PREPARING ROW
|
STA
|
24.500
|
$10,000.000
|
$44,350.000
|
$22,237.000
|
$42,000.000
|
$42,000.000
|
$40,800.000
|
$44,000.000
|
$8,000.000
|
$56,800.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
868.000
|
$7.500
|
$8.750
|
$18.370
|
$12.000
|
$10.000
|
$20.000
|
$13.000
|
$7.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
23.000
|
$14.000
|
$18.500
|
$21.960
|
$100.000
|
$11.000
|
$50.000
|
$15.000
|
$27.000
|
$22.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
267.000
|
$14.000
|
$11.250
|
$12.900
|
$20.000
|
$7.000
|
$50.000
|
$13.500
|
$15.000
|
$15.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
477.000
|
$15.000
|
$4.500
|
$1.350
|
$10.000
|
$2.800
|
$10.000
|
$1.000
|
$4.000
|
$10.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
79.000
|
$20.000
|
$8.500
|
$4.780
|
$40.000
|
$5.500
|
$50.000
|
$20.000
|
$15.000
|
$18.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
530.000
|
$25.000
|
$31.500
|
$15.000
|
$35.000
|
$16.000
|
$50.000
|
$100.000
|
$10.000
|
$26.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
38.000
|
$9.500
|
$11.000
|
$31.890
|
$10.000
|
$13.000
|
$100.000
|
$25.000
|
$4.000
|
$21.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
759.000
|
$14.000
|
$100.000
|
$22.090
|
$10.000
|
$4.000
|
$30.000
|
$28.000
|
$12.000
|
$16.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
820.000
|
$17.500
|
$50.000
|
$24.360
|
$40.000
|
$15.000
|
$49.250
|
$42.000
|
$20.000
|
$50.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
1,948.000
|
$35.000
|
$47.500
|
$70.030
|
$75.000
|
$48.000
|
$49.250
|
$100.000
|
$20.000
|
$50.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
7,346.000
|
$8.500
|
$0.920
|
$6.210
|
$2.000
|
$3.000
|
$1.500
|
$1.500
|
$1.390
|
$4.100
|
|
|
BLOCK SODDING
|
SY
|
7,346.000
|
$3.750
|
$4.850
|
$3.920
|
$3.920
|
$4.200
|
$4.000
|
$4.500
|
$3.890
|
$4.150
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
7,346.000
|
$0.650
|
$0.280
|
$0.280
|
$0.280
|
$0.650
|
$0.200
|
$0.500
|
$0.100
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
2,186.000
|
$15.000
|
$10.000
|
$1.000
|
$6.000
|
$18.000
|
$10.000
|
$35.000
|
$6.500
|
$5.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
24.000
|
$250.000
|
$172.000
|
$172.000
|
$172.000
|
$145.000
|
$200.000
|
$200.000
|
$200.000
|
$175.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
1,149.000
|
$5.000
|
$6.300
|
$13.040
|
$9.000
|
$12.000
|
$16.000
|
$8.000
|
$5.000
|
$9.000
|
|
|
CONC PAV (JOINT REINF) (6")
|
SY
|
3,084.000
|
$65.000
|
$55.000
|
$72.760
|
$75.000
|
$50.000
|
$70.000
|
$58.000
|
$58.000
|
$73.500
|
|
|
CONC PAV (JOINT REINF) (8")
|
SY
|
187.000
|
$105.000
|
$62.000
|
$83.160
|
$68.020
|
$140.000
|
$80.000
|
$125.000
|
$67.000
|
$79.500
|
|
|
CEM STABIL BKFL
|
CY
|
1.000
|
$170.000
|
$500.000
|
$515.900
|
$250.000
|
$175.000
|
$750.000
|
$500.000
|
$300.000
|
$250.000
|
|
|
CUT & RESTORING PAV
|
SY
|
67.000
|
$160.000
|
$80.000
|
$142.520
|
$4.350
|
$120.000
|
$125.000
|
$125.000
|
$110.000
|
