Show Job Controls
Bid Cobra

DALLAS IH 35E (0196-03-277)

Items: 86

County: DALLAS
Length: N/A
Highway: IH 35E
District: DALLAS
Control Number: 0196-03-277
DBE Goal: N/A
Project: NH 2020(472)
Guaranty: N/A
Time: 249 WORKING DAYS
Engineer's Estimate: $18,200,250.75
Date: 01/09/2020 (6 years ago)
Contract Number: N/A
Type: MILL, FDR AND ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$18,200,250.75
Over/Under Est: 8.03% $1,461,318.12
Over/Under Est: 9.6% $1,746,354.46
Amt Left: 1.45% $285,036.34
Over/Under Est: 32.3% $5,878,776.20
Amt Left: 22.47% $4,417,458.08
Delta: -20.72% -$4,132,421.74

Bid Items & Bid Tabulations

86 Total 0 of 86
DALLAS  |  IH 35E  |  DALLAS  |  0196-03-277  |  01/09/2020  |  $18,200,250.75  |  NH 2020(472)  |  MILL, FDR AND ACP OVERLAY  |  249 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
TEXAS MATERIALS GROUP, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
PREPARING ROW
STA 10.530 $2,400.000 $180,000.000 $2,900.000 $3,000.000
REMOVING CONC (RIPRAP)
SY 65.000 $15.000 $14.000 $25.000 $50.000
REMOVING CONC (CTB)
LF 30.000 $153.000 $150.000 $115.000 $65.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 8,829.000 $5.000 $3.000 $7.000 $11.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 3,152.000 $20.000 $30.000 $28.000 $37.000
COMPOST MANUF TOPSOIL (4")
SY 1,499.000 $1.000 $3.000 $10.500 $5.650
BLOCK SODDING
SY 1,499.000 $3.000 $6.000 $15.500 $3.880
VEGETATIVE WATERING
MG 223.000 $12.000 $100.000 $33.000 $131.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 68,535.000 $122.000 $115.000 $129.000 $152.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 2,529.000 $40.000 $100.000 $96.000 $112.000
PLANE ASPH CONC PAV(0" TO 3")
SY 521,300.000 $2.000 $3.000 $3.000 $4.000
PLANE ASPH CONC PAV (0" TO 5")
SY 24,590.670 $2.500 $3.000 $3.850 $11.600
PAV JT UNDERSEAL (24")
LF 6,401.000 $45.000 $10.000 $29.000 $21.190
FULL - DEPTH REPAIR CRCP (8")
SY 1,176.000 $200.000 $100.000 $242.000 $238.000
FULL - DEPTH REPAIR CRCP (9")
SY 750.000 $220.000 $125.000 $260.000 $253.000
FULL - DEPTH REPAIR CRCP (11")
SY 9,000.000 $220.000 $110.000 $293.000 $288.350
FLOWABLE BACKFILL
CY 53.000 $131.000 $280.000 $320.000 $280.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 3,522.000 $252.000 $250.000 $125.000 $75.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 900.000 $300.000 $250.000 $237.000 $160.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,929.000 $194.000 $250.000 $245.000 $208.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 2.300 $2,750.000 $10,000.000 $8,100.000 $6,880.000
CONC STR REPR(REMOVE AND REPL PEDESTAL)
CY 2.000 $5,000.000 $12,250.000 $8,100.000 $10,000.000
RIPRAP (CONC)(4 IN)
CY 116.000 $505.000 $380.000 $425.000 $430.000
RIPRAP (CONC)(FLUME)
CY 87.000 $505.000 $450.000 $480.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,237.000 $440.000 $400.000 $445.000 $415.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 8,100.000 $45.000 $40.000 $26.000 $17.270
ADJUST STL SHOES
EA 16.000 $300.000 $25,000.000 $6,300.000 $7,000.000
MOBILIZATION
LS 1.000 $1,634,114.000 $1,860,000.000 $1,861,667.000 $2,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $15,000.000 $3,500.000 $5,000.000 $100,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,000.000 $2.000 $3.000 $2.350 $4.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,000.000 $0.500 $1.000 $0.700 $1.550
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,000.000 $4.000 $5.000 $6.400 $5.630
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,000.000 $0.500 $1.000 $0.880 $1.350
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,020.000 $34.000 $64.000 $51.000 $40.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 390.000 $7.000 $3.000 $15.000 $32.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,020.000 $10.000 $7.500 $16.500 $15.000
PERM CTB (F-SHAPE) (TY 1)
LF 30.000 $100.000 $200.000 $220.000 $390.000
MTL W-BEAM GD FEN (TIM POST)
LF 18,846.000 $20.000 $22.000 $23.000 $17.500
