PREPARING ROW
|
STA
|
10.530
|
$2,400.000
|
$180,000.000
|
$2,900.000
|
$3,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
65.000
|
$15.000
|
$14.000
|
$25.000
|
$50.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
30.000
|
$153.000
|
$150.000
|
$115.000
|
$65.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
8,829.000
|
$5.000
|
$3.000
|
$7.000
|
$11.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
3,152.000
|
$20.000
|
$30.000
|
$28.000
|
$37.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,499.000
|
$1.000
|
$3.000
|
$10.500
|
$5.650
|
|
|
BLOCK SODDING
|
SY
|
1,499.000
|
$3.000
|
$6.000
|
$15.500
|
$3.880
|
|
|
VEGETATIVE WATERING
|
MG
|
223.000
|
$12.000
|
$100.000
|
$33.000
|
$131.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
68,535.000
|
$122.000
|
$115.000
|
$129.000
|
$152.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
2,529.000
|
$40.000
|
$100.000
|
$96.000
|
$112.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
521,300.000
|
$2.000
|
$3.000
|
$3.000
|
$4.000
|
|
|
PLANE ASPH CONC PAV (0" TO 5")
|
SY
|
24,590.670
|
$2.500
|
$3.000
|
$3.850
|
$11.600
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
6,401.000
|
$45.000
|
$10.000
|
$29.000
|
$21.190
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
1,176.000
|
$200.000
|
$100.000
|
$242.000
|
$238.000
|
|
|
FULL - DEPTH REPAIR CRCP (9")
|
SY
|
750.000
|
$220.000
|
$125.000
|
$260.000
|
$253.000
|
|
|
FULL - DEPTH REPAIR CRCP (11")
|
SY
|
9,000.000
|
$220.000
|
$110.000
|
$293.000
|
$288.350
|
|
|
FLOWABLE BACKFILL
|
CY
|
53.000
|
$131.000
|
$280.000
|
$320.000
|
$280.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
3,522.000
|
$252.000
|
$250.000
|
$125.000
|
$75.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
900.000
|
$300.000
|
$250.000
|
$237.000
|
$160.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
1,929.000
|
$194.000
|
$250.000
|
$245.000
|
$208.000
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
2.300
|
$2,750.000
|
$10,000.000
|
$8,100.000
|
$6,880.000
|
|
|
CONC STR REPR(REMOVE AND REPL PEDESTAL)
|
CY
|
2.000
|
$5,000.000
|
$12,250.000
|
$8,100.000
|
$10,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
116.000
|
$505.000
|
$380.000
|
$425.000
|
$430.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
87.000
|
$505.000
|
$450.000
|
$480.000
|
$450.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,237.000
|
$440.000
|
$400.000
|
$445.000
|
$415.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
8,100.000
|
$45.000
|
$40.000
|
$26.000
|
$17.270
|
|
|
ADJUST STL SHOES
|
EA
|
16.000
|
$300.000
|
$25,000.000
|
$6,300.000
|
$7,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,634,114.000
|
$1,860,000.000
|
$1,861,667.000
|
$2,400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$15,000.000
|
$3,500.000
|
$5,000.000
|
$100,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,000.000
|
$2.000
|
$3.000
|
$2.350
|
$4.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$0.500
|
$1.000
|
$0.700
|
$1.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,000.000
|
$4.000
|
$5.000
|
$6.400
|
$5.630
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$0.500
|
$1.000
|
$0.880
|
$1.350
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,020.000
|
$34.000
|
$64.000
|
$51.000
|
$40.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
390.000
|
$7.000
|
$3.000
|
$15.000
|
$32.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,020.000
|
$10.000
|
$7.500
|
$16.500
|
$15.000
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
30.000
|
$100.000
|
$200.000
|
$220.000
|
$390.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
18,846.000
|
$20.000
|
$22.000
|
$23.000
|
$17.500
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$2,500.000
|
$1,550.000
|
$800.000
|
$675.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
24.000
|
$1,200.000
|
$1,200.000
|
$1,200.000
|
$1,050.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
16.000
|
$760.000
|
$1,100.000
|
$1,100.000
|
$2,725.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
14.000
|
$1,600.000
|
$1,700.000
|
$2,000.000
|
$1,825.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
19,145.750
