|
376.000
|
$400.000
|
$167.000
|
$150.000
|
$183.750
|
$171.000
|
$172.240
|
$150.000
|
$290.000
|
|
|
|
WRAPPED IRON FITTINGS
|
LB
|
9,184.000
|
$3.000
|
$2.300
|
$6.000
|
$2.530
|
$2.350
|
$6.890
|
$6.000
|
$1.000
|
|
|
|
CONNECT TO EXISTING WATER MAIN
|
EA
|
2.000
|
$1,500.000
|
$2,640.000
|
$8,630.000
|
$2,904.630
|
$2,700.000
|
$9,909.530
|
$8,630.000
|
$1,200.000
|
|
|
|
INSTALL 6" GATE VALVE
|
EA
|
12.000
|
$1,200.000
|
$980.000
|
$1,192.000
|
$1,078.230
|
$1,000.000
|
$1,368.730
|
$1,192.000
|
$900.000
|
|
|
|
INSTALL 8" GATE VALVE
|
EA
|
6.000
|
$1,700.000
|
$1,260.000
|
$1,789.000
|
$1,386.300
|
$1,285.000
|
$2,054.250
|
$1,789.000
|
$1,300.000
|
|
|
|
INSTALL 12" GATE VALVE
|
EA
|
15.000
|
$2,500.000
|
$2,120.000
|
$2,803.000
|
$2,327.000
|
$2,150.000
|
$3,218.590
|
$2,803.000
|
$1,700.000
|
|
|
|
INSTALL FIRE HYDRANT ASSEMBLY
|
EA
|
12.000
|
$4,000.000
|
$3,360.000
|
$4,290.000
|
$3,696.800
|
$3,425.000
|
$4,926.060
|
$4,290.000
|
$2,500.000
|
|
|
|
TRENCH, EMBED AND BACKFILL (WATER)
|
LF
|
3,583.000
|
$15.000
|
$1.200
|
$10.000
|
$1.320
|
$1.220
|
$11.480
|
$10.000
|
$55.000
|
|
|
|
TRENCH SAFETY (WATER)
|
LF
|
3,583.000
|
$2.000
|
$1.000
|
$4.000
|
$1.100
|
$1.020
|
$4.590
|
$4.000
|
$12.000
|
|
|
|
UTILITY MARKINGS (WATER)
|
EA
|
5.000
|
$500.000
|
$250.000
|
$408.000
|
$275.060
|
$260.000
|
$468.490
|
$408.000
|
$115.000
|
|
|
|
1" WATER METER & BOX
|
EA
|
1.000
|
$2,500.000
|
$1,870.000
|
$1,025.000
|
$2,057.450
|
$1,910.000
|
$1,176.970
|
$1,025.000
|
$230.000
|
|
|
|
1" COPPER WATER LINE
|
LF
|
38.000
|
$25.000
|
$30.000
|
$59.000
|
$49.320
|
$50.000
|
$67.750
|
$59.000
|
$45.000
|
|
|
|
1" SCH 40 FLEXIBLE PVC WATER LINE
|
LF
|
642.000
|
$8.000
|
$20.000
|
$45.000
|
$7.750
|
$32.000
|
$50.000
|
$10.000
|
$45.000
|
|
|
|
3" SCH 40 PVC CONDUIT
|
LF
|
528.000
|
$10.000
|
$15.000
|
$75.000
|
$19.590
|
$38.000
|
$90.000
|
$20.000
|
$45.000
|
|
|
|
3" SCH 40 PVC CONDUIT BY BORE
|
LF
|
115.000
|
$50.000
|
$35.000
|
$90.000
|
$48.910
|
$93.000
|
$210.000
|
$150.000
|
$45.000
|
|
|
|
WATER VALVE BOX FOR BRIDGE IRRIGATION
|
EA
|
2.000
|
$500.000
|
$2,500.000
|
$800.000
|
$416.130
|
$180.000
|
$1,500.000
|
$500.000
|
$230.000
|
|
1X
|
|
STR STEEL (MISC NON-BRIDGE) (CABLE)
|
LB
|
4,424.000
|
$12.000
|
$24.200
|
$22.790
|
$24.500
|
$20.000
|
$31.000
|
$12.000
|
$22.000
|
|
1X
|
|
INSTL SNDWH PNL CANOPY SYS (BRIDGE 1)
|
LS
|
1.000
|
$920,000.000
|
$1,280,300.000
|
$700,000.000
|
$1,280,303.790
|
$1,285,000.000
|
$750,000.000
|
$1,175,000.000
|
$750,000.000
|
|
2X
|
|
CONDT (RM) (3/4")
|
LF
|
1,811.000
|
$20.000
|
$49.250
|
$49.200
|
$49.810
|
$28.000
|
$49.770
|
$45.000
|
$35.000
|
|
2X
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
1,078.000
|
$1.500
|
$2.150
|
$2.150
|
$2.180
|
$0.820
|
$2.170
|
$2.000
|
$1.000
|
|
2X
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
1,750.000
|
$1.400
|
$2.150
|
$2.150
|
$2.180
|
$0.820
|
$2.170
|
$2.000
|
$1.000
|
|
2X
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
