Show Job Controls
Bid Cobra

DALLAS IH 345 (0092-14-092)

Items: 83

County: DALLAS
Length: N/A
Highway: IH 345
District: DALLAS
Control Number: 0092-14-092
DBE Goal: N/A
Project: C 92-14-92
Guaranty: N/A
Time: 125 WORKING DAYS
Engineer's Estimate: $4,091,631.61
Date: 06/05/2019 (7 years ago)
Contract Number: N/A
Type: FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$4,091,631.61
$3,979,913.91
Over/Under Est: -2.73% -$111,717.70
Over/Under Est: -2.54% -$104,003.74
Amt Left: 0.19% $7,713.96
Over/Under Est: 7.02% $287,368.39
Amt Left: 10.03% $399,086.09
Delta: -9.81% -$391,372.13
Over/Under Est: 21.25% $869,320.59
Amt Left: 24.65% $981,038.29
Delta: -13.29% -$581,952.20
$5,925,366.60
Over/Under Est: 44.82% $1,833,734.99
Amt Left: 48.88% $1,945,452.69
Delta: -19.44% -$964,414.40

Bid Items & Bid Tabulations

83 Total 0 of 83
DALLAS  |  IH 345  |  DALLAS  |  0092-14-092  |  06/05/2019  |  $4,091,631.61  |  C 92-14-92  |  FULL DEPTH CONC REPAIR ON FRONTAGE R...  |  125 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
GIBSON & ASSOCIATES, INC.
ED BELL CONSTRUCTION COMPANY
HIGHWAY 19 CONSTRUCTION LLC
FNH CONSTRUCTION, LLC
REMOVING CONC (PAV)
SY 8,178.000 $10.350 $7.000 $10.290 $10.750 $35.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 802.230 $11.450 $12.000 $11.440 $18.280 $20.000 $20.000
REMOVING CONC (CURB)
LF 840.000 $7.000 $8.000 $3.740 $10.500 $10.000 $20.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 9,214.000 $7.000 $6.000 $7.040 $5.220 $15.000 $20.000
EXCAVATION (ROADWAY)
CY 2,474.000 $21.000 $45.000 $21.340 $28.070 $10.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 215.000 $40.000 $50.000 $42.460 $42.460 $30.000 $35.000
COMPOST MANUF TOPSOIL (4")
SY 3,395.000 $3.000 $1.170 $1.430 $1.370 $4.000 $6.000
BLOCK SODDING
SY 3,395.000 $7.000 $6.000 $5.230 $4.990 $5.000 $6.000
VEGETATIVE WATERING
MG 505.000 $55.000 $25.000 $30.800 $5.820 $20.000 $50.000
LIME (HYD, COM, OR QK(SLURRY))
TON 210.000 $195.000 $165.000 $202.400 $150.000 $250.000 $181.000
LIME TRT (EXST MATL)(8")
SY 12,746.000 $5.500 $4.000 $5.390 $2.000 $8.000 $4.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 2,804.000 $93.000 $82.000 $96.970 $92.560 $100.000 $120.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 8,039.000 $92.000 $100.000 $93.400 $100.000 $135.000 $125.000
CONC PVMT (CONT REINF-CRCP) (HES)(12")
SY 2,608.000 $100.000 $110.000 $103.000 $150.000 $195.000 $165.000
FULL - DEPTH REPAIR CPCD (9")
SY 4,511.000 $205.000 $194.000 $210.000 $225.750 $150.000 $300.000
FULL - DEPTH REPAIR CPJR (9")
SY 1,588.000 $280.000 $210.000 $305.000 $325.500 $175.000 $350.000
CLEANING AND SEALING EXISTING JOINTS
LF 2,600.000 $15.000 $3.800 $17.000 $17.850 $20.000 $50.000
ADJUSTING INLETS
EA 2.000 $1,580.000 $1,100.000 $5,000.000 $2,540.150 $1,000.000 $2,500.000
MOBILIZATION
LS 1.000 $363,239.240 $390,000.000 $200,000.000 $395,970.260 $500,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $12,000.000 $33,000.000 $6,800.000 $10,000.000 $5,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 24.000 $51.000 $30.000 $33.000 $26.250 $65.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 24.000 $30.000 $12.000 $13.200 $13.130 $10.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 155.560 $30.000 $25.000 $27.500 $21.000 $35.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 155.560 $10.000 $10.000 $11.000 $10.500 $10.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,600.000 $3.750 $2.250 $1.930 $1.470 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,600.000 $0.550 $0.750 $0.550 $0.110 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 430.000 $5.040 $6.000 $4.350 $3.410 $5.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 430.000 $1.000 $1.000 $0.940 $1.050 $1.000 $9.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,560.000 $40.000 $30.000 $28.600 $25.950 $100.000 $80.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 60.000 $60.000 $43.000 $57.200 $63.130 $110.000 $80.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,680.000 $6.000 $2.000 $5.500 $4.980 $25.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 20.000 $11.000 $4.000 $11.000 $34.850 $25.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,560.000 $10.000 $9.000 $7.700 $7.990 $25.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 60.000 $10.000 $8.000 $15.400 $19.840 $25.000 $20.000
CONC CURB (TY I)
LF 840.000 $64.000 $12.000 $64.000 $67.200 $35.000 $28.000
CONC CURB (MONO) (TY II)
LF 2,994.000 $6.000 $6.000 $5.000 $4.870 $25.000 $14.000
