Show Job Controls
Bid Cobra

DALLAS SH 356 (0092-07-062)

Items: 96

County: DALLAS
Length: 6.0400 MILES
Highway: SH 356
District: DALLAS
Control Number: 0092-07-062
DBE Goal: 0.0%
Project: C 92-7-62
Guaranty: $100,000.00
Time: 188 WORKING DAYS
Engineer's Estimate: $7,112,439.85
Date: 10/02/2024 (1 year ago)
Contract Number: 10243209
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00196129
Project Description: FULL DEPTH CONCRETE REPAIR, MILL, INLAY, BRIDGE REPAIR AND PAVEMENT MARKINGS
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$7,112,439.85
$7,572,475.59
Over/Under Est: 6.47% $460,035.74
Over/Under Est: 7.01% $498,653.69
Amt Left: 0.51% $38,617.95
Over/Under Est: 9.85% $700,231.53
Amt Left: 3.17% $240,195.79
Delta: -2.65% -$201,577.84
$8,221,829.15
Over/Under Est: 15.6% $1,109,389.30
Amt Left: 8.58% $649,353.56
Delta: -5.24% -$409,157.77
Over/Under Est: 25% $1,778,419.65
Amt Left: 17.41% $1,318,383.91
Delta: -8.14% -$669,030.35
Over/Under Est: 25.1% $1,785,033.76
Amt Left: 17.5% $1,324,998.02
Delta: -0.07% -$6,614.11
$8,987,516.00
Over/Under Est: 26.36% $1,875,076.15
Amt Left: 18.69% $1,415,040.41
Delta: -1.01% -$90,042.39
Subcontractor Percentage Amount
GIBSON & ASSOCIATES, INC. 16.59% $1,152,157.01
O. TREVINO CONSTRUCTION, LLC 7.56% $525,033.58
JB PINNACLE GROUP, LLC 4.74% $329,187.72
STRIPE-A-ZONE, LLC 3.11% $215,986.03
FORTSON CONTRACTING, INC. 1.33% $92,367.02
J. H. ODEN CONTRACTING COMPANY 1.06% $73,615.82
HILBASH INVESTMENT LLC 1.04% $72,226.84
ACT SAW CUTTING & REMOVAL 0.54% $37,502.40
DALLAS LITE AND BARRICADE, INC. 0.39% $27,085.07
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.38% $26,390.58
BRENDA PRICE TRUCKING, INC. 0.28% $19,445.69
SOUTHEAST GRINDING AND GROOVING LLC 0.00% $0.00
TEXAS CUTTING & CORING, LP 0.00% $0.00
Total: 37.02% $2,570,997.76

Bid Items & Bid Tabulations

96 Total 0 of 96
DALLAS  |  SH 356  |  DALLAS  |  0092-07-062  |  10/02/2024  |  $7,112,439.85  |  C 92-7-62  |  REHAB EXIST ROADWAY  |  188 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
FOUTSCO PAVING COMPANY, LLC
TEXAS MATERIALS GROUP, INC.
