Show Job Controls
Bid Cobra

DALLAS US 175 (0197-02-138)

Items: 91

County: DALLAS
Length: 2.4620 MILES
Highway: US 175
District: DALLAS
Control Number: 0197-02-138
DBE Goal: 0.0%
Project: F 2026(476)
Guaranty: $98,000.00
Time: 136 WORKING DAYS
Engineer's Estimate: $3,844,434.38
Date: 04/08/2026 (2 months ago)
Contract Number: 4263216
Type: CONSTRUCT RAMPS
Project ID: A00203532
Contract Type: Federal
Project Description: RAMP MODIFICATIONS, MILL AND INLAY EXISTING FRONTAGE ROADS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
NICHOLAS WADLINGTON
CODY JOLLEY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,844,434.38
$3,975,784.30
Over/Under Est: 3.42% $131,349.92
Over/Under Est: 4.54% $174,665.74
Amt Left: 1.09% $43,315.82
Over/Under Est: 9.62% $369,651.57
Amt Left: 5.99% $238,301.65
Delta: -4.85% -$194,985.83
Over/Under Est: 16% $615,260.26
Amt Left: 12.17% $483,910.34
Delta: -5.83% -$245,608.69

Bid Items & Bid Tabulations

91 Total 0 of 91
DALLAS  |  US 175  |  DALLAS  |  0197-02-138  |  04/08/2026  |  $3,844,434.38  |  F 2026(476)  |  CONSTRUCT RAMPS  |  136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
FOUTSCO PAVING COMPANY, LLC
TEXAS MATERIALS GROUP, INC.
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 130.000 $1,777.000 $540.000 $500.000 $1.000 $850.000
REMOV CONC (PAV)
SY 2,751.000 $15.000 $12.320 $24.000 $18.000 $21.000
RMV (0"-8") TRT/UNTRT BASE & ASPH PAV
SY 2,751.000 $15.000 $4.630 $7.000 $7.980 $7.350
RMV (8"-22") TRT/UNTRT BASE & ASPH PAV
SY 3,180.000 $24.000 $12.210 $18.000 $11.980 $8.400
EXCAV (ROADWAY)
CY 2,748.000 $20.000 $16.410 $23.000 $50.000 $21.000
SUBGR WIDEN (OC)
STA 19.880 $600.000 $187.250 $855.000 $300.000 $1,000.000
EMBANK (FNL)(DC)(TY C)
CY 773.000 $18.000 $4.740 $16.000 $100.000 $63.000
BACKFILL (TY A OR B)
STA 181.640 $250.000 $175.750 $175.000 $400.000 $300.000
ROAD GRADER WORK (ORD COMP)
STA 19.880 $175.000 $161.410 $100.000 $200.000 $1,000.000
COMPOST MANUF TOPSOIL (4")
SY 12,007.000 $3.000 $1.630 $2.000 $0.960 $1.500
BLOCK SODDING
SY 12,007.000 $7.000 $6.330 $4.000 $3.820 $5.250
DRILL SEED (TEMP_WARM_COOL)
SY 12,007.000 $0.400 $2.000 $0.100 $0.210 $0.180
VEGETATIVE WATERING
TGL 3,572.000 $5.000 $0.010 $0.100 $1.000 $1.000
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
SY 4,689.000 $27.000 $26.520 $50.000 $34.000 $50.000
PRIME COAT(MC-30 OR AE-P)
GAL 1,409.000 $6.000 $5.230 $0.100 $4.000 $5.500
SP MIXES SP-C SAC-B PG64-22
TON 6,874.000 $115.000 $180.350 $170.000 $155.000 $156.000
TACK COAT
GAL 5,868.000 $5.000 $4.200 $0.100 $4.000 $4.200
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 8,946.000 $90.000 $75.790 $80.000 $90.000 $80.000
PLANE ASPH CONC PAV(2")
SY 50,974.000 $3.000 $2.220 $0.750 $1.980 $2.000
CEM STABIL BKFL
CY 1.000 $250.000 $1,000.000 $1,000.000 $1,200.000 $850.000
TRENCH EXCAVATION PROTECTION
LF 428.000 $25.000 $1.000 $18.000 $1.000 $15.000
TEMPORARY SPL SHORING
SF 199.500 $28.000 $51.020 $55.000 $50.000 $150.000
DRILL SHAFT (24 IN)
LF 26.000 $200.000 $222.000 $285.000 $222.000 $236.500
DRILL SHAFT (36 IN)
