Show Job Controls
Bid Cobra

DALLAS IH 45 (0092-14-104)

Items: 29

County: DALLAS
Length: N/A
Highway: IH 45
District: DALLAS
Control Number: 0092-14-104
DBE Goal: N/A
Project: F 2B23(095)
Guaranty: N/A
Time: 102 WORKING DAYS
Engineer's Estimate: $3,138,190.88
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,138,190.88
$3,534,464.30
Over/Under Est: 12.63% $396,273.42
$3,702,811.00
Over/Under Est: 17.99% $564,620.12
Amt Left: 4.76% $168,346.70
$4,092,193.00
Over/Under Est: 30.4% $954,002.12
Amt Left: 15.78% $557,728.70
Delta: -10.52% -$389,382.00
Over/Under Est: 39.47% $1,238,520.82
Amt Left: 23.83% $842,247.40
Delta: -6.95% -$284,518.70
Subcontractor Percentage Amount
WYLIE DRILLING & DRAINAGE, INC. 3.67% $132,983.78
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 2.57% $93,124.88
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.75% $63,411.88
TEXAS SWPPP SERVICES 1.22% $44,207.14
BRENDA PRICE TRUCKING 1.06% $38,409.48
XROADS, L.P. 0.46% $16,668.27
Total: 10.73% $388,805.43

Bid Items & Bid Tabulations

29 Total 0 of 29
DALLAS  |  IH 45  |  DALLAS  |  0092-14-104  |  08/03/2023  |  $3,138,190.88  |  F 2B23(095)  |  HAZARD ELIM & SAFETY  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ED BELL CONSTRUCTION COMPANY
WEBBER, LLC
FNH CONSTRUCTION, LLC
RAGLE CONSTRUCTION, INC.
BACKFILL (TY A OR B)
STA 171.000 $200.000 $300.000 $646.150 $450.000 $519.000
COMPOST MANUF TOPSOIL (4")
SY 9,463.000 $2.000 $4.500 $2.950 $10.000 $3.500
BLOCK SODDING
SY 9,463.000 $4.500 $6.000 $4.550 $10.000 $8.900
VEGETATIVE WATERING
MG 1,408.000 $6.000 $10.000 $30.000 $20.000 $66.000
RIPRAP (CONC)(5 IN)
CY 796.000 $550.000 $552.000 $613.150 $550.000 $500.000
MOBILIZATION
LS 1.000 $260,744.630 $355,000.000 $370,000.000 $400,000.000 $430,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $45,000.000 $31,500.000 $61,666.650 $8,500.000 $50,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 132.000 $60.000 $69.110 $60.700 $30.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 132.000 $15.000 $34.560 $11.150 $15.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 770.000 $30.000 $25.520 $28.850 $40.000 $28.500
CONSTRUCTION EXITS (REMOVE)
SY 770.000 $10.000 $12.760 $10.150 $20.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 705.000 $5.100 $3.990 $4.600 $18.000 $4.550
BIODEG EROSN CONT LOGS (REMOVE)
LF 705.000 $1.250 $1.590 $0.950 $9.000 $0.900
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 5,280.000 $33.000 $25.000 $60.000 $85.000 $50.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 15,030.000 $6.500 $10.000 $8.850 $20.000 $10.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 5,280.000 $12.000 $10.000 $10.000 $20.000 $11.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 17,187.000 $85.000 $99.000 $73.000 $100.000 $110.000
REMOVE METAL BEAM GUARD FENCE
LF 2,289.000 $3.000 $3.190 $3.800 $3.000 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 9.000 $210.000 $287.090 $252.550 $500.000 $270.000
REMOVE CABLE BARRIER
LF 16,957.000 $5.000 $3.720 $11.000 $3.000 $16.750
REMOVE CABLE BARRIER TERMINAL SECTION
EA 18.000 $450.000 $366.840 $1,600.050 $500.000 $345.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $280.000 $457.220 $252.950 $2,000.000 $430.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000 $1,500.000 $3,150.000 $1,160.000 $6,500.000 $400.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,100.000 $945.000 $774.000 $2,000.000 $700.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,000.000 $11,550.000 $7,049.000 $21,000.000 $13,500.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 345.000 $20.000 $75.000 $20.100 $100.000 $23.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,000.000 $13,025.000 $1,650.000 $30,000.000
TMA (STATIONARY)
DAY 204.000 $250.000 $175.000 $427.000 $250.000 $320.000
TMA (MOBILE OPERATION)
DAY 102.000 $130.000 $840.000 $779.000 $55.000 $745.000
Totals: $3,138,190.880 $3,534,464.300 $3,702,811.000 $4,092,193.000 $4,376,711.700