REMOVING CONC (RIPRAP)
|
SY
|
100.000
|
$50.000
|
$38.000
|
$120.060
|
$100.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
300.000
|
$30.000
|
$21.000
|
$17.310
|
$20.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
8,750.000
|
$4.500
|
$2.750
|
$2.970
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
8,750.000
|
$4.500
|
$5.500
|
$6.460
|
$10.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,302.000
|
$25.000
|
$37.000
|
$25.000
|
$25.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
2,000.000
|
$110.000
|
$131.000
|
$112.080
|
$165.000
|
|
|
PLAN ASPH CONC PAV(0" TO 2.25")
|
SY
|
516,784.000
|
$3.000
|
$1.380
|
$3.200
|
$2.300
|
|
|
PLANE ASPH CONC PAV (0" TO 3/4")
|
SY
|
127,191.000
|
$2.750
|
$1.380
|
$2.250
|
$2.150
|
|
|
PLAN & TEXT CONC PAV (0" TO 2.5")
|
SY
|
1,652.000
|
$7.000
|
$5.500
|
$11.180
|
$10.000
|
|
|
FULL - DEPTH REPAIR CPCD (9")
|
SY
|
2,200.000
|
$250.000
|
$400.000
|
$280.000
|
$450.000
|
|
|
FULL - DEPTH REPAIR CPCD (11")
|
SY
|
2,600.000
|
$350.000
|
$455.000
|
$287.000
|
$500.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
600.000
|
$550.000
|
$825.000
|
$475.000
|
$900.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
444.000
|
$450.000
|
$250.000
|
$391.510
|
$350.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
132.000
|
$225.000
|
$150.000
|
$200.000
|
$250.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
255.000
|
$200.000
|
$165.000
|
$120.000
|
$200.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
967.000
|
$250.000
|
$285.000
|
$265.000
|
$300.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
3,224.000
|
$240.000
|
$215.000
|
$220.000
|
$250.000
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
6.000
|
$2,000.000
|
$3,900.000
|
$7,500.000
|
$8,500.000
|
|
|
CONC STR REPAIR (PAN GIRDER HOLE REPR)
|
EA
|
140.000
|
$80.000
|
$110.000
|
$250.000
|
$450.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
143.500
|
$800.000
|
$600.000
|
$1,125.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
10.000
|
$300.000
|
$270.000
|
$557.610
|
$185.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
531.000
|
$200.000
|
$171.000
|
$311.150
|
$202.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
815.000
|
$650.000
|
$650.000
|
$789.070
|
$550.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
7,345.000
|
$30.000
|
$5.850
|
$5.000
|
$100.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
3,581.000
|
$43.000
|
$30.000
|
$28.500
|
$100.000
|
|
|
CLEANING AND SEALING JOINTS (FOAM)
|
LF
|
3,179.000
|
$90.000
|
$68.000
|
$64.000
|
$100.000
|
|
|
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
|
LS
|
1.000
|
$910,350.000
|
$510,000.000
|
$480,100.000
|
$555,000.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
1,132.000
|
$200.000
|
$320.000
|
$244.800
|
$200.000
|
|
|
ADJUST STL SHOES
|
EA
|
46.000
|
$3,500.000
|
$5,250.000
|
$4,300.000
|
$5,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,855,510.010
|
$2,336,098.000
|
$3,061,835.590
|
$3,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$22,000.000
|
$58,000.000
|
$47,200.000
|
$8,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,425.000
|
$6.000
|
$4.150
|
$3.750
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,925.000
|
$2.000
|
$1.050
|
$0.800
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,500.000
|
$7.000
|
$6.250
|
$4.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,500.000
|
$3.500
|
$1.150
|
$1.000
|
$9.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
1,500.000
|
$11.000
|
$6.830
|
$10.000
|
$5.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,020.000
|
$75.000
|
$47.000
|
$30.750
|
$95.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,020.000
|
$20.000
|
$26.000
|
$40.540
|
$20.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,020.000
|
$20.000
|
$26.000
|
$16.490
|
$20.000
|
|
|
CONC CURB (TY I)
|
LF
|
300.000
|
$100.000
|
$16.000
|
$48.180
|
$55.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
151,385.000
|
$0.400
|
$0.140
|
$0.130
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
15,750.000
|
$25.000
|
$24.000
|
$22.500
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
37.000
|
$2,250.000
|
$2,200.000
|
$1,875.000
|
$1,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
36.000
|
$1,400.000
|
$1,300.000
|
$1,335.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
14,938.000
|
$3.500
|
$2.450
|
$2.250
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
36.000
|
$350.000
|
$215.000
|
$200.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