DRIVEWAYS (CONC) (HES)
SY 802.230 $100.000 $70.000 $100.000 $95.000 $100.000 $120.000
CONC SIDEWALKS (5")
SY 657.000 $80.000 $45.000 $80.000 $95.000 $70.000 $65.000
CURB RAMPS (TY 1)
EA 1.000 $2,000.000 $1,300.000 $2,000.000 $2,500.000 $1,800.000 $2,000.000
CURB RAMPS (TY 7)
EA 7.000 $1,750.000 $1,800.000 $1,750.000 $2,350.000 $1,500.000 $2,000.000
CONDT (PVC) (SCH 40) (2")
LF 292.000 $7.500 $15.000 $16.500 $12.600 $50.000 $15.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 78.000 $26.000 $34.000 $37.400 $33.600 $100.000 $40.000
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,050.000 $1,350.000 $1,485.000 $1,306.470 $1,000.000 $1,000.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 2,581.000 $2.200 $3.000 $3.300 $0.580 $0.560 $4.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,933.000 $1.100 $2.000 $2.200 $1.050 $1.000 $3.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 4.000 $135.000 $200.000 $220.000 $246.750 $235.000 $250.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 4.000 $125.000 $300.000 $330.000 $378.000 $360.000 $350.000
WK ZN PAV MRK REMOV (W)(UTURN ARROW)
EA 1.000 $99.000 $500.000 $550.000 $383.250 $365.000 $550.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 2.000 $160.000 $250.000 $275.000 $299.250 $285.000 $300.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,322.000 $0.800 $2.000 $2.200 $0.580 $0.550 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 835.000 $1.050 $1.000 $1.100 $1.310 $1.230 $2.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 427.000 $3.850 $3.500 $3.850 $3.150 $3.000 $4.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 60.000 $6.600 $6.000 $6.600 $6.300 $6.000 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 63.000 $154.000 $150.000 $165.000 $126.000 $120.000 $200.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 3.000 $400.000 $750.000 $825.000 $929.250 $885.000 $900.000
PAVEMENT SEALER 4"
LF 54,327.000 $0.170 $0.120 $0.130 $0.260 $0.250 $0.200
PAVEMENT SEALER 8"
LF 985.000 $0.350 $0.300 $0.330 $0.530 $0.500 $0.500
PAVEMENT SEALER 12"
LF 427.000 $1.050 $1.500 $1.650 $0.790 $0.750 $2.500
PAVEMENT SEALER 24"
LF 60.000 $3.300 $2.250 $2.480 $1.050 $1.000 $4.000
PAVEMENT SEALER (ARROW)
EA 15.000 $30.000 $40.000 $44.000 $36.750 $35.000 $60.000
PAVEMENT SEALER (EXIT GORE)
EA 3.000 $370.000 $250.000 $275.000 $236.250 $225.000 $350.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,212.000 $0.500 $1.000 $1.100 $0.580 $0.550 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 24,049.000 $0.450 $0.500 $0.550 $0.470 $0.450 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 24,065.000 $0.450 $0.500 $0.550 $0.470 $0.450 $1.000
REFL PAV MRKR TY II-C-R
EA 392.000 $5.000 $4.000 $4.400 $5.250 $5.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 54,327.000 $0.500 $0.480 $0.530 $0.390 $0.370 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 835.000 $0.750 $0.550 $0.610 $0.890 $0.850 $1.000
ELIM EXT PAV MRK & MRKS (12")
LF 427.000 $1.750 $2.000 $2.200 $1.310 $1.250 $3.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 15.000 $45.000 $55.000 $60.500 $57.750 $55.000 $70.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 3.000 $350.000 $300.000 $330.000 $446.250 $425.000 $400.000
PAV SURF PREP FOR MRK (4")
LF 54,327.000 $0.100 $0.050 $0.060 $0.210 $0.200 $0.200
PAV SURF PREP FOR MRK (8")
LF 835.000 $0.170 $0.100 $0.110 $0.470 $0.450 $0.500
PAV SURF PREP FOR MRK (12")
LF 427.000 $0.500 $0.500 $0.550 $0.790 $0.750 $1.000
PAV SURF PREP FOR MRK (24")
LF 60.000 $1.150 $0.750 $0.830 $1.210 $1.160 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 15.000 $20.000 $35.000 $38.500 $36.750 $35.000 $60.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 3.000 $316.000 $250.000 $275.000 $236.250 $225.000 $350.000
TRF SIG CBL (TY C)(18 AWG)(2 CONDR)
LF 589.000 $2.000 $4.000 $4.400 $2.630 $15.000 $3.000
VEH LP DETECT (SAWCUT)
LF 271.000 $12.000 $45.000 $49.500 $17.850 $30.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $2,000.000 $20,000.000 $15,750.000 $10,000.000 $16,000.000
CONDUIT (PREPARE)
LF 72.000 $1.250 $5.000 $5.500 $6.300 $30.000 $15.000
GROUND BOX (PREPARE)
EA 4.000 $300.000 $400.000 $440.000 $525.000 $1,000.000 $350.000
TMA (STATIONARY)
EA 2.000 $15,000.000 $10,000.000 $26,000.000 $22,500.000 $25,000.000 $15,000.000
TMA (MOBILE OPERATION)
DAY 21.000 $290.000 $75.000 $250.000 $78.750 $500.000 $850.000
Totals: $4,091,631.614 $3,979,913.910 $3,987,627.871 $4,379,000.004 $4,960,952.200 $5,925,366.600