Show Job Controls
Bid Cobra

DALLAS SH 310 (0092-02-138)

Items: 119

County: DALLAS
Length: N/A
Highway: SH 310
District: DALLAS
Control Number: 0092-02-138
DBE Goal: 500.0%
Project: STP 2B24(163)VRU
Guaranty: N/A
Time: 169 WORKING DAYS
Engineer's Estimate: $2,640,793.42
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,640,793.42
$2,894,528.77
Over/Under Est: 9.61% $253,735.35
$2,970,255.00
Over/Under Est: 12.48% $329,461.58
Amt Left: 2.62% $75,726.23
Over/Under Est: 16.25% $429,203.27
Amt Left: 6.06% $175,467.92
Delta: -3.36% -$99,741.69
Subcontractor Percentage Amount
RAGLE CONSTRUCTION, INC. 13.89% $424,861.72
PEACHTREE CONSTRUCTION, LTD. 12.15% $371,639.30
JC DIRECTIONAL DRILLING 7.12% $217,783.69
DUSTROL, INC. 2.33% $71,269.10
ELITE STRIPING, LLC 1.50% $45,881.40
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.36% $11,011.53
AAA DRILLING FOUNDATION COMPANY, INC. 0.22% $6,729.27
STRAIGHT LINE SAWING & SEALING, INC. 0.08% $2,447.01
H TORRES TRUCKING, L.L.C. 0.05% $1,529.38
Total: 37.70% $1,153,152.40