JAGOE-PUBLIC COMPANY
RAGLE CONSTRUCTION, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
FNH CONSTRUCTION, LLC
REMOV CONC (RIPRAP)
CY 6.000 $100.000 $1,500.000 $30.000 $35.000 $1,600.000 $450.000 $150.000 $100.000
REMOV CONC (CURB)
LF 924.000 $25.000 $14.500 $15.000 $12.000 $15.000 $15.000 $15.000 $20.000
REMOV CONC (MISC)
SY 22.000 $30.000 $117.130 $50.000 $50.000 $400.000 $38.000 $150.000 $100.000
BLOCK SODDING
SY 838.000 $4.500 $11.490 $6.250 $16.000 $15.000 $17.100 $8.000 $10.000
VEGETATIVE WATERING
TGL 125.000 $25.000 $0.750 $100.000 $0.100 $10.000 $96.000 $400.000 $30.000
SP MIXES SP-C SAC-B PG70-22
TON 20,223.000 $125.000 $127.690 $158.000 $156.000 $160.000 $131.000 $160.000 $155.000
TACK COAT
GAL 13,612.000 $3.000 $0.220 $8.000 $4.500 $6.000 $7.000 $1.300 $1.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
SY 300.000 $135.000 $131.690 $125.000 $115.000 $100.000 $120.000 $225.000 $120.000
PLANE ASPH CONC PAV(0" TO 3")
SY 170,149.000 $2.900 $2.320 $1.700 $3.500 $3.000 $2.450 $6.000 $3.500
FLOWABLE BACKFILL
CY 17.000 $400.000 $765.000 $800.000 $750.000 $800.000 $420.000 $400.000 $350.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 44.000 $230.000 $82.000 $85.000 $100.000 $86.000 $150.000 $300.000 $350.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 18.000 $150.000 $100.000 $100.000 $122.000 $110.000 $250.000 $325.000 $500.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 2,103.000 $110.000 $20.000 $100.000 $24.000 $21.000 $50.000 $400.000 $400.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 561.000 $280.000 $50.000 $50.000 $60.000 $53.000 $100.000 $400.000 $350.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 245.000 $260.000 $250.000 $250.000 $310.000 $260.000 $250.000 $250.000 $250.000
CONC STR REPAIR (STANDARD)
SF 14.000 $257.000 $300.000 $300.000 $370.000 $320.000 $250.000 $250.000 $500.000
RIPRAP (CONC) (CL B) (4 IN)
CY 6.000 $568.000 $2,228.040 $950.000 $1,200.000 $1,900.000 $650.000 $850.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 87.000 $650.000 $708.580 $750.000 $1,000.000 $1,800.000 $1,000.000 $700.000 $550.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,220.000 $36.000 $40.000 $29.000 $35.000 $42.000 $29.000 $30.000 $80.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 508.000 $40.000 $36.000 $19.000 $22.000 $38.000 $19.000 $55.000 $80.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 446.000 $50.000 $48.000 $29.000 $35.000 $50.000 $29.000 $55.000 $80.000
CLEANING AND SEALING JOINTS (FOAM)
LF 212.000 $100.000 $95.000 $105.000 $125.000 $100.000 $105.000 $155.000 $110.000
POLYESTER POLYMER CONC OVERLAY (3/4")
SY 3,257.000 $150.000 $171.950 $150.000 $200.000 $200.000 $103.000 $120.000 $130.000
RETROFIT RAIL (TY SSTR)
LF 826.000 $200.000 $246.000 $200.000 $220.000 $240.000 $227.000 $300.000 $225.000
RETROFIT RAIL (TY C221)
LF 427.000 $240.000 $277.460 $200.000 $240.000 $270.000 $305.000 $300.000 $250.000
CLEAN EXIST CULVERTS
EA 1.000 $3,500.000 $46,000.000 $21,000.000 $19,500.000 $50,000.000 $2,700.000 $10,000.000 $5,000.000
ADJUST STL SHOES
EA 5.000 $4,000.000 $8,500.000 $8,500.000 $10,000.000 $9,000.000 $50,000.000 $15,000.000 $8,500.000
MOBILIZATION
LS 1.000 $1,000,000.000 $832,972.310 $740,000.000 $780,672.000 $910,000.000 $1,092,000.000 $880,000.000 $890,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $30,000.000 $100,460.000 $75,000.000 $41,000.000 $40,000.000 $162,800.000 $3,500.000 $12,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $18,000.000 $30,000.000 $13,000.000 $25,000.000 $25,000.000 $5,000.000 $16,500.000
TMA (STATIONARY)
DAY 276.000 $250.000 $200.000 $1.000 $1.000 $200.000 $346.000 $300.000 $250.000
TMA (MOBILE OPERATION)
