COMPOST MANUF TOPSOIL (4")
|
SY
|
5,798.000
|
$1.000
|
$1.470
|
|
|
BLOCK SODDING
|
SY
|
5,798.000
|
$4.000
|
$4.610
|
|
|
VEGETATIVE WATERING
|
MG
|
245.000
|
$15.000
|
$36.810
|
|
|
CL C CONC (MISC)
|
CY
|
2.700
|
$700.000
|
$15,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
41,448.000
|
$30.000
|
$63.800
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
361.000
|
$80.000
|
$30.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
500.000
|
$200.000
|
$53.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
771.000
|
$200.000
|
$155.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
204.000
|
$170.000
|
$235.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
94.000
|
$500.000
|
$1,150.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
725.000
|
$30.000
|
$45.000
|
|
|
CONCRETE OVERLAY (2 IN)
|
SY
|
5,400.000
|
$30.000
|
$91.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
27.000
|
$95.000
|
$200.000
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
6,985.000
|
$8.000
|
$4.000
|
|
|
CLEAN & PAINT EXIST STR (SPL PROT SYS)
|
LS
|
1.000
|
$68,000.000
|
$107,000.000
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
3,220.500
|
$125.000
|
$59.950
|
|
|
ARMOR JOINT
|
LF
|
300.000
|
$160.000
|
$137.500
|
|
|
MILLING CONCRETE SLAB (1 IN)
|
SY
|
5,400.000
|
$60.000
|
$6.050
|
|
|
HYDRO-DEMOLITION (1 IN)
|
SY
|
5,400.000
|
$130.000
|
$101.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
3.000
|
$200,000.000
|
$529,000.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
3,220.000
|
$12.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$550,000.000
|
$820,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$40,000.000
|
$62,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$25.000
|
$39.840
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$7.500
|
$13.450
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
50.000
|
$25.000
|
$54.470
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
50.000
|
$8.250
|
$25.560
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,600.000
|
$2.750
|
$5.080
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,600.000
|
$0.550
|
$0.990
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
240.000
|
$5.000
|
$6.830
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
240.000
|
$1.000
|
$2.570
|
|
|
CONSTRUCTING DETOURS
|
SY
|
90.000
|
$150.000
|
$500.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,550.000
|
$20.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
9.000
|
$1,500.000
|
$1,815.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,100.000
|
$1,045.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,114.000
|
$5.000
|
$3.300
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$2,800.000
|
$2,585.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$300.000
|
$275.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
10.000
|
$150.000
|
$234.300
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
10.000
|
$1,000.000
|
$908.740
|
|
|
CONDT (RM) (1")
|
LF
|
130.000
|
$10.000
|
$15.540
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
130.000
|
$1.250
|
$1.200
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
130.000
|
$1.400
|
$1.290
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
3.000
|
$2,100.000
|
$2,500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,500.000
|
$2,500.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
5.000
|
$550.000
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
63.000
|
$30.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
12.000
|
$28.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
15.000
|
$28.000
|
$22.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,272.000
|
$1.000
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,080.000
|
$1.000
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
47.000
|
$8.000
|
$8.800
|
|
|
WK ZN PAV MRK REMOV (W)(UTURN ARROW)
|
EA
|
2.000
|
$345.000
|
$357.500
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
2.000
|
$200.000
|
$357.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,095.000
|
$1.000
|
$2.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
640.000
|
$1.000
|
$10.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
330.000
|
$1.000
|
$2.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
47.000
|
$6.000
|
$6.600
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
3.000
|
$125.000
|
$170.500
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
3.000
|
$165.000
|
$203.500
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
6.000
|
$65.000
|
$60.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
29,961.000
|
$0.150
|
$1.100
|
|
|
PAVEMENT SEALER 8"
|
LF
|
330.000
|
$0.500
|
$3.300
|
|
|
PAVEMENT SEALER 24"
|
LF
|
47.000
|
$2.500
|
$5.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
3.000
|
$30.000
|
$55.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
3.000
|
$40.000
|
$55.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
6.000
|
$20.000
|
$55.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,000.000
|
$0.600
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
14,890.000
|
$0.400
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,071.000
|
$0.400
|
$1.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4.000
|
$5.000
|
$6.600
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
67.000
|
$3.000
|
$6.600
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
23,927.000
|
$0.520
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
330.000
|
$1.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
47.000
|
$4.000
|
$6.600
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
29,961.000
|
$0.100
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
330.000
|
$0.250
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
47.000
|
$1.500
|
$2.200
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
3.000
|
$20.000
|
$60.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
3.000
|
$30.000
|
$60.500
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
6.000
|
$8.500
|
$60.500
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
35.000
|
$300.000
|
$690.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$12,000.000
|
$16,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
8.000
|
$12,500.000
|
$29,400.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
150.000
|
$50.000
|
$55.000
|
|
|
TEMP Q-DETECT SYS
|
EA
|
2.000
|
$80,000.000
|
$71,280.000
|
|
|
TEMP Q-DETECT SYS (RELOCATE)
|
EA
|
8.000
|
$2,000.000
|
$2,400.000
|
|
Totals: |
$5,431,592.690
|
$8,251,402.975
|