PREPARING ROW
|
AC
|
0.630
|
$60,000.000
|
$1,000,000.000
|
$103,906.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
13.500
|
$10.000
|
$52.000
|
$455.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
1,850.000
|
$25.000
|
$22.000
|
$43.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
311.000
|
$50.000
|
$130.000
|
$96.760
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
718.000
|
$5.000
|
$2.000
|
$9.790
|
|
|
BLOCK SODDING
|
SY
|
718.000
|
$8.000
|
$10.000
|
$7.380
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
718.000
|
$0.500
|
$1.250
|
$2.660
|
|
|
VEGETATIVE WATERING
|
MG
|
214.000
|
$15.000
|
$70.000
|
$88.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
4,005.000
|
$85.000
|
$86.000
|
$109.940
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
500.000
|
$140.000
|
$152.000
|
$186.930
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
360.000
|
$350.000
|
$229.000
|
$270.220
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
SY
|
525.000
|
$400.000
|
$332.000
|
$391.760
|
|
|
FULL - DEPTH REPAIR CRCP (14")
|
SY
|
3,600.000
|
$425.000
|
$332.000
|
$391.760
|
|
|
FLOWABLE BACKFILL
|
CY
|
19.700
|
$375.000
|
$515.000
|
$1,035.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
3.400
|
$3,000.000
|
$7,000.000
|
$17,000.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
276.000
|
$100.000
|
$120.000
|
$155.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
721.000
|
$200.000
|
$72.000
|
$275.000
|
|
|
PNEUMATICALLY PLACED CONC (REPAIR)
|
CF
|
146.000
|
$300.000
|
$210.000
|
$595.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
4.300
|
$650.000
|
$3,500.000
|
$6,200.000
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
12,864.000
|
$180.000
|
$199.250
|
$198.240
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
3.000
|
$3,000.000
|
$1,850.000
|
$7,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
206.000
|
$800.000
|
$700.000
|
$840.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
32.000
|
$50.000
|
$15.000
|
$60.000
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
5,434.500
|
$35.000
|
$25.000
|
$48.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
860.000
|
$5.000
|
$15.000
|
$37.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$200,000.000
|
$4,640,000.000
|
$6,505,319.760
|
|
|
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
|
LS
|
1.000
|
$50,000.000
|
$1,105,000.000
|
$1,416,000.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$200,000.000
|
$1,200,000.000
|
$48,000.000
|
|
|
REMOV STR (DRILL SHAFT)
|
EA
|
3.000
|
$2,000.000
|
$400.000
|
$2,360.000
|
|
|
REMOV STR (DRAINAGE FLUME)
|
EA
|
1.000
|
$5,000.000
|
$1,400.000
|
$2,500.000
|
|
|
ADJUST STL SHOES
|
EA
|
21.000
|
$5,000.000
|
$800.000
|
$9,600.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$776,544.000
|
$1,700,000.000
|
$1,565,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$45,000.000
|
$128,000.000
|
$112,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
700.000
|
$45.000
|
$62.000
|
$87.670
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
700.000
|
$15.000
|
$12.000
|
$47.200
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
154.000
|
$60.000
|
$28.500
|
$50.560
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
154.000
|
$20.000
|
$10.000
|
$35.400
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$3.500
|
$2.920
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$0.900
|
$1.590
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$4.250
|
$4.500
|
$4.720
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$1.250
|
$0.900
|
$1.480
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,750.000
|
$45.000
|
$16.480
|
$24.780
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
25.000
|
$3,500.000
|
$1,550.000
|
$2,242.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$3,000.000
|
$1,105.000
|
$1,239.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,750.000
|
$25.000
|
$3.130
|
$2.950
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$1,000.000
|
$355.000
|
$177.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$4,200.000
|
$2,320.000
|
$3,333.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$2,500.000
|
$176.220
|
$295.000
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
16.000
|
$1,000.000
|
$915.000
|
$1,003.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
15.000
|
$1,000.000
|
$2,250.000
|
$1,829.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
210,000.000
|
$0.100
|
$0.240
|
$0.210
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
16.000
|
$200.000
|
$375.000
|
$295.000
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
15.000
|
$200.000
|
$500.000
|
$590.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
42,000.000
|
$1.000
|
$0.710
|
$1.180
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
84,000.000
|
$1.000
|
$0.710
|
$1.180
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
84,000.000
|
$1.000
|
$0.710
|
$1.180
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,100.000
|
$5.000
|
$4.110
|
$5.130
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
210,000.000
|
$0.500
|
$0.350
|
$0.890
|
|
|
ELIM EXT PAV MRK & MRKS (ENTR GORE)
|
EA
|
16.000
|
$350.000
|
$250.000
|
$590.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
15.000
|
$350.000
|
$425.000
|
$885.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
210,000.000
|
$0.100
|
$0.180
|
$0.090
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
15.000
|
$100.000
|
$150.000
|
$118.000
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
16.000
|
$100.000
|
$235.000
|
$236.000
|
|
|
BRUSH REMOVAL
|
MI
|
1.000
|
$2,000.000
|
$10,000.000
|
$6,500.000
|
|
|
REP METAL POST W/ BASE PLATE(T4(S)RAIL)
|
EA
|
1.000
|
$50.000
|
$2,900.000
|
$1,500.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
57.000
|
$500.000
|
$2,100.000
|
$1,000.000
|
|
|
CONCRETE POST REPAIR
|
EA
|
3.000
|
$2,500.000
|
$4,000.000
|
$500.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
674.000
|
$50.000
|
$55.000
|
$45.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
92.000
|
$75.000
|
$35.000
|
$30.000
|
|
|
REP STL BRDG MEMB (ANCHOR BOLT NUT)
|
EA
|
9.000
|
$500.000
|
$300.000
|
$100.000
|
|
|
REP STL BRIDGE MEMBER (WELD REPAIR)
|
LF
|
30.000
|
$600.000
|
$300.000
|
$305.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
12.000
|
$600.000
|
$1,000.000
|
$1,375.000
|
|
|
DRILLED HOLES
|
LF
|
2.000
|
$200.000
|
$1,500.000
|
$2,000.000
|
|
|
REPLACE NUTS, WASHERS & OTHER HARDWARE
|
EA
|
3.000
|
$50.000
|
$70.000
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$75,000.000
|
$32,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
378.000
|
$400.000
|
$400.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
189.000
|
$400.000
|
$600.000
|
$50.000
|
|
|
DEBRIS REMOVAL (BRIDGE STRUCTURE)
|
CY
|
7.000
|
$2,000.000
|
$1,000.000
|
$2,500.000
|
|
Totals: |
$8,541,987.000
|
$16,982,607.080
|
$18,215,534.440
|