$265.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
132.000
|
$2.500
|
$1.000
|
$1.000
|
$10.870
|
$30.000
|
$2.000
|
$5.500
|
$1.000
|
$12.500
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
3.000
|
$35,000.000
|
$25,000.000
|
$5,000.000
|
$15,000.000
|
$16,000.000
|
$17,000.000
|
$5,000.000
|
$15,000.000
|
$15,750.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
226.000
|
$250.000
|
$115.000
|
$299.320
|
$500.000
|
$235.000
|
$300.000
|
$345.000
|
$700.000
|
$295.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
240.000
|
$400.000
|
$205.000
|
$390.520
|
$750.000
|
$464.000
|
$500.000
|
$550.000
|
$1,000.000
|
$555.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
155.000
|
$500.000
|
$235.000
|
$530.800
|
$1,000.000
|
$645.000
|
$750.000
|
$640.000
|
$2,300.000
|
$605.000
|
|
|
DRILL SHAFT (78 IN)
|
LF
|
46.000
|
$1,600.000
|
$485.000
|
$846.480
|
$2,000.000
|
$840.000
|
$1,000.000
|
$1,200.000
|
$2,000.000
|
$1,380.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
60.000
|
$290.000
|
$285.000
|
$210.000
|
$232.000
|
$225.000
|
$215.000
|
$264.000
|
$250.000
|
$243.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (24 IN)
|
LF
|
41.000
|
$250.000
|
$215.000
|
$190.000
|
$207.000
|
$205.000
|
$190.000
|
$242.000
|
$220.000
|
$220.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
50.000
|
$1,000.000
|
$750.000
|
$1,360.000
|
$1,000.000
|
$774.000
|
$1,000.000
|
$855.000
|
$2,000.000
|
$900.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
152.000
|
$1,000.000
|
$1,750.000
|
$2,945.950
|
$1,000.000
|
$1,250.000
|
$895.000
|
$1,200.000
|
$2,000.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
203.000
|
$1,000.000
|
$1,500.000
|
$1,726.290
|
$800.000
|
$980.000
|
$1,110.000
|
$980.000
|
$2,000.000
|
$1,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
12.000
|
$380.000
|
$465.000
|
$673.480
|
$557.290
|
$535.000
|
$700.000
|
$450.000
|
$2,000.000
|
$600.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
17,839.000
|
$22.000
|
$22.000
|
$47.320
|
$50.000
|
$24.000
|
$25.000
|
$20.000
|
$42.000
|
$36.500
|
|
|
REINF CONC SLAB (HPC)(ARCH)
|
SF
|
3,698.000
|
$335.000
|
$35.000
|
$62.860
|
$50.000
|
$34.000
|
$35.000
|
$53.000
|
$50.000
|
$52.500
|
|
|
RETAINING WALL (MSE)
|
SF
|
11,424.000
|
$75.000
|
$100.000
|
$56.950
|
$68.000
|
$37.500
|
$51.250
|
$48.000
|
$100.000
|
$60.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
325.000
|
$75.000
|
$70.000
|
$103.000
|
$75.000
|
$70.000
|
$75.500
|
$60.000
|
$100.000
|
$74.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
3,294.950
|
$150.000
|
$185.000
|
$150.000
|
$0.180
|
$150.000
|
$90.000
|
$105.000
|
$300.000
|
$130.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
47.700
|
$490.000
|
$495.000
|
$516.860
|
$477.160
|
$720.000
|
$425.000
|
$500.000
|
$470.000
|
$610.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
7.000
|
$415.000
|
$535.000
|
$749.820
|
$527.920
|
$750.000
|
$600.000
|
$1,000.000
|
$520.000
|
$700.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
