Bid Cobra

DALLAS IH 45 (0092-02-135)

Items: 78

County: DALLAS
Length: N/A
Highway: IH 45
District: DALLAS
Control Number: 0092-02-135
DBE Goal: N/A
Project: F 2B23(093)
Guaranty: N/A
Time: 189 WORKING DAYS
Engineer's Estimate: $8,541,987.00
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: FDCR, FLEX PAV REP, & BRIDGE SCOUR REP
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$8,541,987.00
Over/Under Est: 98.81% $8,440,620.08
Over/Under Est: 113.25% $9,673,547.44
Amt Left: 7.26% $1,232,927.36

Bid Items & Bid Tabulations

78 Total 0 of 78
DALLAS  |  IH 45  |  DALLAS  |  0092-02-135  |  08/03/2023  |  $8,541,987.00  |  F 2B23(093)  |  FDCR, FLEX PAV REP, & BRIDGE SCOUR R...  |  189 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
GIBSON & ASSOCIATES, INC.
PREPARING ROW
AC 0.630 $60,000.000 $1,000,000.000 $103,906.000
REMOVING CONC (RIPRAP)
SY 13.500 $10.000 $52.000 $455.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,850.000 $25.000 $22.000 $43.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 311.000 $50.000 $130.000 $96.760
COMPOST MANUF TOPSOIL (4")
SY 718.000 $5.000 $2.000 $9.790
BLOCK SODDING
SY 718.000 $8.000 $10.000 $7.380
DRILL SEED (TEMP)(WARM OR COOL)
SY 718.000 $0.500 $1.250 $2.660
VEGETATIVE WATERING
MG 214.000 $15.000 $70.000 $88.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 4,005.000 $85.000 $86.000 $109.940
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 500.000 $140.000 $152.000 $186.930
FULL - DEPTH REPAIR CRCP (8")
SY 360.000 $350.000 $229.000 $270.220
FULL - DEPTH REPAIR CRCP (12")
SY 525.000 $400.000 $332.000 $391.760
FULL - DEPTH REPAIR CRCP (14")
SY 3,600.000 $425.000 $332.000 $391.760
FLOWABLE BACKFILL
CY 19.700 $375.000 $515.000 $1,035.000
CL C CONC (ABUT)(HPC)(EXTEND)
CY 3.400 $3,000.000 $7,000.000 $17,000.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 276.000 $100.000 $120.000 $155.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 721.000 $200.000 $72.000 $275.000
PNEUMATICALLY PLACED CONC (REPAIR)
CF 146.000 $300.000 $210.000 $595.000
RIPRAP (CONC)(4 IN)
CY 4.300 $650.000 $3,500.000 $6,200.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 12,864.000 $180.000 $199.250 $198.240
RIPRAP (CONC)(FLUME)
CY 3.000 $3,000.000 $1,850.000 $7,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 206.000 $800.000 $700.000 $840.000
CLEANING AND SEALING EXISTING JOINTS
LF 32.000 $50.000 $15.000 $60.000
CLEANING AND SEALING JOINTS (CL 7)
LF 5,434.500 $35.000 $25.000 $48.000
STR STEEL (PLATE GIRDER)
LB 860.000 $5.000 $15.000 $37.000
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $200,000.000 $4,640,000.000 $6,505,319.760
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
LS 1.000 $50,000.000 $1,105,000.000 $1,416,000.000
RAISING EXIST STRUCT
LS 1.000 $200,000.000 $1,200,000.000 $48,000.000
REMOV STR (DRILL SHAFT)
EA 3.000 $2,000.000 $400.000 $2,360.000
REMOV STR (DRAINAGE FLUME)
EA 1.000 $5,000.000 $1,400.000 $2,500.000
ADJUST STL SHOES
EA 21.000 $5,000.000 $800.000 $9,600.000
MOBILIZATION
LS 1.000 $776,544.000 $1,700,000.000 $1,565,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $45,000.000 $128,000.000 $112,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 700.000 $45.000 $62.000 $87.670
ROCK FILTER DAMS (REMOVE)
LF 700.000 $15.000 $12.000 $47.200
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 154.000 $60.000 $28.500 $50.560
CONSTRUCTION EXITS (REMOVE)
SY 154.000 $20.000 $10.000 $35.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $3.500 $2.920 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.000 $0.900 $1.590
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,000.000 $4.250 $4.500 $4.720
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,000.000 $1.250 $0.900 $1.480
MTL W-BEAM GD FEN (TIM POST)
LF 4,750.000 $45.000 $16.480 $24.780
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 25.000 $3,500.000 $1,550.000 $2,242.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $3,000.000 $1,105.000 $1,239.000
REMOVE METAL BEAM GUARD FENCE
LF 4,750.000 $25.000 $3.130 $2.950
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $1,000.000 $355.000 $177.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $4,200.000 $2,320.000 $3,333.500
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $2,500.000 $176.220 $295.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 16.000 $1,000.000 $915.000 $1,003.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 15.000 $1,000.000 $2,250.000 $1,829.000
PAVEMENT SEALER 6"
LF 210,000.000 $0.100 $0.240 $0.210
PAVEMENT SEALER (ENTR GORE)
EA 16.000 $200.000 $375.000 $295.000
PAVEMENT SEALER (EXIT GORE)
EA 15.000 $200.000 $500.000 $590.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 42,000.000 $1.000 $0.710 $1.180
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 84,000.000 $1.000 $0.710 $1.180
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 84,000.000 $1.000 $0.710 $1.180
REFL PAV MRKR TY II-C-R
EA 2,100.000 $5.000 $4.110 $5.130
ELIM EXT PAV MRK & MRKS (4")
LF 210,000.000 $0.500 $0.350 $0.890
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 16.000 $350.000 $250.000 $590.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 15.000 $350.000 $425.000 $885.000
PAV SURF PREP FOR MRK (6")
LF 210,000.000 $0.100 $0.180 $0.090
PAV SURF PREP FOR MRK (ENTR GORE)
EA 15.000 $100.000 $150.000 $118.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 16.000 $100.000 $235.000 $236.000
BRUSH REMOVAL
MI 1.000 $2,000.000 $10,000.000 $6,500.000
REP METAL POST W/ BASE PLATE(T4(S)RAIL)
EA 1.000 $50.000 $2,900.000 $1,500.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 57.000 $500.000 $2,100.000 $1,000.000
CONCRETE POST REPAIR
EA 3.000 $2,500.000 $4,000.000 $500.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 674.000 $50.000 $55.000 $45.000
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 92.000 $75.000 $35.000 $30.000
REP STL BRDG MEMB (ANCHOR BOLT NUT)
EA 9.000 $500.000 $300.000 $100.000
REP STL BRIDGE MEMBER (WELD REPAIR)
LF 30.000 $600.000 $300.000 $305.000
BRIDGE JOINT REPAIR (ARMOR)
LF 12.000 $600.000 $1,000.000 $1,375.000
DRILLED HOLES
LF 2.000 $200.000 $1,500.000 $2,000.000
REPLACE NUTS, WASHERS & OTHER HARDWARE
EA 3.000 $50.000 $70.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $75,000.000 $32,500.000
TMA (STATIONARY)
DAY 378.000 $400.000 $400.000 $300.000
TMA (MOBILE OPERATION)
DAY 189.000 $400.000 $600.000 $50.000
DEBRIS REMOVAL (BRIDGE STRUCTURE)
CY 7.000 $2,000.000 $1,000.000 $2,500.000
Totals: $8,541,987.000 $16,982,607.080 $18,215,534.440