DALLAS IH 35E (0196-03-293)

Items: 89

County: DALLAS
Length: 23.5830 MILES
Highway: IH 35E
District: DALLAS
Control Number: 0196-03-293
DBE Goal: 0.0%
Project: C 196-3-293
Guaranty: $100,000.00
Time: 300 WORKING DAYS
Engineer's Estimate: $12,837,003.40
Date: 03/04/2025 (1 year ago)
Contract Number: 3253007
Type: INSTALL RDWY ILLUMINATION AND WWD SYSTEMS
Project ID: A00196688
Project Description: UPGRADE ROADWAY ILLUMINATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTOPHER BLAIN
ERIC HERMAN
ANTHONY BLOCK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$12,837,003.40
1
Awarded
$12,555,490.60
Over/Under Est: -2.19% -$281,512.80
Over/Under Est: -1.14% -$146,115.40
Amt Left: 1.08% $135,397.40
$18,084,330.57
Over/Under Est: 40.88% $5,247,327.17
Amt Left: 44.04% $5,528,839.97
Delta: -42.50% -$5,393,442.57
Subcontractor Percentage Amount
ALBATROSS CONSTRUCTION LLC 28.81% $3,617,236.84
E & E CONSTRUCTION CO. 1.70% $213,443.34
ODUM SERVICES, LLC 1.13% $141,877.04
AWP SAFETY 0.85% $106,721.67
Total: 32.49% $4,079,278.89

Bid Items & Bid Tabulations

89 Total 0 of 89
DALLAS  |  IH 35E  |  DALLAS  |  0196-03-293  |  03/04/2025  |  $12,837,003.40  |  C 196-3-293  |  INSTL RDWY ILLUM AND WWD SYS  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SICE, INC.
ELECNOR BELCO ELECTRIC, INC.
MICA CORPORATION
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 80.000 $22.500 $87.141 $22.000 $66.000
DRILL SHAFT (42 IN)
LF 19.000 $530.000 $719.552 $520.000 $750.000
DRILL SHAFT (HIGH MAST POLE) (48 IN)
LF 948.000 $825.000 $1,084.261 $560.000 $921.000
DRILL SHAFT (HIGH MAST POLE) (54 IN)
LF 100.000 $850.000 $1,206.809 $1,000.000 $980.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 172.000 $875.000 $1,097.086 $1,500.000 $965.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 456.000 $340.000 $412.472 $378.000 $300.000
RIPRAP (CONC)(4 IN)
CY 122.250 $600.000 $1,756.832 $648.000 $840.000
RIPRAP (CONC)(CL B)
CY 15.000 $550.000 $1,757.784 $544.000 $960.000
RIPRAP (MOW STRIP)(4 IN)
CY 113.000 $680.000 $1,756.654 $655.000 $855.000
MOBILIZATION
LS 1.000 $500,000.000 $946,504.746 $1,046,099.000 $1,562,200.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $35,000.000 $6,566.496 $6,000.000 $113,700.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 130.000 $190.000 $332.866 $300.000 $405.000
TMA (STATIONARY)
DAY 130.000 $525.000 $668.877 $425.000 $810.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,100.000 $10.000 $3.349 $12.000 $19.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,100.000 $2.000 $1.313 $7.000 $7.500
CONC SIDEWALKS (4")
SY 70.000 $275.000 $122.178 $97.000 $145.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,525.000 $25.000 $31.533 $31.000 $39.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 14.000 $1,400.000 $1,462.934 $1,571.000 $2,000.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $250.000 $276.606 $303.000 $625.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,200.000 $3,565.132 $3,480.000 $4,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 3.000 $1,100.000 $1,383.026 $1,813.000 $1,440.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $325.000 $399.541 $363.000 $700.000