19.000
|
$250.000
|
$200.000
|
$150.000
|
$210.760
|
$165.000
|
$150.000
|
$300.000
|
$150.000
|
$220.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
45.400
|
$550.000
|
$500.000
|
$560.870
|
$497.460
|
$675.000
|
$500.000
|
$620.000
|
$490.000
|
$655.000
|
|
|
ELASTOMERIC BEARING (LAMINATED)
|
EA
|
4.000
|
$3,500.000
|
$2,750.000
|
$8,082.200
|
$2,387.930
|
$3,750.000
|
$3,840.000
|
$5,400.000
|
$2,500.000
|
$4,750.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
2,158.000
|
$9.500
|
$10.500
|
$15.240
|
$10.140
|
$10.000
|
$15.000
|
$11.500
|
$8.000
|
$10.000
|
|
|
STR STEEL (ARCH)(GR 50)
|
LB
|
23,500.000
|
$10.500
|
$6.000
|
$7.930
|
$10.000
|
$7.000
|
$16.000
|
$17.130
|
$15.000
|
$16.250
|
|
|
STR STEEL (ARCH)(GR 50-T1)
|
LB
|
59,100.000
|
$10.500
|
$6.000
|
$7.930
|
$10.000
|
$10.600
|
$16.000
|
$17.130
|
$15.000
|
$16.250
|
|
|
STR STEEL (ARCH)(GR 50-F1)
|
LB
|
107,850.000
|
$10.500
|
$6.000
|
$7.930
|
$10.000
|
$8.000
|
$16.000
|
$17.130
|
$15.000
|
$16.250
|
|
|
RAIL (TY PR11)
|
LF
|
1,330.000
|
$115.000
|
$81.000
|
$81.000
|
$100.000
|
$77.000
|
$81.000
|
$90.000
|
$150.000
|
$84.000
|
|
|
RAIL (TY T80PP)
|
LF
|
156.000
|
$250.000
|
$195.000
|
$285.250
|
$266.880
|
$260.000
|
$71.000
|
$385.000
|
$400.000
|
$208.000
|
|
|
SEALED EXPANSION JNT (4IN)(SEJ-B)(MOD)
|
LF
|
171.000
|
$150.000
|
$85.000
|
$215.310
|
$132.380
|
$96.000
|
$112.000
|
$130.000
|
$200.000
|
$126.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
24.000
|
$95.000
|
$70.000
|
$148.160
|
$100.000
|
$72.000
|
$135.000
|
$117.000
|
$135.000
|
$27.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
69.000
|
$105.000
|
$60.000
|
$113.890
|
$100.000
|
$78.000
|
$145.000
|
$126.000
|
$145.000
|
$165.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
79.000
|
$115.000
|
$85.000
|
$116.480
|
$120.000
|
$110.000
|
$160.000
|
$141.000
|
$160.000
|
$165.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
103.000
|
$215.000
|
$165.000
|
$170.080
|
$300.000
|
$167.000
|
$255.000
|
$270.000
|
$255.000
|
$220.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
1.000
|
$6,000.000
|
$5,595.000
|
$8,914.040
|
$25,000.000
|
$5,900.000
|
$6,000.000
|
$6,600.000
|
$6,000.000
|
$8,700.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
2.000
|
$6,000.000
|
$6,250.000
|
$7,393.770
|
$8,000.000
|
$6,800.000
|
$5,000.000
|
$5,555.000
|
$5,000.000
|
$6,100.000
|
|
|
INLET (COMPL)(PAZD)(SL)(3FTX3FT)
|
EA
|
1.000
|
$4,700.000
|
$3,780.000
|
$5,715.290
|
$8,000.000
|
$5,800.000
|
$3,730.500
|
$5,384.500
|
$3,000.000
|
$4,300.000
|
|
|
INLET (COMPL)(TRENCH DRAIN)(24")
|
EA
|
2.000
|
$10,000.000
|
$7,275.000
|
$10,303.500
|
$2,500.000
|
$3,500.000
|
$10,000.000
|
$3,850.000
|
$10,000.000
|
$4,700.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$1,250.000
|
$450.000
|
$309.160
|
$2,500.000
|
$675.000
|
$800.000
|
$1,375.000
|
$800.000
|
$940.000
|
|
|
REMOV STR (PIPE)
|
LF
|
118.000
|
$20.000
|
$20.000
|
$48.540
|
$29.890
|
$17.000
|
$65.000
|
$38.500
|
$65.000
|
