DALLAS IH 20 (0095-13-043)

Items: 70

County: DALLAS
Length: N/A
Highway: IH 20
District: DALLAS
Control Number: 0095-13-043
DBE Goal: N/A
Project: NH 2019(668)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $29,314,198.80
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: MILL EB, FDCR, & OVERLAY EB & WB
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$29,314,198.80
$25,641,956.19
Over/Under Est: -12.53% -$3,672,242.61
Over/Under Est: 11.72% $3,435,972.13
Amt Left: 27.72% $7,108,214.74
Over/Under Est: 20.11% $5,895,459.46
Amt Left: 37.31% $9,567,702.07
Delta: -7.51% -$2,459,487.33
$36,129,708.70
Over/Under Est: 23.25% $6,815,509.90
Amt Left: 40.9% $10,487,752.51
Delta: -2.61% -$920,050.44

Bid Items & Bid Tabulations

70 Total 0 of 70
DALLAS  |  IH 20  |  DALLAS  |  0095-13-043  |  03/05/2019  |  $29,314,198.80  |  NH 2019(668)  |  MILL EB, FDCR, & OVERLAY EB & WB  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
TEXAS MATERIALS GROUP, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
J.D. ABRAMS, L.P.
REMOVING CONCRETE(MOW STRIP)
LF 19,375.000 $3.000 $7.150 $8.000 $7.000 $4.250
BACKFILL (TY A OR B)
STA 1,795.890 $150.000 $140.000 $275.000 $225.000 $345.000
BLADING
STA 1,795.890 $90.000 $0.100 $68.000 $75.000 $25.000
COMPOST MANUF TOPSOIL (4")
SY 199,555.000 $1.000 $0.010 $1.050 $2.000 $0.820
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 131,222.000 $0.120 $0.110 $0.120 $0.120 $0.240
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 68,333.000 $0.120 $0.110 $0.120 $0.120 $0.210
VEGETATIVE WATERING
MG 17,126.000 $12.000 $0.100 $0.010 $24.000 $8.500
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 104,826.400 $100.000 $89.000 $118.000 $102.000 $130.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,000.000 $30.000 $119.000 $95.000 $42.000 $104.000
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 237,981.000 $3.000 $1.540 $2.000 $2.000 $1.250
PLAN & TEXT ASPH CONC PAV(4" TO 6")
SY 192,034.000 $7.000 $1.030 $1.220 $3.000 $2.000
PLAN & TEXT CONC PAV(0" TO 2")
SY 51,843.000 $2.500 $5.150 $4.000 $2.850 $2.250
FULL - DEPTH REPAIR CPCD (12")
SY 12,800.000 $160.000 $154.840 $174.000 $314.500 $154.000
FULL - DEPTH REPAIR CPCD (13")
SY 7,600.000 $180.000 $166.490 $187.000 $339.500 $167.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,145.000 $430.000 $525.000 $520.000 $412.000 $450.000
MOBILIZATION
LS 1.000 $2,500,000.000 $2,435,000.000 $3,072,785.000 $3,500,000.000 $3,490,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $15,000.000 $23,000.000 $23,000.000 $5,000.000 $96,750.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $20.000 $27.430 $29.000 $28.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $7.000 $8.970 $9.250 $9.000 $6.250
TEMP SEDMT CONT FENCE (INSTALL)
LF 30,460.000 $2.500 $1.620 $1.750 $1.750 $2.150
TEMP SEDMT CONT FENCE (REMOVE)
LF 30,460.000 $0.500 $0.320 $0.350 $0.400 $0.440
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,751.000 $4.000 $3.170 $3.250 $4.000 $3.450
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,751.000 $1.000 $0.480 $0.550 $0.500 $0.440
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 285,340.000 $0.120 $0.130 $0.130 $0.140 $0.240
MTL W-BEAM GD FEN (TIM POST)
LF 20,612.500 $20.000 $17.100 $18.000 $19.000 $19.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 62.000 $1,725.000 $1,325.000 $1,394.737 $1,400.000 $1,470.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 38.000 $1,250.000 $925.000 $973.684 $995.000 $1,040.000
REMOVE METAL BEAM GUARD FENCE
LF 18,750.000 $2.750 $1.450 $1.526 $1.750 $1.800
REMOVE TERMINAL ANCHOR SECTION
EA 64.000 $260.000 $100.000 $105.263 $150.000 $158.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $260.000 $100.000 $105.263 $170.000 $176.000