REMOVE RD IL ASM (BRIDGE MOUNT)
EA 17.000 $425.000 $751.187 $1,500.000 $810.000
REMOVE RD IL ASM (SHOE-BASE)
EA 6.000 $1,000.000 $751.187 $1,500.000 $810.000
REMOVE RD IL ASM (CTB MOUNT)
EA 208.000 $800.000 $500.792 $1,500.000 $810.000
REMOVE RD IL ASM (TRANS-BASE)
EA 50.000 $1,000.000 $751.187 $1,500.000 $810.000
REMOVE RD IL ASM (U/P)
EA 125.000 $430.000 $791.214 $1,500.000 $1,220.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 317.000 $1,800.000 $2,050.952 $926.000 $2,250.000
IN RD IL (TY SA) 40B-4-4 (250W EQ) LED
EA 11.000 $5,000.000 $5,331.820 $6,800.000 $6,825.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 2.000 $5,000.000 $4,317.973 $6,120.000 $4,930.000
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
EA 8.000 $8,900.000 $5,970.073 $8,135.000 $8,076.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 36.000 $5,400.000 $4,649.055 $6,400.000 $5,225.000
HI MST IL POLE (100 FT)( 80 MPH)
EA 42.000 $45,000.000 $35,339.701 $34,000.000 $42,710.000
HI MST IL POLE (125 FT)( 80 MPH)
EA 4.000 $49,000.000 $43,057.162 $41,000.000 $48,850.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 5.000 $55,000.000 $48,767.012 $47,000.000 $54,950.000
LED HI MST IL ASM (6 FIXT) (TY S)
EA 6.000 $41,500.000 $34,825.572 $41,300.000 $40,660.000
LED HI MST IL ASM (6 FIXT) (TY A)
EA 42.000 $39,500.000 $34,754.318 $40,200.000 $40,915.000
LED HI MST IL ASM (6 FIXT) (TY C)
EA 3.000 $41,500.000 $34,607.622 $40,600.000 $40,445.000
REPLC LED HI MST IL(6 FIXT) (TY S)
EA 2.000 $8,000.000 $6,097.419 $75,600.000 $26,880.000
CONDT (PVC) (SCH 40) (2")
LF 44,590.000 $13.000 $18.052 $14.000 $28.700
CONDT (PVC) (SCH 40) (2") (BORE)
LF 11,430.000 $31.500 $19.728 $18.000 $46.650
CONDT (PVC) (SCH 80) (2")
LF 25.000 $11.500 $27.084 $15.000 $30.000
CONDT (PVC) (SCH 80) (3")
LF 8,565.000 $15.500 $20.820 $20.000 $29.550
CONDT (PVC) (SCH 80) (3") (BORE)
LF 6,886.000 $31.500 $18.989 $26.000 $40.000
CONDT (RM) (1")
LF 15,015.000 $30.500 $22.193 $36.000 $56.250
CONDT (RM) (2")
LF 1,145.000 $54.000 $33.579 $43.000 $65.050
CONDUIT (PREPARE)
LF 20,428.000 $3.000 $7.026 $9.000 $4.600
ITS MULTI-DUCT CND (RMC)
LF 435.000 $97.500 $277.563 $95.000 $205.000
ELEC CONDR (NO.12) BARE
LF 14,210.000 $1.400 $0.873 $1.700 $2.300
ELEC CONDR (NO.12) INSULATED
LF 29,790.000 $1.450 $1.187 $1.800 $2.350
ELEC CONDR (NO.8) BARE
LF 11,130.000 $1.850 $1.067 $2.400 $3.150
ELEC CONDR (NO.8) INSULATED
LF 40,332.000 $1.900 $1.262 $2.500 $3.260
ELEC CONDR (NO.6) BARE
LF 36,048.000 $2.050 $1.375 $1.500 $3.360
ELEC CONDR (NO.6) INSULATED
LF 79,476.000 $2.250 $1.653 $3.000 $3.640
ELEC CONDR (NO.4) BARE
LF 20,019.000 $3.900 $1.913 $3.000 $3.860
ELEC CONDR (NO.4) INSULATED
LF 40,698.000 $4.100 $2.181 $3.500 $4.220
ELEC CONDR (NO.2) BARE
LF 4,010.000 $4.750 $2.675 $4.600 $5.170
ELEC CONDR (NO.2) INSULATED
LF 8,020.000 $4.850 $3.052 $5.300 $5.670