$31.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$950,000.000
|
$900,000.000
|
$956,533.000
|
$1,040,000.000
|
$1,054,000.000
|
$1,000,000.000
|
$345,000.000
|
$1,350,000.000
|
$1,390,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$10,000.000
|
$10,000.000
|
$44,151.000
|
$13,000.000
|
$22,000.000
|
$10,000.000
|
$40,000.000
|
$20,000.000
|
$18,900.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
50.000
|
$34.000
|
$38.000
|
$45.600
|
$52.000
|
$28.000
|
$50.000
|
$51.000
|
$45.000
|
$45.600
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
50.000
|
$12.000
|
$10.000
|
$13.940
|
$1.000
|
$26.000
|
$10.000
|
$16.000
|
$25.000
|
$8.600
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
502.000
|
$25.000
|
$16.000
|
$21.930
|
$25.000
|
$13.000
|
$22.000
|
$25.000
|
$20.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
502.000
|
$10.000
|
$9.250
|
$9.840
|
$1.000
|
$8.100
|
$10.000
|
$11.000
|
$6.500
|
$9.750
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,011.000
|
$3.000
|
$1.600
|
$2.140
|
$2.140
|
$1.900
|
$2.500
|
$3.000
|
$2.400
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,011.000
|
$1.000
|
$0.420
|
$0.580
|
$0.580
|
$0.720
|
$0.500
|
$1.000
|
$0.550
|
$0.440
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,849.000
|
$6.500
|
$4.250
|
$5.040
|
$5.040
|
$3.500
|
$6.000
|
$6.000
|
$5.250
|
$5.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,849.000
|
$1.500
|
$1.000
|
$0.720
|
$0.720
|
$0.720
|
$1.000
|
$1.000
|
$0.600
|
$1.050
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,380.000
|
$27.000
|
$30.000
|
$4.940
|
$17.000
|
$27.500
|
$35.000
|
$45.000
|
$62.000
|
$35.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,280.000
|
$13.000
|
$6.500
|
$8.060
|
$10.500
|
$2.500
|
$10.000
|
$23.000
|
$10.000
|
$6.500
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,380.000
|
$17.000
|
$8.500
|
$7.080
|
$1.000
|
$9.500
|
$10.000
|
$19.000
|
$15.000
|
$9.800
|
|
|
PERM CTB TYPE STR (S) SPECIAL
|
LF
|
430.000
|
$350.000
|
$115.000
|
$257.130
|
$150.000
|
$285.000
|
$250.000
|
$210.000
|
$100.000
|
$225.000
|
|
|
PERM CTB TYPE STB (S1) SPECIAL
|
LF
|
100.000
|
$500.000
|
$210.000
|
$152.130
|
$114.620
|
$170.000
|
$250.000
|
$190.000
|
$100.000
|
$180.250
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
969.000
|
$7.000
|
$6.000
|
$1.620
|
$8.120
|
$4.200
|
$5.000
|
$2.000
|
$8.000
|
$8.800
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
177.000
|
$50.000
|
$23.000
|
$32.000
|
$32.490
|
$31.000
|
$45.000
|
$45.000
|
$32.000
|
$35.200
|
|
|
CONC CURB (DOWEL)
|
LF
|
60.000
|
$15.000
|
$16.000
|
$20.560
|
$19.290
|
$8.000
|
$30.000
|
$10.000
|
$19.000
|
$21.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
347.000
|
$95.000
|
$50.000
|
$60.000
|
$60.910
|
$72.000
|
$85.000
|
$75.000
|
$60.000
|
$73.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
3.000
|
$2,400.000
|
$1,275.000
|
$2,500.000
|
$2,538.070
|
$1,600.000
|
$1,800.000
|
$2,300.000
|
$2,500.000
|
$2,800.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$2,900.000