LF 100.000 $225.000 $398.320 $250.000 $393.000 $525.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 48.000 $425.000 $230.000 $320.000 $230.000 $258.000
CLASS K CONCRETE (MISC)
CY 33.400 $2,000.000 $2,015.310 $975.000 $1,975.000 $2,500.000
RIPRAP (CONC)(CL B)
CY 3.000 $600.000 $918.370 $1,000.000 $1,000.000 $2,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 12.000 $600.000 $800.000 $855.000 $2,000.000 $1,000.000
CONC BOX CULV (3 FT X 2 FT)
LF 4.000 $300.000 $1,250.000 $1,200.000 $1,250.000 $900.000
CONC BOX CULV (4 FT X 2 FT)
LF 8.000 $350.000 $1,450.000 $1,450.000 $1,450.000 $950.000
RC PIPE (CL III)(30 IN)
LF 621.000 $150.000 $190.000 $198.000 $190.000 $125.000
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 2.000 $9,500.000 $6,300.000 $7,200.000 $6,300.000 $15,000.000
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $10,000.000 $7,500.000 $8,700.000 $7,500.000 $10,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $4,500.000 $5,900.000 $5,800.000 $5,900.000 $3,000.000
REMOV STR (INLET)
EA 2.000 $1,166.000 $1,000.000 $1,000.000 $2,000.000 $1,000.000
REMOV STR (HEADWALL)
EA 3.000 $1,830.000 $1,800.000 $1,500.000 $1,800.000 $1,000.000
REMOV STR (PIPE)
LF 527.000 $10.000 $10.000 $30.000 $10.000 $25.000
REMOV STR (BOX CULVERT)
LF 12.000 $97.000 $30.000 $300.000 $30.000 $400.000
MOBILIZATION
LS 1.000 $408,154.580 $437,336.270 $300,000.000 $420,000.000 $448,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $10,000.000 $34,213.170 $55,000.000 $40,000.000 $52,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $10,000.000 $1,032.460 $4,400.000 $18,500.000 $15,750.000
TMA (STATIONARY)
DAY 120.000 $125.000 $1.000 $1.000 $10.000 $157.500
TMA (MOBILE OPERATION)
DAY 5.000 $300.000 $1.500 $1.000 $100.000 $1,575.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 168.000 $55.000 $28.000 $40.000 $42.840 $69.880
ROCK FILTER DAMS (REMOVE)
LF 168.000 $12.000 $11.000 $5.000 $10.000 $37.630
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 246.000 $35.000 $35.000 $35.000 $42.000 $37.630
CONSTRUCTION EXITS (REMOVE)
SY 246.000 $15.000 $9.000 $10.000 $9.000 $18.810
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,368.000 $3.500 $3.500 $1.000 $3.600 $4.210
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,368.000 $1.000 $1.000 $0.500 $0.790 $1.880
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,857.000 $10.000 $6.250 $1.000 $5.610 $6.180
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,857.000 $3.000 $1.250 $0.500 $0.790 $2.960
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 1,216.000 $1.000 $1.000 $2.500 $0.250 $2.100
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $25.000 $30.000 $55.000 $50.000 $32.250
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,170.000 $1,300.000 $1,950.000 $2,500.000 $1,397.500
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,200.000 $3,000.000 $3,500.000 $3,000.000 $3,225.000
REMOVE RD IL ASM (TRANS-BASE)
EA 10.000 $800.000 $672.000 $785.000 $672.000 $913.750
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 6.000 $5,800.000 $4,065.000 $5,750.000 $4,065.000 $4,730.000
CONDT (PVC) (SCH 40) (2")
LF 1,818.000 $21.000 $15.250 $17.000 $15.250 $16.130