DAY 138.000 $250.000 $14.500 $1.000 $1.000 $250.000 $689.000 $300.000 $550.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 268.000 $20.000 $45.000 $20.000 $47.000 $25.000 $34.000 $42.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 268.000 $8.000 $15.000 $5.000 $16.000 $5.000 $14.000 $20.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,100.000 $3.500 $4.000 $3.000 $4.150 $4.000 $3.500 $5.000 $4.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 2,200.000 $8.250 $11.000 $7.000 $12.000 $12.000 $9.000 $15.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,200.000 $1.000 $1.000 $1.000 $1.100 $1.000 $1.450 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,200.000 $4.250 $5.000 $3.000 $5.550 $5.000 $5.250 $8.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,200.000 $1.250 $1.000 $1.000 $1.100 $1.000 $1.500 $3.000 $9.000
PTB (FUR & INST)(STEEL)
LF 1,693.000 $50.000 $34.370 $10.000 $41.000 $40.000 $32.000 $36.000 $100.000
PTB (MOVE)(STEEL)
LF 1,693.000 $20.000 $13.100 $10.000 $18.500 $18.000 $11.000 $15.000 $20.000
PTB (REMOVE)(STEEL)
LF 1,693.000 $20.000 $11.660 $10.000 $20.500 $20.000 $11.000 $15.000 $20.000
CONC CURB (TY II)
LF 924.000 $32.000 $68.000 $48.000 $53.000 $75.000 $68.000 $75.000 $55.000
CONC SIDEWALKS (4")
SY 22.000 $140.000 $196.960 $150.000 $135.000 $400.000 $93.000 $150.000 $85.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,875.500 $25.000 $18.450 $22.000 $27.000 $22.000 $21.100 $28.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $3,000.000 $1,773.000 $1,800.000 $2,700.000 $3,000.000 $2,587.110 $2,200.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $15,000.000 $1,098.000 $1,200.000 $1,400.000 $1,900.000 $1,850.000 $1,700.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 2,630.000 $3.500 $1.500 $2.500 $2.750 $2.000 $2.000 $5.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $350.000 $200.000 $125.000 $145.000 $210.000 $200.000 $350.000 $500.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $300.000 $350.000 $250.000 $275.000 $210.000 $200.000 $350.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,200.000 $2,800.000 $2,800.000 $3,400.000 $3,200.000 $3,069.000 $4,000.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $600.000 $350.000 $250.000 $275.000 $210.000 $200.000 $350.000 $1,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,950.000 $1,204.610 $10,000.000 $2,500.000 $4,000.000 $1,125.000 $1,000.000 $6,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $15,000.000 $1,204.610 $1,000.000 $2,575.000 $2,000.000 $825.000 $2,500.000 $2,500.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 2.000 $25,000.000 $7,254.610 $5,000.000 $10,300.000 $10,000.000 $7,670.000 $15,000.000 $30,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 23.000 $35.000 $46.000 $25.000 $27.000 $26.000 $25.000 $35.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 9,160.000 $0.750 $0.250 $0.350 $0.370 $0.850 $0.350 $0.600 $1.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 36,602.000 $0.500 $0.240 $0.320 $0.340 $0.850 $0.320 $0.600 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 36,602.000 $0.500 $0.250 $0.350 $0.370 $0.850 $0.350 $0.600 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 36,602.000 $0.500 $0.240 $0.320 $0.340 $0.850 $0.320 $0.600 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,496.000 $1.000 $0.500 $1.000 $1.150 $3.000 $1.340 $0.010 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 8,584.000 $1.250 $1.100 $0.870 $0.900 $1.250 $0.870 $1.200 $2.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,098.000 $4.500 $5.950 $3.500 $3.700 $4.250 $3.500 $4.250 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,027.000 $6.000 $8.500 $6.750 $7.000 $7.500 $6.750 $10.000 $20.000
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