|
$1,500.000
|
$3,874.000
|
$3,933.000
|
$1,600.000
|
$2,000.000
|
$2,750.000
|
$3,874.000
|
$4,300.000
|
|
|
CONC SIDEWALK (SPECIAL)(RETAINING WALL)
|
SF
|
156.000
|
$155.000
|
$40.000
|
$124.000
|
$130.000
|
$65.000
|
$90.000
|
$50.000
|
$124.000
|
$146.000
|
|
|
CONC MEDIAN
|
SY
|
28.000
|
$90.000
|
$70.000
|
$106.000
|
$107.610
|
$165.000
|
$160.000
|
$150.000
|
$106.000
|
$131.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,100.000
|
$1,300.000
|
$1,647.040
|
$1,300.000
|
$825.000
|
$800.000
|
$2,200.000
|
$3,000.000
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$600.000
|
$750.000
|
$534.320
|
$750.000
|
$525.000
|
$500.000
|
$1,200.000
|
$3,000.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$23,000.000
|
$7,375.000
|
$2,609.980
|
$7,375.000
|
$7,600.000
|
$7,000.000
|
$8,500.000
|
$6,250.000
|
$10,000.000
|
|
|
RELOCATE RD IL ASM (SHOE-BASE)
|
EA
|
5.000
|
$3,500.000
|
$1,850.000
|
$2,300.000
|
$1,800.000
|
$2,400.000
|
$2,300.000
|
$1,430.000
|
$2,300.000
|
$2,700.000
|
|
|
IN RD IL (TY SA) 20S-4 (150W EQ) LED
|
EA
|
5.000
|
$2,500.000
|
$3,980.000
|
$3,200.000
|
$2,770.000
|
$3,300.000
|
$3,200.000
|
$3,465.000
|
$3,200.000
|
$3,700.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
455.000
|
$11.500
|
$7.890
|
$8.500
|
$15.750
|
$9.000
|
$10.000
|
$11.000
|
$8.500
|
$9.900
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
70.000
|
$38.000
|
$22.450
|
$22.000
|
$58.000
|
$23.000
|
$25.000
|
$38.500
|
$22.000
|
$25.500
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
1,725.000
|
$17.500
|
$15.780
|
$10.000
|
$19.750
|
$11.000
|
$12.000
|
$16.500
|
$10.000
|
$11.600
|
|
|
CONDT (RM) (2")
|
LF
|
165.000
|
$86.000
|
$29.870
|
$40.000
|
$40.500
|
$41.000
|
$35.000
|
$21.000
|
$40.000
|
$46.500
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
680.000
|
$1.600
|
$1.500
|
$1.050
|
$1.550
|
$1.100
|
$1.100
|
$1.550
|
$1.050
|
$1.250
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,210.000
|
$1.750
|
$1.390
|
$1.240
|
$1.700
|
$1.300
|
$1.250
|
$1.550
|
$1.240
|
$1.450
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
95.000
|
$1.850
|
$1.560
|
$1.500
|
$1.800
|
$1.550
|
$2.000
|
$1.700
|
$15.000
|
$1.750
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
285.000
|
$2.000
|
$1.500
|
$2.000
|
$2.000
|
$2.050
|
$3.000
|
$1.700
|
$2.000
|
$2.350
|
|
|
GROUND BOX TY A (122311)
|
EA
|
2.000
|
$650.000
|
$950.000
|
$580.000
|
$880.000
|
$590.000
|
$750.000
|
$770.000
|
$580.000
|
$671.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
11.000
|
$1,075.000
|
$985.000
|
$1,055.000
|
$1,450.000
|
$1,100.000
|
$1,075.000
|
$1,045.000
|
$1,055.000
|
$1,220.000
|
|
|
ELC SRV TY A 240/480 060(NS)AL(E)PS(U)
|
EA
|
1.000
|
$6,500.000
|
$7,000.000
|
$6,500.000
|
$7,950.000
|
$6,600.000
|
$9,500.000
|
$7,150.000
|
$6,500.000
|
$7,550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$500.000
|
$688.000
|
$465.000
|
$990.000
|
$480.000
|
$500.000
|
$1,000.000
|
$465.000
|
