DALLAS IH 45 (0092-02-144)

Items: 145

County: DALLAS
Length: 8.3000 MILES
Highway: IH 45
District: DALLAS
Control Number: 0092-02-144
DBE Goal: 0.0%
Project: C 92-2-144
Guaranty: $100,000.00
Time: 557 WORKING DAYS
Engineer's Estimate: $21,775,019.20
Date: 09/05/2025 (9 months ago)
Contract Number: 9253203
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00190748
Project Description: ADD SHOULDERS, BASE REPAIR, MILL AND INLAY, AND BRIDGE REPAIRS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$21,775,019.20
$18,231,669.12
Over/Under Est: -16.27% -$3,543,350.08
Over/Under Est: -13.35% -$2,907,032.90
Amt Left: 3.49% $636,317.18
Over/Under Est: -10.14% -$2,207,712.77
Amt Left: 7.33% $1,335,637.31
Delta: -3.71% -$699,320.13
Over/Under Est: -5.61% -$1,221,392.90
Amt Left: 12.74% $2,321,957.18
Delta: -5.04% -$986,319.87
Over/Under Est: -3.62% -$788,243.51
Amt Left: 15.11% $2,755,106.57
Delta: -2.11% -$433,149.39
Over/Under Est: -2% -$435,380.39
Amt Left: 17.05% $3,107,969.69
Delta: -1.68% -$352,863.12
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 9.27% $1,691,769.36
SILVER CREEK CONSTRUCTION, INC. 7.89% $1,439,920.20
J. H. ODEN CONTRACTING COMPANY 4.25% $775,622.41
DUSTROL, INC. 2.75% $501,873.33
STRIPE-A-ZONE, LLC 1.83% $333,973.89
FORTSON CONTRACTING, INC. 1.37% $250,024.17
CIVIL TREE SOLUTIONS, LLC 0.59% $107,674.64
IBCTX, LLC 0.58% $105,849.65
SITE BARRICADES 0.20% $36,499.88
AREA WIDE PROTECTIVE, INC. 0.16% $29,199.90
CHEROKEE SERVICES 0.05% $9,124.97
Total: 28.94% $5,281,532.40

Bid Items & Bid Tabulations

145 Total 0 of 145
DALLAS  |  IH 45  |  DALLAS  |  0092-02-144  |  09/05/2025  |  $21,775,019.20  |  C 92-2-144  |  REHAB EXIST ROADWAY  |  557 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
RAGLE CONSTRUCTION, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
GREY SKY CONSTRUCTION LLC
FOUTSCO PAVING COMPANY, LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 438.000 $5,000.000 $100.000 $4,000.000 $4,467.420 $4,250.000 $500.000 $1,675.000
REMOV CONC (RIPRAP)
SY 987.000 $40.000 $30.000 $9.700 $30.750 $50.000 $15.000 $20.000
REMOV CONC (DRIVEWAYS)
SY 78.000 $100.000 $200.000 $15.500 $95.140 $30.000 $50.000 $260.000
REMOV CONC (CURB)
LF 209.000 $25.000 $14.000 $5.900 $11.130 $20.000 $35.000 $41.000
REMOV CONC (MISC)
SY 1.000 $300.000 $1,000.000 $294.000 $1,305.240 $1,000.000 $200.000 $1,000.000
SUBGR WIDEN (OC)
STA 375.000 $350.000 $100.000 $991.000 $1,000.000 $250.000 $2,500.000 $2,000.000
EMBANK (FNL)(OC)(TY C1)
CY 5,075.000 $35.000 $80.000 $35.000 $23.550 $30.000 $20.000 $15.000
EMBANK (FNL)(DC)(TY C2)
CY 638.000 $80.000 $80.000 $242.000 $275.000 $50.000 $40.000 $100.000
BACKFILL (TY A OR B)
STA 375.000 $400.000 $1,000.000 $477.000 $345.290 $250.000 $50.000 $1,000.000
COMPOST MANUF TOPSOIL (4")
SY 37,713.000 $3.000 $1.070 $1.070 $2.420 $6.000 $1.000 $5.250
BLOCK SODDING
SY 37,713.000 $8.000 $4.000 $7.600 $4.000 $5.000 $1.000 $7.350
DRILL SEED (TEMP_WARM_COOL)
SY 37,713.000 $0.750 $0.240 $0.240 $0.240 $0.500 $0.100 $0.160
VEGETATIVE WATERING
TGL 11,220.000 $25.000 $1.000 $29.000 $0.010 $5.000 $1.000 $1.000
FL BS (CMP IN PLC)(TY-D GR-1-2)(14")
SY 33,789.000 $30.000 $43.000 $25.500 $37.450 $25.000 $58.000 $50.000
LIME (QUICKLIME (SLURRY))
TON 976.000 $500.000 $300.000 $317.000 $375.000 $400.000 $340.000 $400.000
LIME TRT (EXIST MATL)(8")
SY 41,774.000 $11.600 $12.000 $4.300 $16.000 $6.000 $15.000 $10.000
PRIME COAT(MC-30 OR AE-P)
GAL 10,529.000 $8.000 $5.000 $6.100 $7.000 $5.000 $1.000 $6.300
SP MIXES SP-C SAC-B PG70-22