1,831.000
|
$3.600
|
$2.250
|
$2.250
|
$2.280
|
$0.880
|
$2.280
|
$2.000
|
$1.000
|
|
2X
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
3,290.000
|
$4.000
|
$2.250
|
$2.250
|
$2.280
|
$1.050
|
$2.280
|
$2.000
|
$1.000
|
|
2X
|
|
TRAY CABLE (3 CONDR) (10 AWG)
|
LF
|
332.000
|
$2.000
|
$11.200
|
$11.150
|
$11.290
|
$1.810
|
$11.280
|
$10.000
|
$1.500
|
|
2X
|
|
TRAY CABLE (3 CONDR) (8 AWG)
|
LF
|
219.000
|
$2.200
|
$24.100
|
$24.100
|
$24.400
|
$3.100
|
$24.380
|
$20.000
|
$3.000
|
|
2X
|
|
LED LIGHT ASSEMBLY (TY EA)
|
EA
|
16.000
|
$797.000
|
$2,850.000
|
$2,845.000
|
$2,880.430
|
$2,015.000
|
$2,877.950
|
$2,500.000
|
$3,000.000
|
|
2X
|
|
LED LIGHT ASSEMBLY (TY EA-1)
|
EA
|
16.000
|
$797.000
|
$2,850.000
|
$2,845.000
|
$2,880.430
|
$2,015.000
|
$2,877.950
|
$2,500.000
|
$3,000.000
|
|
2X
|
|
LED LIGHT ASSEMBLY (TY EB)
|
EA
|
32.000
|
$532.000
|
$2,570.000
|
$2,565.000
|
$2,596.940
|
$1,703.000
|
$2,594.700
|
$2,400.000
|
$2,700.000
|
|
2X
|
|
LED LIGHT ASSEMBLY (TY EC)
|
EA
|
54.000
|
$1,071.500
|
$3,000.000
|
$3,001.000
|
$3,038.370
|
$2,420.000
|
$3,035.750
|
$2,750.000
|
$3,400.000
|
|
2X
|
|
LED LIGHT ASSEMBLY (TY ED)
|
EA
|
40.000
|
$1,220.000
|
$3,750.000
|
$3,745.000
|
$3,791.640
|
$2,800.000
|
$3,788.370
|
$3,000.000
|
$3,900.000
|
|
3X
|
|
STR STEEL (MISC NON-BRIDGE) (CABLE)
|
LB
|
2,910.000
|
$12.000
|
$19.400
|
$23.760
|
$23.060
|
$19.100
|
$31.000
|
$10.000
|
$16.000
|
|
3X
|
|
INSTL SNDWH PNL CANOPY SYS (BRIDGE 2)
|
LS
|
1.000
|
$367,000.000
|
$535,700.000
|
$350,000.000
|
$535,696.200
|
$540,000.000
|
$300,000.000
|
$500,000.000
|
$500,000.000
|
|
3X
|
|
INSTL SNDWH PNL CANOPY SYS (BRIDGE 3)
|
LS
|
1.000
|
$430,000.000
|
$611,900.000
|
$350,000.000
|
$611,878.480
|
$615,000.000
|
$400,000.000
|
$575,000.000
|
$600,000.000
|
|
4X
|
|
CONDT (RM) (3/4")
|
LF
|
338.000
|
$20.000
|
$60.000
|
$60.100
|
$60.850
|
$25.000
|
$60.800
|
$50.000
|
$20.000
|
|
4X
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
671.000
|
$3.600
|
$2.250
|
$2.250
|
$2.280
|
$1.000
|
$2.280
|
$2.000
|
$1.000
|
|
4X
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
1,294.000
|
$4.000
|
$2.250
|
$2.250
|
$2.280
|
$1.030
|
$2.280
|
$2.000
|
$1.000
|
|
4X
|
|
TRAY CABLE (3 CONDR) (10 AWG)
|
LF
|
1,289.000
|
$2.000
|
$11.200
|
$11.150
|
$11.290
|
$2.200
|
$11.280
|
$10.000
|
$2.000
|
|
4X
|
|
TRAY CABLE (3 CONDR) (8 AWG)
|
LF
|
1,407.000
|
$2.200
|
$24.100
|
$24.100
|
$24.400
|
$2.300
|
$24.380
|
$20.000
|
$2.000
|
|
4X
|
|
LED LIGHT ASSEMBLY (TY ED)
|
EA
|
52.000
|
$1,220.000
|
$3,750.000
|
$3,753.000
|
$3,799.740
|
$2,800.000
|
$3,796.460
|
$3,000.000
|
$3,000.000
|
|
5X
|
|
BRIDGE LIGHTING DMX CONTROL SYSTEM
|
LS
|
1.000
|
$75,000.000
|
$188,500.000
|
$150,000.000
|
$190,847.420
|
$48,000.000
|
$190,682.950
|
$170,000.000
|
$90,000.000
|
|
Totals: |
$43,052,938.980
|
$39,547,700.000
|
$40,631,140.304
|
$41,222,298.684
|
$41,985,942.000
|
$43,241,578.151
|
$44,662,639.811
|
$49,013,363.860
|