$490.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$550.000
|
$729.000
|
$540.000
|
$1,235.000
|
$550.000
|
$550.000
|
$2,500.000
|
$540.000
|
$570.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$2,500.000
|
$2,055.870
|
$1,950.000
|
$3,365.000
|
$2,000.000
|
$3,000.000
|
$3,500.000
|
$1,950.000
|
$2,100.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
200.000
|
$1.000
|
$4.000
|
$2.000
|
$1.000
|
$6.100
|
$5.000
|
$5.500
|
$4.000
|
$4.200
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
36.000
|
$1.000
|
$3.000
|
$2.000
|
$3.000
|
$1.250
|
$2.000
|
$1.500
|
$3.000
|
$3.150
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
5,674.000
|
$0.150
|
$1.000
|
$0.890
|
$1.000
|
$0.450
|
$0.500
|
$0.400
|
$1.000
|
$1.050
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
17.000
|
$2.500
|
$5.000
|
$5.000
|
$3.000
|
$3.700
|
$8.000
|
$3.300
|
$5.000
|
$5.250
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
2,837.000
|
$0.150
|
$1.000
|
$0.920
|
$1.000
|
$0.450
|
$0.500
|
$0.400
|
$1.000
|
$1.050
|
|
|
PAVEMENT SEALER 4"
|
LF
|
8,511.000
|
$0.250
|
$0.500
|
$0.390
|
$0.500
|
$0.200
|
$0.500
|
$0.200
|
$0.500
|
$0.530
|
|
|
PAVEMENT SEALER 6"
|
LF
|
36.000
|
$0.400
|
$0.750
|
$0.600
|
$0.500
|
$0.250
|
$1.000
|
$0.250
|
$0.750
|
$0.790
|
|
|
PAVEMENT SEALER 24"
|
LF
|
17.000
|
$2.250
|
$1.000
|
$1.000
|
$3.000
|
$3.050
|
$4.000
|
$3.000
|
$1.000
|
$1.050
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
81.000
|
$22.000
|
$12.500
|
$14.000
|
$20.000
|
$22.000
|
$25.000
|
$19.800
|
$12.500
|
$13.200
|
|
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)LG
|
EA
|
2.000
|
$350.000
|
$275.000
|
$275.000
|
$400.000
|
$250.000
|
$250.000
|
$220.000
|
$275.000
|
$290.000
|
|
PREFAB PAV MRK TY C (W)(WORD)CNTST
|
EA
|
6.000
|
$1,000.000
|
$275.000
|
$320.000
|
$900.000
|
$310.000
|
$275.000
|
$280.000
|
$275.000
|
$290.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
8,511.000
|
$0.150
|
$0.200
|
$0.200
|
$0.500
|
$0.380
|
$0.300
|
$0.400
|
$0.200
|
$0.210
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
36.000
|
$0.500
|
$0.300
|
$0.750
|
$0.500
|
$0.550
|
$1.000
|
$0.500
|
$0.300
|
$0.320
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
98.000
|
$1.250
|
$0.750
|
$1.000
|
$1.000
|
$3.050
|
$2.500
|
$3.000
|
$0.750
|
$0.790
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$29.000
|
$10.000
|
$10.000
|
$15.000
|
$44.000
|
$35.000
|
$39.000
|
$10.000
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (ACC PRK)(LRG)
|
EA
|
2.000
|
$5.000
|
$10.000
|
$30.000
|
$15.000
|
$55.000
|
$45.000
|
$50.000
|
$10.000
|
$10.500
|
|
|
SPOT MOWING
|
AC
|
8.000
|
$100.000
|
$200.000
|
$783.060
|
$128.000
|
$400.000
|
$500.000
|
$250.000
|
$200.000
|
$165.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
21,036.000
|
$2.250
|
$0.790
|
$0.790
|
$0.380
|
$0.900
|
$1.000
|
$1.100
|
$0.790
|
$0.850
|
|
|
NO. OF WORKING DAYS
|
$/D
|
2,500.000
|
$457.000
|
$390.000
|
$338.000
|
$365.000
|
$450.000
|
$338.000
|
$457.000
|
$395.000
|
$457.000
|
|
|
ORNAMENTAL STL FEN (REMOVE)