TON 33,570.000 $135.000 $160.000 $133.000 $125.000 $150.000 $170.000 $144.000
TACK COAT
GAL 21,722.000 $4.000 $4.000 $5.700 $3.840 $6.000 $10.000 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
SY 26,610.000 $100.000 $80.750 $80.000 $75.000 $90.000 $75.500 $80.000
PLANE ASPH CONC PAV(0" TO 3")
SY 164,052.000 $3.000 $2.000 $2.900 $1.500 $3.000 $1.500 $2.000
FULL-DEPTH REPAIR CPCD (8")
SY 2,162.000 $300.000 $228.000 $250.000 $330.000 $450.000 $150.000 $255.000
FULL-DEPTH REPAIR CRCP (12")
SY 3,000.000 $500.000 $290.000 $328.600 $338.000 $600.000 $200.000 $350.000
FLOWABLE BACKFILL
CY 13.500 $500.000 $310.000 $300.000 $610.050 $350.000 $575.000 $2,500.000
TRENCH EXCAVATION PROTECTION
LF 260.000 $35.000 $260.000 $6.000 $15.000 $10.000 $10.000 $25.000
TEMPORARY SPL SHORING
SF 2,772.000 $50.000 $30.000 $65.700 $40.000 $75.000 $65.000 $100.000
CL B CONC (FLUME)
CY 1.400 $3,000.000 $1,400.000 $1,100.000 $1,397.640 $650.000 $1,250.000 $2,500.000
CL B CONC (MISC)
CY 3.600 $600.000 $1,400.000 $924.000 $1,373.580 $1,500.000 $650.000 $2,500.000
CL C CONC (RAIL FOUNDATION)
CY 42.000 $850.000 $1,000.000 $605.000 $609.610 $1,250.000 $850.000 $1,000.000
RETAINING WALL (MSE)
SF 2,612.000 $125.000 $150.000 $64.600 $120.000 $75.000 $133.000 $123.750
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 20.000 $250.000 $600.000 $150.000 $143.000 $500.000 $135.000 $945.000
RIPRAP (CONC)(4 IN)
CY 65.000 $1,250.000 $800.000 $838.000 $551.040 $550.000 $650.000 $1,500.000
RIPRAP (CONC)(5 IN)
CY 5.000 $1,000.000 $900.000 $861.000 $1,283.270 $650.000 $750.000 $1,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 310.000 $500.000 $800.000 $648.000 $599.290 $500.000 $650.000 $1,000.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 53.000 $350.000 $235.000 $186.000 $230.040 $135.000 $200.000 $225.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 678.000 $300.000 $200.000 $188.000 $167.710 $155.000 $208.000 $250.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 19.000 $300.000 $300.000 $209.000 $449.490 $180.000 $210.000 $450.000
CLEANING EXISTING JOINTS
LF 112.000 $65.000 $115.000 $31.000 $41.000 $10.000 $80.000 $100.000
RAIL (TY SSTR)
LF 573.000 $175.000 $285.000 $109.000 $212.350 $250.000 $222.000 $150.000
RETROFIT RAIL (TY SSTR)(HPC)
LF 400.000 $350.000 $320.000 $194.000 $204.480 $250.000 $345.000 $200.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 32.000 $1,200.000 $1,090.000 $913.000 $850.000 $1,000.000 $1,289.000 $1,000.000
RC PIPE (CL III)(24 IN)
LF 16.000 $500.000 $120.000 $189.000 $160.000 $120.000 $125.000 $240.000
RC PIPE (CL III)(30 IN)
LF 5.000 $300.000 $165.000 $339.000 $300.000 $150.000 $300.000 $450.000
RC PIPE (CL III)(36 IN)
LF 72.000 $200.000 $260.000 $208.000 $325.000 $175.000 $340.000 $300.000
RC PIPE (CL III)(60 IN)
LF 32.000 $500.000 $500.000 $512.000 $550.000 $500.000 $500.000 $700.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 1.000 $13,000.000 $8,100.000 $8,550.000 $5,187.480 $5,000.000 $10,500.000 $10,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $16,000.000 $10,800.000 $8,300.000 $10,500.000 $6,000.000 $12,000.000 $15,000.000
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 1.000 $17,000.000 $25,000.000 $16,400.000 $25,000.000 $25,000.000 $20,000.000 $30,000.000
WINGWALL (PW - 2) (HW=10 FT)
EA 1.000 $25,000.000 $70,000.000 $44,500.000 $45,000.000 $56,000.000 $59,000.000 $55,000.000