Bid Items & Bid Tabulations

119 Total 0 of 119
DALLAS  |  SH 310  |  DALLAS  |  0092-02-138  |  06/05/2024  |  $2,640,793.42  |  STP 2B24(163)VRU  |  INTERS IMPRV  |  169 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SELECT MAINTENANCE, L.L.C.
FNH CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 29.000 $5,000.000 $10,000.000 $10,345.000 $9,450.000
REMOVING CONC (PAV)
SY 10,500.000 $25.000 $12.000 $17.500 $26.250
REMOVING CONC (SIDEWALKS)
SY 225.000 $40.000 $30.000 $20.000 $42.000
REMOVING CONC (DRIVEWAYS)
SY 64.000 $30.000 $30.000 $20.000 $42.000
REMOVING CONC (CURB AND GUTTER)
LF 4,406.000 $25.000 $6.500 $20.000 $15.750
REMOVING STAB BASE & ASPH PAV (0-6")
SY 14,053.000 $9.500 $5.700 $10.000 $5.250
EXCAVATION (ROADWAY)
CY 1,154.000 $30.000 $80.000 $20.000 $5.250
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,555.000 $35.000 $50.250 $50.000 $21.000
COMPOST MANUF TOPSOIL (4")
SY 11,964.000 $4.000 $1.000 $10.000 $1.050
BLOCK SODDING
SY 11,964.000 $7.000 $7.480 $10.000 $4.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 11,964.000 $0.600 $0.350 $0.500 $0.300
VEGETATIVE WATERING
MG 3,559.000 $20.000 $20.000 $10.000 $1.050
FL BS (CMP IN PLC)(TY D GR1-2)(8")
SY 4,241.000 $30.000 $18.500 $28.000 $42.000
LIME TRT (EXST MATL) (6")
SY 4,241.000 $10.000 $7.000 $12.000 $10.500
LIME (HYD, COM, OR QK(SLURRY))
TON 75.000 $340.000 $320.000 $400.000 $420.000
PRIME COAT (MULTI OPTION)
GAL 729.000 $10.000 $12.000 $10.000 $10.500
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 26.000 $600.000 $350.000 $550.000 $714.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $750.000 $465.000 $650.000 $756.000
MOBILIZATION
LS 1.000 $259,125.000 $290,000.000 $290,000.000 $304,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $17,500.000 $30,500.000 $8,500.000 $41,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 55.000 $30.000 $28.000 $30.000 $57.750
ROCK FILTER DAMS (REMOVE)
LF 55.000 $15.000 $15.000 $15.000 $31.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 434.000 $35.000 $31.000 $40.000 $28.350
CONSTRUCTION EXITS (REMOVE)
SY 434.000 $12.000 $14.000 $20.000 $15.750
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,726.000 $3.500 $3.100 $4.000 $2.890
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,726.000 $1.170 $1.000 $2.000 $1.050
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 225.000 $6.000 $3.250 $18.000 $4.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 225.000 $2.500 $1.000 $9.000 $2.100
CONC CURB & GUTTER (TY II)
LF 387.000 $125.000 $50.000 $65.000 $94.500
DRIVEWAYS (ACP)
SY 1,508.000 $70.000 $115.000 $50.000 $130.020
CONC SIDEWALKS (4")
SY 45.000 $120.000 $100.000 $650.000 $168.000
CURB RAMPS (TY 5)
EA 2.000 $3,500.000 $4,000.000 $3,250.000 $4,200.000
CURB RAMPS (TY 7)
EA 2.000 $2,850.000 $2,000.000 $3,250.000 $3,150.000
CURB RAMPS (TY 22)
EA 1.000 $4,000.000 $6,000.000 $3,250.000 $7,350.000
REMOVE METAL BEAM GUARD FENCE
LF 518.000 $5.000 $10.000 $3.000 $5.250
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $310.000 $500.000 $500.000 $315.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $450.000 $500.000 $1,500.000 $315.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 10.000 $350.000 $295.000 $1,000.000 $273.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $350.000 $355.000 $1,000.000 $278.250
MAILBOX INSTALL-M (TWG-POST) TY 4
EA 1.000 $500.000 $669.000 $1,000.000 $606.900
CONDT (PVC) (SCH 40) (2")
LF 360.000 $20.000 $26.000 $22.000 $21.000
CONDT (PVC) (SCH 40) (3")
LF 80.000 $30.000 $26.000 $33.000 $35.180
CONDT (PVC) (SCH 40) (4")
LF 50.000 $35.000 $26.000 $44.000 $36.750
CONDT (PVC) (SCH 40) (4") (BORE)
LF 520.000 $55.000 $52.000 $60.000 $39.900
CONDT (PVC) (SCH 80) (2")
LF 30.000 $20.000 $26.000 $25.000 $27.830
ELEC CONDR (NO.12) INSULATED
LF 160.000 $1.500 $3.000 $3.000 $1.890
ELEC CONDR (NO.8) INSULATED
LF 440.000 $2.250 $2.200 $3.000 $2.730
ELEC CONDR (NO.6) BARE
LF 760.000 $3.000 $2.400 $3.000 $2.630
ELEC CONDR (NO.6) INSULATED
LF 630.000 $3.000 $2.700 $3.000 $3.470
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,800.000 $2,500.000 $1,500.000 $1,522.500
GROUND BOX TY C (162911)W/APRON
EA 4.000 $1,900.000 $3,000.000 $2,500.000 $1,837.500
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 1.000 $9,800.000 $25,000.000 $9,500.000 $12,600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,000.000 $775.000 $1,500.000 $886.200
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $1,000.000 $1,185.000 $1,500.000 $968.100
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 1.000 $1,000.000 $1,375.000 $1,500.000 $1,025.850
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $750.000 $665.000 $1,000.000 $577.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 26.000 $1.500 $18.850 $2.000 $1.580
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,699.000 $1.600 $3.000 $2.000 $1.160
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 74.000 $4.500 $8.000 $10.000 $9.710