|
LF
|
625.000
|
$32.000
|
$12.000
|
$19.820
|
$5.090
|
$6.500
|
$15.000
|
$15.000
|
$20.000
|
$5.250
|
|
|
ORNAMENTAL STL FEN (INSTALL)
|
LF
|
217.000
|
$175.000
|
$75.000
|
$215.000
|
$140.000
|
$20.000
|
$100.000
|
$148.000
|
$62.220
|
$66.000
|
|
|
TIP TESTING OF DRILLED SHAFTS
|
EA
|
12.000
|
$7,000.000
|
$2,500.000
|
$1,916.670
|
$1,916.670
|
$2,250.000
|
$2,000.000
|
$3,500.000
|
$1,200.000
|
$2,100.000
|
|
|
CABLE HANGERS
|
LS
|
1.000
|
$382,570.000
|
$200,000.000
|
$157,000.000
|
$250,000.000
|
$1,165,000.000
|
$335,000.000
|
$300,000.000
|
$500,000.000
|
$178,000.000
|
|
|
RAIL (PED)(LOW)
|
LF
|
1,693.000
|
$275.000
|
$300.000
|
$326.530
|
$300.000
|
$345.000
|
$326.000
|
$359.000
|
$250.000
|
$425.000
|
|
|
RAIL (PED)(HIGH)
|
LF
|
1,144.200
|
$325.000
|
$550.000
|
$658.000
|
$730.000
|
$695.000
|
$650.000
|
$724.000
|
$325.000
|
$825.000
|
|
|
FIXED BOLLARD, REMOV BOLLARD (2 ITEMS)
|
EA
|
4.000
|
$2,500.000
|
$1,800.000
|
$768.920
|
$1,000.000
|
$600.000
|
$2,500.000
|
$4,500.000
|
$300.000
|
$265.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$14,500.000
|
$12,500.000
|
$5,515.990
|
$15,000.000
|
$15,600.000
|
$15,000.000
|
$15,000.000
|
$15,000.000
|
$7,300.000
|
|
|
TMA (STATIONARY)
|
DAY
|
87.000
|
$300.000
|
$300.000
|
$615.500
|
$350.000
|
$150.000
|
$250.000
|
$175.000
|
$200.000
|
$266.000
|
|
|
6" PVC WATER PIPE
|
LF
|
50.000
|
$50.000
|
$90.000
|
$115.000
|
$125.000
|
$110.000
|
$325.000
|
$138.000
|
$325.000
|
$406.000
|
|
|
8" PVC WATER PIPE
|
LF
|
10.000
|
$60.000
|
$120.000
|
$130.000
|
$141.300
|
$130.000
|
$340.000
|
$754.000
|
$340.000
|
$426.000
|
|
|
8" PVC PRESSURE RATED WASTEWATER PIPE
|
LF
|
40.000
|
$70.000
|
$125.000
|
$135.000
|
$146.740
|
$175.000
|
$550.000
|
$160.000
|
$550.000
|
$690.000
|
|
|
EXTRA IRON FITTINGS
|
TON
|
1.000
|
$2,000.000
|
$6,500.000
|
$6,400.000
|
$6,956.520
|
$6,700.000
|
$500.000
|
$9,350.000
|
$500.000
|
$625.000
|
|
|
WATER SERVICE
|
EA
|
1.000
|
$1,500.000
|
$1,475.000
|
$2,420.000
|
$2,630.430
|
$2,100.000
|
$500.000
|
$2,822.000
|
$500.000
|
$625.000
|
|
|
INSTALL FIRE HYDRANT
|
EA
|
2.000
|
$2,600.000
|
$3,000.000
|
$3,500.000
|
$3,804.350
|
$7,000.000
|
$7,000.000
|
$4,975.000
|
$7,000.000
|
$8,800.000
|
|
|
REMOVE EXISTING FIRE HYDRANT
|
EA
|
1.000
|
$200.000
|
$500.000
|
$1,000.000
|
$1,086.960
|
$1,100.000
|
$500.000
|
$440.000
|
$500.000
|
$625.000
|
|
|
DELIVER EXISTING FIRE HYDRANT
|
EA
|
1.000
|
$56.000
|
$150.000
|
$325.000
|
$353.260
|
$375.000
|
$200.000
|
$105.000
|
$200.000
|
$250.000
|
|
|
6" GATE VALVE
|
EA
|
2.000
|
$1,200.000
|
$1,050.000
|
$1,930.000
|
$2,097.830
|
$1,100.000
|
$1,750.000
|
$1,815.000
|
$1,750.000
|
$2,190.000
|
|
|
CUT AND PLUG WATER MAIN FOR TEST
|
EA
|
1.000
|
$320.000
|
$825.000
|
$2,000.000
|
$2,173.910
|
$1,350.000
|
$500.000
|
$3,531.000
|
$500.000
|
$625.000
|
|
|
WASTEWATER LATERAL
|
EA
|
1.000
|
$1,511.000
|
$2,500.000
|
$3,000.000
|
$3,260.870
|
$1,900.000
|
$500.000
|
$2,915.000
|
$500.000
|
$625.000
|
|
|
48" WASTEWATER MANHOLE
|
