Show Job Controls
Bid Cobra

DALLAS SH 342 (0048-01-069)

Items: 76

County: DALLAS
Length: N/A
Highway: SH 342
District: DALLAS
Control Number: 0048-01-069
DBE Goal: N/A
Project: F 2023(983)
Guaranty: N/A
Time: 236 WORKING DAYS
Engineer's Estimate: $8,772,969.51
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$8,772,969.51
$7,856,752.26
Over/Under Est: -10.44% -$916,217.25
$8,820,154.50
Over/Under Est: 0.54% $47,184.99
Amt Left: 12.26% $963,402.24
Over/Under Est: 10.33% $906,652.51
Amt Left: 23.2% $1,822,869.76
Delta: -9.74% -$859,467.52
Over/Under Est: 13.85% $1,214,784.12
Amt Left: 27.12% $2,131,001.37
Delta: -3.18% -$308,131.61
$10,573,185.50
Over/Under Est: 20.52% $1,800,215.99
Amt Left: 34.57% $2,716,433.24
Delta: -5.86% -$585,431.87
Subcontractor Percentage Amount
LOLLAR CONSTRUCTION GROUP LLC 29.75% $2,457,601.99
FORTSON CONTRACTING, INC. 1.14% $94,173.66
IBCTX, LLC 1.08% $89,217.15
JB PINNACLE GROUP, LLC 1.05% $86,738.89
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.69% $56,999.84
REDHAWK EARTHWORKS, LLC 0.65% $53,695.51
LINEAR TRAFFIC MARKINGS LLC 0.52% $42,956.40
WEST TEXAS ROCK RESOURCES, LLC 0.43% $35,521.64
UNITED CONCRETE CUTTING LLC 0.24% $19,826.03
LEGACY CUTTING, LLC 0.24% $19,826.03
TEXAS TRAFFIC AND BARRICADE, LLC 0.19% $15,695.61
AMERICAN CONCRETE TRUCKING, LLC 0.10% $8,260.85
Total: 36.08% $2,980,513.60

