DALLAS IH 45 (0092-02-135)

Items: 76

County: DALLAS
Length: N/A
Highway: IH 45
District: DALLAS
Control Number: 0092-02-135
DBE Goal: 550.0%
Project: F 2B23(093)
Guaranty: N/A
Time: 189 WORKING DAYS
Engineer's Estimate: $7,580,945.00
Date: 01/04/2024 (2 years ago)
Contract Number: N/A
Type: FDCR, FLEX PAV REP, & BRIDGE SCOUR REP
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$7,580,945.00
$7,294,650.85
Over/Under Est: -3.78% -$286,294.15
Over/Under Est: 7.59% $575,647.50
Amt Left: 11.82% $861,941.65
$9,648,577.50
Over/Under Est: 27.27% $2,067,632.50
Amt Left: 32.27% $2,353,926.65
Delta: -18.29% -$1,491,985.00
Subcontractor Percentage Amount
IBCTX, LLC 37.22% $2,744,562.17
PEACHTREE CONSTRUCTION, LTD. 7.23% $533,132.31
STRIPE-A-ZONE, LLC 6.23% $459,393.40
KING GEORGE TRAFFIC SOLUTIONS LLC 5.30% $390,816.22
MACIAS SPECIALTY CONTRACTING LLC 4.82% $355,421.54
O. TREVINO CONSTRUCTION, LLC 3.80% $280,207.85
ODUM SERVICES, LLC 3.27% $241,126.23
S & S BRIDGE PAINTING, INC. 2.10% $154,851.71
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.21% $89,224.08
TEXAS TRAFFIC AND BARRICADE, LLC 0.70% $51,617.24
DUSTROL, INC. 0.30% $22,121.67
ACT SAW CUTTING & REMOVAL 0.25% $18,434.73
WEST TEXAS ROCK RESOURCES, LLC 0.09% $6,636.50
BRENDA PRICE TRUCKING, INC. 0.05% $3,686.95
Total: 72.57% $5,351,232.60