EA 110.000 $60.000 $225.000 $220.000 $230.000 $190.000 $220.000 $320.000 $500.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 74.000 $60.000 $205.000 $170.000 $180.000 $180.000 $170.000 $250.000 $250.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 2.000 $450.000 $1,500.000 $900.000 $955.000 $1,800.000 $900.000 $1,200.000 $1,500.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 2.000 $450.000 $1,200.000 $1,100.000 $1,150.000 $1,800.000 $1,100.000 $1,500.000 $1,500.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 286.000 $1.250 $1.050 $0.950 $1.000 $1.250 $0.950 $1.300 $2.000
PAVEMENT SLER 12"
LF 1,272.000 $0.500 $2.000 $0.500 $0.520 $0.850 $0.500 $1.000 $1.000
PAVEMENT SLER 24"
LF 585.000 $1.000 $3.000 $1.000 $1.050 $1.500 $1.000 $2.000 $20.000
PAVEMENT SLER (ARROW)
EA 18.000 $38.000 $60.000 $25.000 $26.000 $29.000 $25.000 $35.000 $250.000
PAVEMENT SLER (WORD)
EA 10.000 $28.000 $60.000 $25.000 $26.000 $36.000 $25.000 $35.000 $250.000
PAVEMENT SLER (ENTR GORE)
EA 2.000 $500.000 $300.000 $50.000 $53.000 $230.000 $50.000 $65.000 $1,000.000
PAVEMENT SLER (EXIT GORE)
EA 2.000 $500.000 $300.000 $75.000 $79.000 $240.000 $75.000 $100.000 $1,000.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 12,760.000 $0.750 $0.700 $0.600 $0.700 $0.800 $0.600 $1.000 $1.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 46,378.000 $0.750 $0.690 $0.580 $0.600 $0.750 $0.580 $1.000 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 46,378.000 $0.750 $0.690 $0.580 $0.600 $0.750 $0.580 $1.000 $1.000
REFL PAV MRKR TY II-C-R
EA 1,160.000 $5.000 $4.650 $3.880 $4.000 $4.500 $3.880 $5.000 $6.000
ELIM EXT PM & MRKS (12")
LF 1,272.000 $1.250 $2.250 $2.000 $2.150 $1.750 $2.000 $3.000 $6.000
ELIM EXT PM & MRKS (24")
LF 585.000 $3.000 $3.750 $3.500 $3.750 $3.000 $3.500 $4.250 $20.000
ELIM EXT PM & MRKS (ENTR GORE)
EA 2.000 $450.000 $400.000 $250.000 $265.000 $1,500.000 $250.000 $325.000 $500.000
ELIM EXT PM & MRKS (EXIT GORE)
EA 2.000 $450.000 $525.000 $300.000 $318.000 $1,500.000 $300.000 $350.000 $500.000
PAV SURF PREP FOR MRK (12")
LF 1,272.000 $0.500 $1.050 $0.350 $0.370 $0.300 $0.350 $0.550 $2.000
PAV SURF PREP FOR MRK (24")
LF 585.000 $1.150 $2.000 $0.750 $0.800 $0.550 $0.750 $1.100 $20.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 2.000 $150.000 $300.000 $500.000 $525.000 $180.000 $500.000 $700.000 $500.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 2.000 $300.000 $300.000 $500.000 $525.000 $180.000 $500.000 $700.000 $500.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 5,000.000 $6.000 $5.950 $5.950 $7.400 $6.500 $6.000 $8.000 $30.000
DRIFTWOOD REMOVAL
LS 1.000 $3,500.000 $10,000.000 $15,000.000 $12,000.000 $10,500.000 $25,000.000 $5,000.000 $50,000.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 0.100 $5,000.000 $7,500.000 $150,000.000 $9,000.000 $7,875.000 $10,000.000 $5,000.000 $200,000.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 40.000 $500.000 $1,000.000 $1,000.000 $500.000 $1,000.000 $716.000 $250.000 $500.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 24.000 $55.000 $140.000 $40.000 $1,700.000 $150.000 $100.000 $35.000 $100.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 78.000 $35.000 $150.000 $35.000 $180.000 $160.000 $110.000 $125.000 $100.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 62.000 $145.000 $1,150.000 $550.000 $1,400.000 $1,200.000 $612.000 $800.000 $850.000
FULL - DEPTH REPAIR CRCP (9")
SY 900.000 $250.000 $310.500 $320.000 $380.000 $350.000 $330.000 $325.000 $365.000
FULL-DEPTH REPAIR CPCD (10")
SY 280.000 $300.000 $315.500 $330.000 $390.000 $375.000 $335.000 $325.000 $450.000
Totals: $7,112,439.850 $7,572,475.595 $7,611,093.540 $7,812,671.380 $8,221,829.150 $8,890,859.500 $8,897,473.610 $8,987,516.000