CONDT (PVC) (SCH 40) (2") (BORE)
LF 330.000 $35.000 $36.050 $48.000 $36.050 $35.480
ELEC CONDR (NO.8) BARE
LF 2,148.000 $3.000 $2.400 $2.000 $2.400 $2.150
ELEC CONDR (NO.8) INSULATED
LF 4,296.000 $4.000 $2.400 $2.500 $2.400 $2.690
GROUND BOX TY A (122311)W/APRON
EA 5.000 $2,000.000 $1,840.000 $2,000.000 $1,840.000 $1,505.000
REMOVE GROUND BOX
EA 2.000 $360.000 $435.000 $660.000 $435.000 $483.750
ALUMINUM SIGNS (TY G)
SF 204.000 $42.000 $32.750 $30.000 $32.750 $32.250
ALUMINUM SIGNS (TY O)
SF 242.500 $33.000 $37.150 $30.000 $37.150 $32.250
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 53.000 $705.000 $660.000 $600.000 $800.000 $645.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 50.000 $790.000 $720.000 $750.000 $958.000 $806.250
IN SM RD SN SUP&AM TY10BWG(2)SB(P-EXAL)
EA 3.000 $850.000 $1,500.000 $1,900.000 $2,473.000 $2,042.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $1,000.000 $890.000 $960.000 $1,160.000 $1,032.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $940.000 $1,200.000 $1,456.000 $1,290.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,030.000 $1,050.000 $1,500.000 $1,536.000 $1,612.500
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,700.000 $1,950.000 $2,695.000 $3,550.000 $2,902.500
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 3.000 $2,800.000 $3,118.000 $3,200.000 $3,118.000 $3,440.000
INSTALL LRSS (STRUCT STEEL)
LB 1,351.000 $7.000 $7.300 $10.000 $7.300 $10.750
REMOVE LRSA
EA 3.000 $880.000 $888.000 $1,150.000 $888.000 $1,236.250
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
EA 1.000 $29,000.000 $27,680.000 $20,000.000 $27,680.000 $40,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $55.000 $25.000 $60.000 $50.000 $26.880
INSTL OM ASSM (OM-2Z)(WFLX)GNDLL
EA 4.000 $75.000 $85.000 $170.000 $50.000 $75.250
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 348.000 $1.500 $2.500 $1.500 $8.150 $8.760
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 700.000 $1.000 $1.250 $1.300 $8.150 $8.760
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,198.000 $2.500 $1.300 $0.790 $1.500 $1.610
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 222.000 $4.000 $4.000 $3.050 $7.250 $7.790
PAVEMENT SLER 6"
LF 494.000 $1.000 $2.000 $0.180 $1.000 $1.080
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 4,522.000 $1.000 $0.700 $0.540 $1.000 $1.080
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 19,657.000 $1.500 $0.650 $0.530 $0.950 $1.020
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 17,929.000 $1.000 $0.650 $0.530 $0.950 $1.020
REFL PAV MRKR TY II-C-R
EA 294.000 $8.000 $6.000 $4.000 $6.250 $6.720
ELIM EXT PM & MRKS (6")
LF 298.000 $1.750 $0.580 $0.890 $5.000 $5.380
ELIM EXT PM & MRKS (8")
LF 376.000 $1.500 $1.150 $1.000 $6.000 $6.450
PAV SURF PREP FOR MRK (6")
LF 494.000 $1.750 $2.000 $0.250 $2.000 $2.150
FULL - WIDTH MOWING
CYC 2.000 $2,500.000 $5,000.000 $2,500.000 $6,000.000 $5,000.000
Totals: $3,844,434.380 $3,975,784.300 $4,019,100.120 $4,214,085.945 $4,459,694.635
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $49,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
Total: $74,000.00