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 7.000 $1,500.000 $950.000 $1,770.000 $900.000 $1,100.000 $1,200.000 $1,200.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 10.000 $1,000.000 $1,060.000 $1,865.000 $900.000 $1,100.000 $1,525.000 $1,200.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 1.000 $1,705.000 $1,200.000 $2,285.000 $1,000.000 $1,250.000 $2,000.000 $1,800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 12.000 $1,190.000 $1,285.000 $2,285.000 $1,000.000 $1,250.000 $2,000.000 $1,800.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 3.000 $1,900.000 $1,500.000 $2,870.000 $2,500.000 $2,200.000 $2,350.000 $2,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $1,550.000 $1,600.000 $2,870.000 $2,500.000 $2,300.000 $2,350.000 $2,400.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 1.000 $2,500.000 $2,400.000 $3,862.000 $3,500.000 $3,200.000 $3,000.000 $3,000.000
ADJUSTING INLETS
EA 2.000 $12,000.000 $5,000.000 $1,275.000 $2,000.000 $2,500.000 $2,500.000 $5,000.000
REMOV STR (SET)
EA 10.000 $130.000 $300.000 $622.000 $934.170 $500.000 $500.000 $500.000
REMOV STR (WINGWALL)
EA 1.000 $10,000.000 $1,000.000 $1,563.000 $1,500.000 $2,500.000 $2,500.000 $7,500.000
REMOV STR (HEADWALL)
EA 4.000 $8,000.000 $1,000.000 $1,777.000 $1,500.000 $2,500.000 $1,000.000 $2,000.000
REMOV STR (PIPE)
LF 16.000 $25.000 $30.000 $22.700 $60.000 $50.000 $30.000 $350.000
MOBILIZATION
LS 1.000 $1,750,000.000 $1,825,000.000 $1,800,000.000 $2,152,403.790 $2,000,000.000 $1,500,000.000 $2,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 35.000 $35,000.000 $18,300.000 $32,000.000 $35,000.000 $10,000.000 $100,000.000 $54,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $20,000.000 $18,000.000 $5,960.000 $18,000.000 $20,000.000 $25,000.000 $20,000.000
TMA (STATIONARY)
DAY 600.000 $400.000 $25.000 $346.000 $0.010 $250.000 $1.000 $150.000
TMA (MOBILE OPERATION)
DAY 42.000 $400.000 $25.000 $678.000 $1,135.390 $550.000 $1.000 $1,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 918.000 $45.000 $68.000 $68.000 $68.000 $35.000 $30.000 $85.200
ROCK FILTER DAMS (REMOVE)
LF 918.000 $17.000 $15.000 $15.000 $15.000 $20.000 $5.000 $47.930
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 924.000 $45.000 $35.000 $35.000 $35.000 $50.000 $25.000 $31.950
CONSTRUCTION EXITS (REMOVE)
SY 924.000 $15.000 $15.000 $15.000 $15.000 $20.000 $5.000 $17.570
TEMP SEDMT CONT FENCE (INSTALL)
LF 32,030.000 $7.000 $3.990 $3.990 $3.990 $3.000 $1.000 $2.660
TEMP SEDMT CONT FENCE (REMOVE)
LF 32,030.000 $2.500 $0.350 $0.350 $0.350 $1.000 $0.250 $1.330
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,600.000 $5.000 $5.750 $5.750 $5.750 $10.000 $1.000 $5.330
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,600.000 $2.500 $1.000 $1.000 $1.000 $5.000 $0.250 $2.660
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 440.000 $50.000 $63.000 $21.700 $46.130 $100.000 $60.000 $40.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 20.000 $110.000 $63.000 $23.500 $94.880 $100.000 $60.000 $80.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,760.000 $25.000 $38.000 $9.100 $15.000 $20.000 $40.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 100.000 $25.000 $38.000 $12.200 $15.910 $20.000 $30.000 $40.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 440.000 $20.000 $48.000 $11.500 $18.480 $20.000 $40.000 $25.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 20.000 $25.000 $48.000 $13.400 $10.800 $20.000 $40.000 $50.000
CONC CURB (TY II)
LF 300.000 $35.000 $43.000 $16.500 $19.190 $55.000 $45.000 $75.000
DRIVEWAYS (CONC)
SY 78.000 $275.000 $300.000 $156.000 $138.400 $100.000 $125.000 $280.000
DRIVEWAYS (ACP)