TERMINAL ANCHOR SECTION
EA 1.000 $2,500.000 $1,550.000 $800.000 $675.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 24.000 $1,200.000 $1,200.000 $1,200.000 $1,050.000
MTL BM GD FEN TRANS (NON - SYM)
EA 16.000 $760.000 $1,100.000 $1,100.000 $2,725.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 14.000 $1,600.000 $1,700.000 $2,000.000 $1,825.000
REMOVE METAL BEAM GUARD FENCE
LF 19,145.750 $2.500 $3.000 $1.900 $1.750
REMOVE TERMINAL ANCHOR SECTION
EA 21.000 $230.000 $250.000 $108.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 26.000 $2,600.000 $2,800.000 $2,765.000 $2,550.000
GUARDRAIL END TREATMENT (REMOVE)
EA 21.000 $280.000 $300.000 $215.000 $200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,200.000 $1,500.000 $1,500.000 $1,375.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $900.000 $840.000 $775.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $9,500.000 $8,800.000 $8,075.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $520.000 $650.000 $918.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 422.000 $30.000 $26.000 $33.000 $30.500
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 76,970.000 $0.500 $0.350 $0.367 $0.350
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 342.000 $1.500 $1.000 $1.047 $1.000
WK ZN PAV MRK NON-REMOV (W)4"(LNDP)
LF 198.000 $1.000 $1.000 $1.047 $0.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,060.000 $0.500 $0.500 $0.524 $0.500
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
EA 18.000 $450.000 $250.000 $262.000 $250.000
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
EA 19.000 $450.000 $250.000 $262.000 $250.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 330.000 $0.600 $5.000 $5.237 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 23,091.000 $1.000 $1.250 $1.021 $1.000
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 198.000 $3.000 $3.500 $3.666 $3.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,060.000 $3.000 $3.500 $3.666 $3.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $130.000 $135.000 $144.000 $135.000
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 19.000 $315.000 $175.000 $183.291 $175.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $160.000 $155.000 $162.344 $155.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 18.000 $800.000 $500.000 $523.689 $500.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 19.000 $800.000 $500.000 $523.689 $500.000
PAVEMENT SEALER 4"
LF 16,648.000 $0.100 $0.200 $0.209 $0.200
PAVEMENT SEALER 6"
LF 5,520.000 $0.200 $0.350 $0.367 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 72,949.000 $0.300 $0.480 $0.503 $0.480
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 77,003.000 $0.500 $0.700 $0.733 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 72,883.000 $0.300 $0.480 $0.503 $0.480
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 342.000 $3.000 $3.500 $3.666 $3.500
REFL PAV MRKR TY II-C-R
EA 2,824.000 $4.000 $3.750 $3.928 $3.750
ELIM EXT PAV MRK & MRKS (4")
LF 11,228.000 $0.500 $0.500 $0.524 $0.500
ELIM EXT PAV MRK & MRKS (6")
LF 4,210.000 $0.500 $0.650 $0.681 $0.650
PAV SURF PREP FOR MRK (4")
LF 11,228.000 $0.100 $0.100 $0.105 $0.100
PAV SURF PREP FOR MRK (6")
LF 4,210.000 $0.100 $0.200 $0.209 $0.200
REPAIR (STEEL RAIL)
LF 80.000 $100.000 $250.000 $430.000 $240.770
CONCRETE RAIL REPAIR (IN-KIND)
LF 183.000 $170.000 $715.000 $295.000 $715.000
CONCRETE RAIL REPAIR (MISC)
LF 5.000 $500.000 $650.000 $1,000.000 $650.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 1,200.000 $45.000 $35.000 $37.000 $42.740
CONCRETE BEAM REPAIR
EA 29.000 $1,110.000 $2,500.000 $3,150.000 $7,300.000
MEMBRANE UNDERSEAL
GAL 105,042.000 $2.500 $3.000 $2.430 $3.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $18,000.000 $13,000.000 $16,500.000
TMA (STATIONARY)
DAY 240.000 $200.000 $240.000 $300.000 $350.000
TMA (MOBILE OPERATION)
DAY 124.000 $250.000 $125.000 $55.000 $685.000
Totals: $18,200,250.750 $19,661,568.870 $19,946,605.288 $24,079,026.954