51.000
|
$3,200.000
|
$3,100.000
|
$2,875.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
51.000
|
$600.000
|
$265.000
|
$250.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,950.000
|
$2,650.000
|
$2,849.990
|
$6,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$15,000.000
|
$2,100.000
|
$3,107.630
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$25,000.000
|
$10,650.000
|
$8,502.490
|
$30,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
231.000
|
$35.000
|
$26.000
|
$25.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
52,575.000
|
$0.750
|
$0.351
|
$0.340
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
105,150.000
|
$0.500
|
$0.310
|
$0.300
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
105,150.000
|
$0.500
|
$0.310
|
$0.300
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
15,792.000
|
$2.000
|
$1.170
|
$2.000
|
$6.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
2,000.000
|
$4.500
|
$2.420
|
$2.250
|
$3.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
3,900.000
|
$4.500
|
$2.360
|
$2.200
|
$3.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
30.000
|
$60.000
|
$151.000
|
$140.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
30.000
|
$60.000
|
$161.000
|
$150.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
25.000
|
$450.000
|
$968.000
|
$900.000
|
$2,000.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
27.000
|
$450.000
|
$1,399.000
|
$1,300.000
|
$3,000.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
22,420.000
|
$0.600
|
$0.380
|
$0.350
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
54,801.000
|
$0.500
|
$0.650
|
$0.600
|
$1.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
109,602.000
|
$0.850
|
$0.610
|
$0.570
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
109,602.000
|
$0.850
|
$0.610
|
$0.570
|
$1.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
6,600.000
|
$4.000
|
$4.050
|
$3.750
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
22,420.000
|
$0.500
|
$0.670
|
$0.650
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
22,420.000
|
$0.500
|
$0.320
|
$0.300
|
$2.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
500.000
|
$90.000
|
$72.000
|
$152.000
|
$100.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
3,500.000
|
$4.000
|
$9.200
|
$71.000
|
$30.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
1.000
|
$3,000.000
|
$2,650.000
|
$1,000.000
|
$80,000.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
23.000
|
$200.000
|
$1,600.000
|
$980.000
|
$1,200.000
|
|
|
CONCRETE RAIL REPLACEMENT (TYPE 501)
|
LF
|
370.000
|
$500.000
|
$350.000
|
$700.000
|
$850.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
1,372.000
|
$35.000
|
$88.000
|
$115.000
|
$150.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
170.000
|
$110.000
|
$67.000
|
$65.000
|
$100.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
332.000
|
$900.000
|
$1,085.000
|
$1,000.000
|
$1,250.000
|
|
|
BRIDGE JOINT REPAIR (PARTIAL DEPTH)
|
LF
|
64.000
|
$2,050.000
|
$505.000
|
$220.000
|
$350.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
370.000
|
$450.000
|
$965.000
|
$1,075.000
|
$1,250.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
1.000
|
$40,000.000
|
$10,500.000
|
$7,750.000
|
$10,000.000
|
|
|
CONCRETE BEAM REP(STRAND SPLICE & CFRP)
|
EA
|
1.000
|
$40,000.000
|
$23,000.000
|
$17,000.000
|
$20,000.000
|
|
|
CONTINUOUS DIAMOND GRINDING CONC PVMT
|
SY
|
3,184.000
|
$25.000
|
$9.000
|
$8.780
|
$20.000
|
|
|
HIGH FRICTION SURFACE COURSE
|
SY
|
22,776.000
|
$25.000
|
$26.000
|
$20.060
|
$30.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
67,150.000
|
$175.000
|
$182.000
|
$206.640
|
$185.000
|
|
|
TACK COAT
|
GAL
|
41,345.000
|
$6.750
|
$4.350
|
$4.000
|
$5.000
|
|
|
TBWC (MEMBRANE)
|
GAL
|
27,982.000
|
$6.750
|
$3.850
|
$3.850
|
$5.000
|
|
|
TBWC PG76-22 SAC-A TY C
|
TON
|
5,509.000
|
$200.000
|
$210.000
|
$206.100
|
$200.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
26.000
|
$8,000.000
|
$7,850.000
|
$6,800.000
|
$8,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$25,000.000
|
$16,000.000
|
$18,943.750
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
812.000
|
$250.000
|
$285.000
|
$13.200
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$300.000
|
$204.000
|
$13.200
|
$550.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
LS
|
1.000
|
$100,000.000
|
$26,000.000
|
$38,900.030
|
$62,500.000
|
|
Totals: |
$28,702,764.660
|
$28,303,655.655
|
$30,618,355.950
|
$31,752,869.350
|