|
$2.500
|
$3.000
|
$1.900
|
$1.750
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
21.000
|
$230.000
|
$250.000
|
$108.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
26.000
|
$2,600.000
|
$2,800.000
|
$2,765.000
|
$2,550.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
21.000
|
$280.000
|
$300.000
|
$215.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,200.000
|
$1,500.000
|
$1,500.000
|
$1,375.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$900.000
|
$840.000
|
$775.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$9,500.000
|
$8,800.000
|
$8,075.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$520.000
|
$650.000
|
$918.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
422.000
|
$30.000
|
$26.000
|
$33.000
|
$30.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
76,970.000
|
$0.500
|
$0.350
|
$0.367
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
342.000
|
$1.500
|
$1.000
|
$1.047
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(LNDP)
|
LF
|
198.000
|
$1.000
|
$1.000
|
$1.047
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,060.000
|
$0.500
|
$0.500
|
$0.524
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
|
EA
|
18.000
|
$450.000
|
$250.000
|
$262.000
|
$250.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
|
EA
|
19.000
|
$450.000
|
$250.000
|
$262.000
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
330.000
|
$0.600
|
$5.000
|
$5.237
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
23,091.000
|
$1.000
|
$1.250
|
$1.021
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
198.000
|
$3.000
|
$3.500
|
$3.666
|
$3.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,060.000
|
$3.000
|
$3.500
|
$3.666
|
$3.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$130.000
|
$135.000
|
$144.000
|
$135.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
19.000
|
$315.000
|
$175.000
|
$183.291
|
$175.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
5.000
|
$160.000
|
$155.000
|
$162.344
|
$155.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
18.000
|
$800.000
|
$500.000
|
$523.689
|
$500.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
19.000
|
$800.000
|
$500.000
|
$523.689
|
$500.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
16,648.000
|
$0.100
|
$0.200
|
$0.209
|
$0.200
|
|
|
PAVEMENT SEALER 6"
|
LF
|
5,520.000
|
$0.200
|
$0.350
|
$0.367
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
72,949.000
|
$0.300
|
$0.480
|
$0.503
|
$0.480
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
77,003.000
|
$0.500
|
$0.700
|
$0.733
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
72,883.000
|
$0.300
|
$0.480
|
$0.503
|
$0.480
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
342.000
|
$3.000
|
$3.500
|
$3.666
|
$3.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,824.000
|
$4.000
|
$3.750
|
$3.928
|
$3.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,228.000
|
$0.500
|
$0.500
|
$0.524
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
4,210.000
|
$0.500
|
$0.650
|
$0.681
|
$0.650
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
11,228.000
|
$0.100
|
$0.100
|
$0.105
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,210.000
|
$0.100
|
$0.200
|
$0.209
|
$0.200
|
|
|
REPAIR (STEEL RAIL)
|
LF
|
80.000
|
$100.000
|
$250.000
|
$430.000
|
$240.770
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
183.000
|
$170.000
|
$715.000
|
$295.000
|
$715.000
|
|
|
CONCRETE RAIL REPAIR (MISC)
|
LF
|
5.000
|
$500.000
|
$650.000
|
$1,000.000
|
$650.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
1,200.000
|
$45.000
|
$35.000
|
$37.000
|
$42.740
|
|
|
CONCRETE BEAM REPAIR
|
EA
|
29.000
|
$1,110.000
|
$2,500.000
|
$3,150.000
|
$7,300.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
105,042.000
|
$2.500
|
$3.000
|
$2.430
|
$3.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,000.000
|
$18,000.000
|
$13,000.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
240.000
|
$200.000
|
$240.000
|
$300.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
124.000
|
$250.000
|
$125.000
|
$55.000
|
$685.000
|
|
Totals: |
$18,200,250.750
|
$19,661,568.870
|
$19,946,605.288
|
$24,079,026.954
|