SY 412.000 $130.000 $150.000 $183.000 $234.540 $50.000 $50.000 $250.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,491.250 $32.000 $22.500 $21.690 $21.690 $26.000 $22.500 $23.960
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 22.000 $1,800.000 $5,000.000 $2,840.000 $2,480.990 $1,850.000 $1,850.000 $3,328.080
DRIVEWAY TERMINAL ANCHOR SECTION
EA 1.000 $850.000 $1,200.000 $1,390.000 $1,390.000 $1,850.000 $725.000 $772.130
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 17.000 $1,800.000 $3,200.000 $1,475.000 $1,475.000 $1,850.000 $1,200.000 $1,278.000
REMOVE METAL BEAM GUARD FENCE
LF 4,883.000 $5.000 $2.500 $2.500 $2.500 $3.000 $2.500 $2.660
REMOVE TERMINAL ANCHOR SECTION
EA 18.000 $350.000 $150.000 $250.000 $250.000 $500.000 $150.000 $159.750
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,000.000 $5,000.000 $3,355.000 $3,355.000 $3,850.000 $2,950.000 $3,141.750
GUARDRAIL END TREATMENT (REMOVE)
EA 17.000 $350.000 $250.000 $250.000 $250.000 $1,500.000 $250.000 $266.250
PIPE UNDERDRAINS (TY 6) (6")
LF 400.000 $40.000 $40.000 $30.800 $57.720 $50.000 $65.000 $40.610
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 7.000 $225.000 $500.000 $275.000 $275.000 $850.000 $300.000 $372.750
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $250.000 $400.000 $325.000 $325.000 $850.000 $350.000 $356.780
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $580.000 $1,000.000 $790.000 $790.000 $850.000 $900.000 $660.300
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF(BR)
EA 94.000 $120.000 $65.000 $99.000 $99.000 $100.000 $65.000 $69.230
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BR)
EA 6.000 $50.000 $20.000 $15.000 $15.000 $100.000 $20.000 $21.300
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR)
EA 6.000 $50.000 $20.000 $15.000 $15.000 $100.000 $20.000 $21.300
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 122.000 $50.000 $25.000 $25.000 $25.000 $100.000 $25.000 $26.630
INSTL OM SM RD SIGN (1-OM-CON)R
EA 108.000 $10.000 $160.000 $25.000 $25.000 $100.000 $50.000 $26.630
INSTL OM SM RD SIGN (1-OM-CON)W
EA 37.000 $10.000 $160.000 $25.000 $25.000 $100.000 $50.000 $26.630
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 14,283.000 $0.750 $0.300 $0.380 $0.380 $0.650 $0.300 $0.320
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 56,632.000 $0.500 $0.200 $0.380 $0.380 $0.650 $0.200 $0.210
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 56,632.000 $0.500 $0.200 $0.380 $0.380 $0.650 $0.200 $0.210
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,725.000 $2.250 $0.840 $0.900 $0.500 $5.000 $1.000 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,260.000 $0.750 $0.870 $0.900 $0.900 $4.000 $0.870 $0.930
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 238.000 $1.250 $3.000 $2.750 $2.750 $6.000 $3.000 $3.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,352.000 $14.000 $6.200 $6.000 $6.000 $12.000 $6.200 $6.600
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 18.000 $150.000 $170.000 $195.000 $195.000 $250.000 $170.000 $181.050
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 4.000 $175.000 $221.000 $405.000 $405.000 $500.000 $221.000 $235.370
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 18.000 $175.000 $160.000 $225.000 $225.000 $250.000 $160.000 $170.400
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 14.000 $1,700.000 $800.000 $1,000.000 $1,000.000 $1,500.000 $800.000 $852.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 14.000 $1,400.000 $1,000.000 $1,000.000 $1,000.000 $1,500.000 $1,000.000 $1,065.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 2,354.000 $1.000 $1.050 $0.900 $0.900 $4.000 $1.050 $1.120