ELEC CONDR (NO.1) BARE
LF 6,364.000 $4.950 $4.817 $6.000 $5.870
ELEC CONDR (NO.1) INSULATED
LF 12,548.000 $5.000 $4.603 $6.000 $6.050
GROUND BOX TY A (122311)
EA 51.000 $1,025.000 $907.856 $1,375.000 $1,743.000
GROUND BOX TY A (122311)W/APRON
EA 158.000 $1,300.000 $1,397.294 $1,232.000 $2,847.000
GROUND BOX TY D (162922)
EA 2.000 $1,325.000 $1,154.209 $1,632.000 $1,905.000
GROUND BOX TY D (162922)W/APRON
EA 23.000 $1,850.000 $1,722.339 $1,314.000 $3,120.000
REMOVE ELECTRICAL SERVICES
EA 13.000 $1,000.000 $1,723.588 $1,116.000 $912.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 17.000 $10,000.000 $5,282.025 $9,525.000 $13,500.000
ELC SRV TY D 120/240 060(NS)GS(N)EX(O)
EA 1.000 $8,100.000 $3,140.675 $7,855.000 $5,425.000
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 1.000 $9,800.000 $8,625.626 $8,943.000 $13,550.000
ELC SRV TY D 120/240 070(NS)GS(N)EX(O)
EA 1.000 $8,100.000 $1,931.809 $3,625.000 $5,425.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $750.000 $853.025 $1,813.000 $1,900.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 7.000 $725.000 $754.558 $1,571.000 $1,820.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $850.000 $716.906 $1,571.000 $1,625.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 7.000 $825.000 $527.812 $1,813.000 $1,585.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $400.000 $450.877 $605.000 $825.000
REMOVE SM RD SN SUP&AM
EA 23.000 $160.000 $121.392 $182.000 $920.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 15.000 $100.000 $121.392 $182.000 $350.000
REFL PAV MRKR TY II-C-R
EA 224.000 $7.500 $32.161 $68.000 $25.000
PAV SURF PREP FOR MRK (RPM)
EA 224.000 $5.000 $6.147 $4.000 $20.000
PED POLE ASSEMBLY
EA 27.000 $3,250.000 $2,556.002 $3,286.000 $5,650.000
INSTALL CIRCUIT BREAKER
EA 10.000 $500.000 $800.808 $300.000 $320.000
TREE REMOVAL (4" - 12" DIA)
EA 4.000 $950.000 $1,821.873 $5,000.000 $1,200.000
ITS POLE (50 FT) (90 MPH)
EA 1.000 $18,500.000 $22,069.481 $42,713.000 $23,200.000
GROUND BOX (PREPARE)
EA 60.000 $750.000 $261.585 $265.000 $990.000
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 27,242.000 $4.000 $1.937 $3.500 $6.850
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 26.000 $1,600.000 $1,200.695 $2,510.000 $1,570.000
WIRELESS WWD SYSTEM
EA 15.000 $55,000.000 $71,902.879 $51,000.000 $56,000.000
WWD LED SIGN
EA 30.000 $2,000.000 $2,256.009 $3,420.000 $4,040.000
WWD SOLAR POWER SYSTEM
EA 17.000 $10,000.000 $2,355.093 $1,602.000 $6,500.000
ETHERNET SWITCH (INSTALL ONLY)
EA 21.000 $750.000 $176.418 $4,472.000 $3,105.000
Totals: $12,837,003.400 $12,555,490.553 $12,690,888.000 $18,084,330.570
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $3,500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $5,000.00
PUBLIC UTILITY FORCE ACCT WORK (NON- PART) $51,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
PUBLIC UTILITY FORCE ACCT WORK (NON- PART) $3,000.00
MATERIAL FURNISHED BY THE STATE (NON-PART) $118,500.00
Total: $184,000.00