GUARDRAIL END TREATMENT (INSTALL)
EA 88.000 $2,500.000 $2,475.000 $2,605.263 $2,400.000 $2,520.000
GUARDRAIL END TREATMENT (REMOVE)
EA 84.000 $240.000 $225.000 $236.842 $200.000 $210.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $600.000 $425.000 $894.737 $490.000 $615.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,000.000 $1,700.000 $2,342.105 $2,100.000 $2,050.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 6.000 $2,000.000 $1,700.000 $2,526.316 $2,000.000 $2,260.000
REMOVE SM RD SN SUP&AM
EA 8.000 $80.000 $75.000 $105.263 $75.000 $105.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 8.000 $500.000 $400.000 $684.211 $500.000 $525.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 227.000 $70.000 $55.000 $63.158 $55.000 $48.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 70.000 $25.000 $20.000 $24.211 $20.000 $16.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 79.000 $70.000 $55.000 $63.158 $55.000 $51.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 70.000 $19.000 $20.000 $24.211 $20.000 $16.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 251.000 $70.000 $55.000 $63.158 $58.000 $47.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 212.000 $27.000 $25.000 $27.368 $22.000 $23.100
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 185.000 $23.000 $25.000 $27.368 $22.000 $23.100
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 1,704.000 $0.480 $0.550 $0.310 $0.350 $0.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 65,047.000 $0.290 $0.310 $0.310 $0.350 $0.500
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 65,047.000 $0.310 $0.310 $0.310 $0.350 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 11,257.000 $0.730 $0.840 $1.000 $1.150 $1.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 20,462.000 $1.100 $1.000 $0.870 $1.000 $0.950
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,512.000 $3.000 $3.000 $3.400 $3.250 $3.450
PAVEMENT SEALER 4"
LF 21,000.000 $0.150 $0.180 $0.210 $0.210 $0.220
PAVEMENT SEALER 6"
LF 5,280.000 $0.200 $0.250 $0.310 $0.350 $0.330
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 164,660.000 $0.320 $0.380 $0.470 $0.460 $0.490
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 58,030.000 $0.480 $0.550 $0.580 $0.600 $0.590
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 162,480.000 $0.320 $0.380 $0.480 $0.460 $0.490
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 2,292.000 $2.860 $2.750 $3.400 $3.250 $3.500
REFL PAV MRKR TY II-C-R
EA 6,519.000 $3.000 $3.250 $3.750 $3.550 $3.750
ELIM EXT PAV MRK & MRKS (4")
LF 26,280.000 $0.400 $0.450 $0.510 $0.500 $0.520
PAV SURF PREP FOR MRK (4")
LF 21,000.000 $0.100 $0.050 $0.085 $0.100 $0.090
PAV SURF PREP FOR MRK (6")
LF 5,280.000 $0.100 $0.050 $0.210 $0.250 $0.220
LITTER REMOVAL
CYC 6.000 $2,500.000 $1,900.000 $1,200.000 $1,200.000 $16,700.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 50.000 $2,300.000 $855.000 $4,000.000 $1,195.000 $9,600.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 10.000 $2,000.000 $1,800.000 $3,000.000 $1,775.000 $9,600.000
NO. OF WORKING DAYS
$/D 4,000.000 $310.000 $300.000 $310.000 $310.000 $300.000
CAM (ASPHALT) PG(76-22)
TON 3,868.800 $110.000 $97.750 $138.000 $140.500 $151.000
CAM (AGGREGATE)
TON 48,360.060 $110.000 $97.750 $138.000 $140.500 $151.000
MEMBRANE UNDERSEAL
GAL 166,302.780 $2.500 $2.600 $3.000 $6.000 $3.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $11,000.000 $17,750.000 $13,000.000 $13,250.000 $6,000.000
TMA (STATIONARY)
EA 6.000 $14,000.000 $31,000.000 $22,000.000 $10,000.000 $0.010
TMA (MOBILE OPERATION)
HR 144.000 $65.000 $110.000 $28.000 $50.000 $75.000
Totals: $29,314,198.800 $25,641,956.212 $32,750,171.002 $35,209,658.260 $36,129,708.700