Bid Items & Bid Tabulations

76 Total 0 of 76
DALLAS  |  SH 342  |  DALLAS  |  0048-01-069  |  06/27/2023  |  $8,772,969.51  |  F 2023(983)  |  REHAB EXIST ROADWAY  |  236 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
FNH CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
RAGLE CONSTRUCTION, INC.
TEXAS-REYES GROUP LTD.
REMOVING CONC (RIPRAP)
SY 1,780.000 $15.000 $15.000 $50.000 $11.000 $11.600 $13.000
REMOVING CONC (CTB)
LF 1,304.000 $35.000 $25.000 $65.000 $22.000 $50.000 $19.000
REMOVING CONC (RETAINING WALLS)
SY 3,739.000 $100.000 $20.000 $50.000 $150.000 $22.500 $133.000
REMOVE CONC (WINGWALL)
CY 18.000 $110.000 $100.000 $500.000 $500.000 $200.000 $900.000
REMOVING CONC (APPR SLAB)
SY 271.000 $35.000 $40.000 $500.000 $20.000 $30.000 $61.000
REMOVING CONCRETE(MOW STRIP)
LF 2,060.000 $25.000 $10.000 $20.000 $8.000 $4.500 $10.500
EXCAVATION (ROADWAY)
CY 10,279.000 $30.000 $30.000 $20.000 $50.000 $177.000 $27.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 1,097.000 $20.000 $80.000 $35.000 $50.000 $38.000 $45.000
COMPOST MANUF TOPSOIL (4")
SY 1,935.000 $6.000 $10.000 $10.000 $14.000 $2.650 $7.500
BLOCK SODDING
SY 1,935.000 $10.000 $6.000 $10.000 $6.000 $11.000 $5.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 1,935.000 $0.350 $0.100 $1.000 $1.750 $1.400 $2.000
VEGETATIVE WATERING
MG 576.000 $100.000 $1.000 $25.000 $40.000 $58.000 $57.500
LIME (HYDRATED LIME (SLURRY))
TON 37.000 $500.000 $400.000 $350.000 $450.000 $293.000 $545.500
LIME TRT (EXST MATL)(8")
SY 3,034.000 $11.000 $20.000 $12.000 $10.000 $5.000 $11.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,200.000 $105.000 $120.000 $120.000 $100.000 $76.550 $138.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 72,566.000 $5.000 $3.000 $6.000 $3.000 $1.550 $2.500
TEMPORARY SPL SHORING
SF 1,400.000 $40.000 $50.000 $85.000 $60.000 $75.000 $27.500
APPROACH SLAB
CY 97.000 $1,000.000 $1,000.000 $2,500.000 $800.000 $605.000 $990.000
RETAINING WALL (MSE)
SF 33,638.000 $90.000 $70.000 $85.000 $123.250 $91.800 $140.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 175.000 $242.000 $150.000 $500.000 $300.000 $224.000 $467.000
RIPRAP (CONC)(4 IN)
CY 62.000 $550.000 $1,500.000 $550.000 $900.000 $645.000 $1,450.500
RIPRAP (STONE PROTECTION)(18 IN)
CY 445.000 $156.000 $210.000 $185.000 $240.000 $240.000 $244.500
RIPRAP (MOW STRIP)(4 IN)
CY 125.000 $675.000 $1,000.000 $550.000 $900.000 $540.000 $1,059.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 275.000 $35.000 $50.000 $100.000 $40.000 $41.000 $200.000
RAIL (TY T551)
LF 1,331.000 $100.000 $233.000 $150.000 $75.000 $115.000 $93.000
RETROFIT RAIL (TY T221)
LF 610.000 $168.000 $300.000 $185.000 $200.000 $195.000 $503.500
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 90.000 $180.000 $120.000 $350.000 $250.000 $221.650 $430.500
RC PIPE (CL IV)(12 IN)
LF 50.000 $90.000 $170.000 $200.000 $240.000 $65.000 $186.500
RC PIPE (CL IV)(18 IN)
LF 310.000 $110.000 $110.000 $200.000 $150.000 $75.000 $154.500
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 3.000 $7,200.000 $10,000.000 $12,500.000 $4,000.000 $3,950.000 $7,342.500
INLET (COMPL)(RWI)(TY I)
EA 2.000 $6,500.000 $10,000.000 $12,500.000 $7,000.000 $4,825.000 $9,030.500
INLET (COMPL)(RWI)(TY II)
EA 1.000 $7,300.000 $10,000.000 $12,500.000 $11,000.000 $4,825.000 $11,326.500
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 1.000 $6,500.000 $2,000.000 $1,850.000 $1,000.000 $1,390.000 $2,311.500
MOBILIZATION
LS 1.000 $831,015.410 $750,000.000 $900,000.000 $964,000.000 $980,000.000 $989,515.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $15,000.000 $50,000.000 $12,500.000 $21,000.000 $70,000.000 $4,343.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 120.000 $60.000 $1.000 $30.000 $73.500 $90.000 $93.500
ROCK FILTER DAMS (REMOVE)
LF 120.000 $20.000 $1.000 $15.000 $35.000 $20.000 $36.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 328.000 $40.000 $1.000 $30.000 $12.600 $50.000 $10.500
CONSTRUCTION EXITS (REMOVE)
SY 328.000 $20.000 $1.000 $20.000 $6.000 $10.000 $10.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $3.000 $1.000 $4.000 $3.150 $6.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,000.000 $1.100 $1.000 $2.000 $0.500 $1.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,000.000 $4.750 $1.000 $18.000 $4.200 $8.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,000.000 $0.500 $1.000 $9.000 $1.500 $1.000 $1.500
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 1,000.000 $12.000 $1.000 $8.000 $3.150 $15.000 $23.500
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 32,898.000 $0.500 $0.200 $0.500 $0.170 $0.160 $0.250
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 16,449.000 $0.500 $0.200 $0.500 $0.170 $0.160 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 1,960.000 $18.000 $40.000 $35.000 $21.530 $20.500 $18.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,200.000 $3,000.000 $1,850.000 $2,850.010 $1,775.000 $1,736.000
SHORT RADIUS
LF 100.000 $300.000 $23.000 $35.000 $23.630 $22.500 $42.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $4,000.000 $1,000.000 $1,850.000 $1,050.000 $1,000.000 $1,177.000
REMOVE METAL BEAM GUARD FENCE
LF 2,060.000 $4.000 $2.500 $3.000 $2.630 $2.500 $1.500
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $300.000 $125.000 $500.000 $131.250 $125.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,700.000 $2,500.000 $3,250.000 $2,913.750 $2,775.000 $2,843.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $3,500.000 $250.000 $850.000 $262.500 $250.000 $400.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 21.000 $30.000 $25.000 $100.000 $26.250 $25.000 $51.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,935.000 $1.000 $0.100 $6.000 $1.500 $2.360 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 3,210.000 $1.250 $0.100 $6.000 $1.500 $2.320 $2.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 1.000 $800.000 $2,500.000 $2,500.000 $1,312.500 $1,500.000 $2,760.000
REFL PAV MRK TY II (Y) 24" (SLD)
LF 53.000 $12.000 $15.000 $20.000 $7.880 $7.000 $16.500
PAVEMENT SEALER 6"
LF 1,400.000 $0.500 $0.200 $1.250 $1.050 $0.800 $0.250
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 32,898.000 $0.700 $0.720 $1.000 $0.790 $0.620 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,800.000 $0.500 $1.000 $1.250 $1.050 $1.000 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 24,000.000 $0.500 $0.720 $1.000 $0.790 $0.630 $1.000
REFL PAV MRKR TY II-A-A
EA 131.000 $4.750 $5.000 $6.000 $6.300 $4.000 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 1,400.000 $1.500 $0.700 $1.250 $1.050 $1.000 $1.000
PAV SURF PREP FOR MRK (6")
LF 1,400.000 $1.000 $0.050 $1.250 $1.050 $0.500 $0.100
FIBER REINFORCED POLYMER PATCHING MATLS
LB 2,000.000 $7.000 $3.000 $15.000 $16.000 $2.950 $22.000
TREE REMOVAL (4" - 12" DIA)
EA 2.000 $500.000 $500.000 $2,500.000 $2,500.000 $5,000.000 $1,500.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 14.000 $150.000 $130.000 $1,000.000 $200.000 $120.000 $481.000
SP MIXES SP-B SAC-B PG64-22
TON 1,010.000 $250.000 $160.000 $140.000 $140.000 $119.100 $135.000
SP MIXES SP-C SAC-B PG70-22
TON 8,781.000 $175.000 $164.000 $160.000 $145.000 $131.100 $140.000
TACK COAT
GAL 7,983.000 $5.000 $0.100 $6.000 $0.250 $6.000 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $30,000.000 $16,500.000 $10,000.000 $30,000.000 $2,289.000
TMA (STATIONARY)
DAY 472.000 $500.000 $1.000 $250.000 $76.120 $150.000 $395.000
TMA (MOBILE OPERATION)
DAY 236.000 $400.000 $1.000 $350.000 $156.160 $480.000 $1,425.500
REML & DISPL DRIFTWOOD & DEBRIS
CY 5.000 $100.000 $1,500.000 $1,000.000 $750.000 $218.000 $799.500
Totals: $8,772,969.510 $7,856,752.260 $8,820,154.500 $9,679,622.020 $9,987,753.630 $10,573,185.500