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 584.000 $10.000 $14.750 $10.000 $11.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 27.000 $190.000 $170.000 $250.000 $183.750
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 14.000 $250.000 $240.000 $350.000 $204.750
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 4.000 $75.000 $117.000 $250.000 $52.500
REFL PAV MRK TY II (W) 6" (BRK)
LF 1,621.000 $0.750 $1.000 $1.000 $0.320
REFL PAV MRK TY II (W) 6" (DOT)
LF 26.000 $1.750 $2.000 $1.000 $0.630
REFL PAV MRK TY II (W) 6" (SLD)
LF 5,857.000 $0.750 $0.750 $1.000 $0.320
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,699.000 $0.700 $1.000 $6.000 $0.530
REFL PAV MRK TY II (W) 12" (SLD)
LF 74.000 $5.500 $3.000 $6.000 $2.630
REFL PAV MRK TY II (W) 24" (SLD)
LF 584.000 $11.000 $6.000 $10.000 $4.460
REFL PAV MRK TY II (W) (ARROW)
EA 27.000 $100.000 $120.000 $250.000 $84.000
REFL PAV MRK TY II (W) (WORD)
EA 14.000 $100.000 $140.000 $250.000 $84.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 4.000 $30.000 $55.000 $250.000 $26.250
REFL PAV MRK TY II (Y) 6" (SLD)
LF 6,561.000 $0.600 $0.750 $1.000 $0.320
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,621.000 $1.100 $1.500 $1.000 $0.990
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 5,857.000 $1.000 $1.000 $1.000 $0.950
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 6,561.000 $1.200 $1.000 $1.000 $0.950
REFL PAV MRKR TY I-C
EA 167.000 $6.500 $7.250 $6.000 $6.250
REFL PAV MRKR TY II-A-A
EA 216.000 $7.500 $7.250 $6.000 $6.250
ELIM EXT PAV MRK & MRKS (4")
LF 12,770.000 $1.000 $0.510 $1.000 $3.000
ELIM EXT PAV MRK & MRKS (12")
LF 285.000 $2.500 $2.000 $3.000 $13.300
ELIM EXT PAV MRK & MRKS (24")
LF 93.000 $5.500 $4.000 $20.000 $16.690
PAV SURF PREP FOR MRK (6")
LF 14,065.000 $0.500 $0.200 $1.000 $0.050
PAV SURF PREP FOR MRK (8")
LF 1,699.000 $0.500 $0.500 $1.000 $0.110
PAV SURF PREP FOR MRK (12")
LF 74.000 $2.000 $1.000 $1.000 $0.790
PAV SURF PREP FOR MRK (24")
LF 584.000 $2.000 $3.000 $1.000 $1.050
PAV SURF PREP FOR MRK (ARROW)
EA 27.000 $40.000 $60.000 $250.000 $42.000
PAV SURF PREP FOR MRK (WORD)
EA 14.000 $40.000 $75.000 $250.000 $42.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 4.000 $20.000 $40.000 $250.000 $15.750
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $35,000.000 $151,000.000 $55,000.000 $45,675.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $7,500.000 $25,000.000 $10,000.000 $18,375.000
VEH SIG SEC (12")LED(GRN)
EA 11.000 $510.000 $300.000 $350.000 $462.000
VEH SIG SEC (12")LED(GRN ARW)
EA 5.000 $510.000 $300.000 $350.000 $462.000
VEH SIG SEC (12")LED(YEL)
EA 11.000 $510.000 $300.000 $350.000 $462.000
VEH SIG SEC (12")LED(YEL ARW)
EA 10.000 $510.000 $300.000 $350.000 $462.000
VEH SIG SEC (12")LED(RED)
EA 11.000 $510.000 $300.000 $350.000 $462.000
VEH SIG SEC (12")LED(RED ARW)
EA 10.000 $510.000 $300.000 $350.000 $462.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $1,200.000 $1,000.000 $4,500.000 $1,155.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 11.000 $230.000 $215.000 $250.000 $231.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 5.000 $270.000 $215.000 $300.000 $304.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 479.000 $3.000 $4.700 $3.000 $4.310
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 323.000 $3.500 $4.500 $3.000 $4.730
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 640.000 $6.000 $4.700 $3.000 $5.460
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 640.000 $6.000 $4.700 $3.000 $8.930
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 1,320.000 $3.000 $3.100 $3.000 $2.520
INS TRF SIG PL AM(S)1 ARM(48')
EA 1.000 $14,500.000 $16,000.000 $30,000.000 $23,415.000
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 1.000 $20,000.000 $17,000.000 $32,000.000 $27,825.000
INS TRF SIG PL AM(S)1 ARM(55')
EA 1.000 $35,000.000 $30,000.000 $45,000.000 $46,410.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $36,000.000 $32,000.000 $50,000.000 $50,925.000
PED POLE ASSEMBLY
EA 4.000 $4,500.000 $2,500.000 $6,500.000 $4,042.500
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,300.000 $1,000.000 $1,850.000 $2,079.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $4,000.000 $5,000.000 $6,500.000 $6,825.000
SALVAGE TRAFFIC SIGNAL
EA 1.000 $2,500.000 $10,000.000 $15,000.000 $5,775.000
SP MIXES SP-B PG64-22
TON 802.000 $172.500 $225.000 $180.000 $184.800
SP MIXES SP-C SAC-B PG70-22
TON 394.000 $200.000 $225.000 $250.000 $195.300
TACK COAT
GAL 216.000 $4.500 $4.000 $10.000 $4.200
TMA (STATIONARY)
DAY 40.000 $350.000 $250.000 $250.000 $262.500
TMA (MOBILE OPERATION)
HR 96.000 $75.000 $65.100 $55.000 $135.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 1.000 $5,500.000 $5,000.000 $6,500.000 $8,715.000
RVDS(PRESENCE AND ADVANCE DET)
EA 8.000 $8,000.000 $10,000.000 $15,000.000 $14,175.000
Totals: $2,640,793.420 $2,894,528.770 $2,970,255.000 $3,069,996.690