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 2,775.000 $8.630 $6.200 $6.000 $6.000 $12.000 $6.200 $6.600
PAVEMENT SLER 6"
LF 53,985.000 $0.500 $0.190 $0.200 $0.200 $0.750 $0.190 $0.200
PAVEMENT SLER 8"
LF 2,642.000 $0.650 $0.310 $0.200 $0.200 $4.000 $0.310 $0.330
PAVEMENT SLER 24"
LF 2,849.000 $0.900 $1.250 $0.490 $0.490 $12.000 $1.250 $1.330
PAVEMENT SLER (ARROW)
EA 2.000 $6.000 $50.000 $12.500 $12.500 $250.000 $50.000 $53.250
PAVEMENT SLER (UTURN ARROW)
EA 2.000 $6.000 $60.000 $18.000 $18.000 $250.000 $60.000 $63.900
PAVEMENT SLER (ENTR GORE)
EA 10.000 $35.000 $300.000 $200.000 $200.000 $500.000 $300.000 $319.500
PAVEMENT SLER (EXIT GORE)
EA 10.000 $35.000 $400.000 $200.000 $200.000 $500.000 $400.000 $426.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 18,113.000 $0.900 $0.700 $0.600 $0.600 $0.650 $0.700 $0.750
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 97,437.000 $0.850 $0.520 $0.490 $0.490 $0.650 $0.520 $0.550
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 103,820.000 $0.750 $0.520 $0.490 $0.490 $0.650 $0.520 $0.550
REFL PAV MRKR TY II-C-R
EA 2,049.000 $7.500 $3.750 $3.500 $3.500 $5.000 $3.750 $3.990
ELIM EXT PM & MRKS (6")
LF 53,985.000 $0.500 $0.350 $0.450 $0.450 $0.650 $0.350 $0.370
ELIM EXT PM & MRKS (8")
LF 2,642.000 $0.650 $0.700 $0.600 $0.600 $3.000 $0.700 $0.750
ELIM EXT PM & MRKS (12")
LF 2,028.000 $1.250 $1.500 $1.000 $1.000 $6.000 $1.500 $1.600
ELIM EXT PM & MRKS (24")
LF 692.000 $2.000 $2.750 $2.750 $2.750 $12.000 $2.750 $2.930
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $110.000 $65.000 $50.000 $50.000 $250.000 $65.000 $69.230
ELIM EXT PM & MRKS (UTURN ARROW)
EA 2.000 $10.000 $85.000 $75.000 $75.000 $250.000 $85.000 $90.530
ELIM EXT PM & MRKS (WORD)
EA 6.000 $65.000 $75.000 $50.000 $50.000 $250.000 $75.000 $79.880
ELIM EXT PM & MRKS (ENTR GORE)
EA 10.000 $300.000 $300.000 $250.000 $250.000 $1,500.000 $300.000 $319.500
ELIM EXT PM & MRKS (EXIT GORE)
EA 10.000 $300.000 $500.000 $250.000 $250.000 $1,500.000 $500.000 $532.500
PAV SURF PREP FOR MRK (6")
LF 53,985.000 $0.750 $0.020 $0.050 $0.050 $0.650 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 2,642.000 $0.850 $0.100 $0.070 $0.070 $4.000 $0.100 $0.110
PAV SURF PREP FOR MRK (24")
LF 2,849.000 $1.000 $0.200 $0.180 $0.180 $12.000 $0.200 $0.210
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $10.000 $20.000 $5.000 $5.000 $250.000 $20.000 $21.300
PAV SURF PREP FOR MRK (UTURN ARR)
EA 2.000 $10.000 $25.000 $5.000 $5.000 $250.000 $25.000 $26.630
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $10.000 $30.000 $5.000 $5.000 $250.000 $30.000 $31.950
PAV SURF PREP FOR MRK (ENTR GORE)
EA 10.000 $25.000 $50.000 $50.000 $50.000 $500.000 $50.000 $53.250
PAV SURF PREP FOR MRK (EXIT GORE)
EA 10.000 $25.000 $75.000 $50.000 $50.000 $500.000 $75.000 $79.880
FULL - WIDTH MOWING
CYC 2.000 $10,000.000 $10,000.000 $1,000.000 $10,000.000 $1,500.000 $10,000.000 $10,000.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 480.000 $3.400 $15.000 $10.200 $8.490 $25.000 $10.000 $50.000
Totals: $21,775,019.200 $18,231,669.115 $18,867,986.302 $19,567,306.422 $20,553,626.300 $20,986,775.685 $21,339,638.810
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $325,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $500,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $360,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $45,000.00
Total: $1,230,000.00