Bid Items & Bid Tabulations

76 Total 0 of 76
DALLAS  |  IH 45  |  DALLAS  |  0092-02-135  |  01/04/2024  |  $7,580,945.00  |  F 2B23(093)  |  FDCR, FLEX PAV REP, & BRIDGE SCOUR R...  |  189 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
RAGLE CONSTRUCTION, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
AC 0.630 $100,000.000 $288,000.000 $1,000,000.000 $1,250,000.000
REMOVING CONC (RIPRAP)
SY 14.000 $10.000 $455.000 $68.000 $100.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,850.000 $25.000 $43.000 $16.000 $45.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 311.000 $50.000 $110.000 $130.000 $100.000
COMPOST MANUF TOPSOIL (4")
SY 718.000 $5.000 $2.750 $2.500 $20.000
BLOCK SODDING
SY 718.000 $8.000 $5.500 $12.500 $20.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 718.000 $0.500 $1.650 $1.500 $20.000
VEGETATIVE WATERING
MG 214.000 $15.000 $275.000 $67.000 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 4,005.000 $85.000 $114.900 $86.000 $80.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 500.000 $140.000 $187.000 $152.000 $125.000
FULL - DEPTH REPAIR CRCP (8")
SY 120.000 $350.000 $363.000 $230.000 $400.000
FULL - DEPTH REPAIR CRCP (12")
SY 200.000 $420.000 $462.000 $420.000 $650.000
FULL - DEPTH REPAIR CRCP (14")
SY 250.000 $500.000 $568.700 $517.000 $750.000
FLOWABLE BACKFILL
CY 19.700 $375.000 $1,035.000 $750.000 $450.000
CL C CONC (ABUT)(HPC)(EXTEND)
CY 3.400 $3,000.000 $16,650.000 $7,000.000 $5,000.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 256.000 $100.000 $170.500 $125.000 $300.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 653.000 $200.000 $176.000 $100.000 $300.000
PNEUMATICALLY PLACED CONC (REPAIR)
CF 146.000 $300.000 $654.500 $225.000 $450.000
RIPRAP (CONC)(4 IN)
CY 5.000 $650.000 $6,200.000 $3,000.000 $650.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 110.000 $225.000 $225.500 $206.000 $185.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 12,864.000 $200.000 $225.500 $208.000 $285.000
RIPRAP (CONC)(FLUME)
CY 3.000 $3,000.000 $7,000.000 $1,850.000 $850.000
RIPRAP (MOW STRIP)(4 IN)
CY 206.000 $800.000 $840.000 $750.000 $550.000
CLEANING AND SEALING EXISTING JOINTS
LF 32.000 $50.000 $36.300 $29.000 $100.000
CLEANING AND SEALING JOINTS (CL 7)
LF 5,160.500 $35.000 $36.300 $29.000 $85.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 2,230.000 $15.000 $37.000 $20.000 $25.000
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
LS 1.000 $500,000.000 $170,016.000 $500,000.000 $325,000.000
RAISING EXIST STRUCT
LS 1.000 $200,000.000 $48,000.000 $500,000.000 $150,000.000
REMOV STR (DRAINAGE FLUME)
EA 1.000 $5,000.000 $2,500.000 $810.000 $5,000.000
ADJUST STL SHOES
EA 8.000 $5,000.000 $14,250.000 $8,000.000 $8,500.000
MOBILIZATION
LS 1.000 $689,177.000 $704,000.000 $810,000.000 $900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $75,000.000 $16,400.000 $51,600.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 700.000 $45.000 $68.200 $62.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 700.000 $15.000 $9.900 $9.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 154.000 $60.000 $31.350 $28.500 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 154.000 $20.000 $11.000 $10.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $3.500 $3.300 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.000 $0.940 $0.850 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,000.000 $4.250 $4.950 $4.500 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,000.000 $1.250 $1.100 $0.900 $9.000
RUMBLE STRIPS (SHOULDER)
LF 6,600.000 $3.000 $1.050 $0.700 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,750.000 $30.000 $28.600 $18.480 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 25.000 $3,500.000 $2,007.500 $2,250.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $3,000.000 $1,622.500 $1,044.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 4,750.000 $5.000 $5.500 $2.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $1,000.000 $220.000 $400.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $4,200.000 $3,135.000 $2,716.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $2,500.000 $275.000 $400.000 $1,850.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 16.000 $1,000.000 $1,155.000 $915.000 $1,500.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 15.000 $1,000.000 $1,705.000 $2,250.000 $2,500.000
PAVEMENT SEALER 6"
LF 210,000.000 $0.100 $0.410 $0.240 $1.000
PAVEMENT SEALER (ENTR GORE)
EA 16.000 $200.000 $330.000 $375.000 $500.000
PAVEMENT SEALER (EXIT GORE)
EA 15.000 $200.000 $440.000 $500.000 $650.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 42,000.000 $1.000 $0.700 $0.690 $2.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 84,000.000 $1.000 $0.690 $0.690 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 84,000.000 $1.000 $0.690 $0.690 $1.000
REFL PAV MRKR TY II-C-R
EA 2,100.000 $5.000 $6.330 $4.110 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 210,000.000 $0.500 $0.830 $0.290 $1.000
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 16.000 $350.000 $440.000 $250.000 $650.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 15.000 $350.000 $605.000 $425.000 $1,500.000
PAV SURF PREP FOR MRK (6")
LF 210,000.000 $0.100 $0.060 $0.180 $0.500
PAV SURF PREP FOR MRK (ENTR GORE)
EA 16.000 $100.000 $110.000 $150.000 $10.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 15.000 $100.000 $110.000 $235.000 $10.000
CLEANING / SWEEPING (HANDWORK)
SY 21.000 $25.000 $200.000 $100.000 $500.000
BRUSH REMOVAL
MI 1.000 $2,000.000 $6,500.000 $4,500.000 $30,000.000
REP METAL POST W/ BASE PLATE(T4(S)RAIL)
EA 1.000 $50.000 $1,500.000 $2,900.000 $5,000.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 48.000 $500.000 $1,000.000 $850.000 $500.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 674.000 $50.000 $60.500 $50.000 $100.000
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 92.000 $75.000 $44.000 $50.000 $100.000
REP STL BRDG MEMB (ANCHOR BOLT NUT)
EA 5.000 $500.000 $100.000 $300.000 $5,000.000
REP STL BRIDGE MEMBER (WELD REPAIR)
LF 30.000 $600.000 $305.000 $230.000 $500.000
BRIDGE JOINT REPAIR (ARMOR)
LF 12.000 $600.000 $1,375.000 $1,125.000 $1,500.000
REPLACE NUTS, WASHERS & OTHER HARDWARE
EA 3.000 $50.000 $500.000 $325.000 $1,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $25,000.000 $25,700.000 $75,000.000 $16,500.000
TMA (STATIONARY)
DAY 378.000 $400.000 $150.000 $210.000 $250.000
TMA (MOBILE OPERATION)
DAY 189.000 $400.000 $50.000 $205.000 $550.000
Totals: $7,580,945.000 $7,294,650.850 $8,156,592.500 $9,648,577.500