EA
|
2.000
|
$6,522.000
|
$4,450.000
|
$9,000.000
|
$9,782.610
|
$6,600.000
|
$15,000.000
|
$9,625.000
|
$15,000.000
|
$18,800.000
|
|
|
VACUUM TEST FOR WW MANHOLE
|
EA
|
2.000
|
$250.000
|
$400.000
|
$360.000
|
$391.310
|
$540.000
|
$150.000
|
$715.000
|
$150.000
|
$188.000
|
|
|
PLACEMENT OF BLACK SOD
|
SY
|
6.000
|
$9.000
|
$30.000
|
$3.920
|
$54.350
|
$60.000
|
$25.000
|
$165.000
|
$20.000
|
$6.000
|
|
|
TELEVISION INSPECTION
|
LF
|
80.000
|
$2.000
|
$5.000
|
$6.000
|
$6.520
|
$4.500
|
$10.000
|
$5.000
|
$10.000
|
$12.500
|
|
|
TRENCH SAFETY AND SUPPORT
|
LF
|
310.000
|
$4.000
|
$3.000
|
$10.000
|
$10.870
|
$11.000
|
$5.000
|
$3.000
|
$5.000
|
$6.250
|
|
|
ROCK FOUNDATION
|
CY
|
4.000
|
$50.000
|
$200.000
|
$45.000
|
$173.910
|
$80.000
|
$30.000
|
$61.000
|
$30.000
|
$37.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
3.000
|
$250.000
|
$275.000
|
$123.000
|
$195.650
|
$165.000
|
$90.000
|
$231.000
|
$90.000
|
$113.000
|
|
|
SAND BACKFILL
|
CY
|
5.000
|
$25.000
|
$60.000
|
$40.000
|
$86.960
|
$80.000
|
$20.000
|
$38.000
|
$20.000
|
$25.000
|
|
|
CEMENT TREATED BASE BACKFILL
|
CY
|
5.000
|
$60.000
|
$175.000
|
$142.000
|
$326.090
|
$165.000
|
$50.000
|
$215.000
|
$50.000
|
$62.500
|
|
|
CLASS "B" CONCRETE
|
CY
|
32.000
|
$200.000
|
$135.000
|
$175.000
|
$206.520
|
$220.000
|
$10.000
|
$424.000
|
$10.000
|
$12.500
|
|
|
TEMPORARY PAVING(HOTMIX OR HIGH PERFOR)
|
TON
|
8.000
|
$150.000
|
$250.000
|
$250.000
|
$271.740
|
$265.000
|
$50.000
|
$270.000
|
$50.000
|
$62.500
|
|
|
CRUSHED ROCK FOR TEMPORARY PAVING BASE
|
CY
|
11.000
|
$50.000
|
$150.000
|
$97.000
|
$86.960
|
$70.000
|
$30.000
|
$72.000
|
$30.000
|
$37.500
|
|
|
REINFORCED CONCRETE PAVEMENT
|
SY
|
134.000
|
$200.000
|
$75.000
|
$115.000
|
$111.040
|
$200.000
|
$210.000
|
$72.000
|
$210.000
|
$265.000
|
|
|
DISPOSAL OF HEAVILY CHLORINATED WATER
|
LS
|
1.000
|
$4.000
|
$775.000
|
$1,500.000
|
$1,630.430
|
$2,000.000
|
$50.000
|
$2,750.000
|
$50.000
|
$63.000
|
|
|
MOBILIZATION FOR WATER & WSTEWTR MAINS
|
LS
|
1.000
|
$14,948.000
|
$7,500.000
|
$24,000.000
|
$85,000.000
|
$12,000.000
|
$24,500.000
|
$7,095.000
|
$24,500.000
|
$31,000.000
|
|
|
ADJUST/RELOCATE WATER METER BOX
|
EA
|
1.000
|
$380.000
|
$320.000
|
$550.000
|
$597.830
|
$1,300.000
|
$50.000
|
$1,815.000
|
$50.000
|
$63.000
|
|
|
ADJUSTMENT OF WTR VALVE COVERS & VALVES
|
EA
|
5.000
|
$380.000
|
$320.000
|
$640.000
|
$695.650
|
$800.000
|
$250.000
|
$413.000
|
$50.000
|
$63.000
|
|
|
ADJUSTMENT OF WSTEWTR LATERAL CLEANOUT
|
EA
|
1.000
|
$300.000
|
$320.000
|
$500.000
|
$543.480
|
$550.000
|
$50.000
|
$495.000
|
$50.000
|
$63.000
|
|
|
ADJUSTMENT OF WASTEWATER MANHOLE
|
EA
|
2.000
|
$645.000
|
$850.000
|
$1,100.000
|
$1,195.650
|
$2,000.000
|
$50.000
|
$1,815.000
|
$50.000
|
$63.000
|
|
|
INVESTIGATION
|
EA
|
4.000
|
$1,000.000
|
$625.000
|
$8,000.000
|
$8,695.650
|
$500.000
|
$50.000
|
$1,084.000
|
$50.000
|
$63.000
|
|
|
12" PVC WATER PIPE
|
LF
|
210.000
|
$70.000
|
$195.000
|
$122.000
|
$132.610
|
$170.000
|
$370.000
|
$229.000
|
$370.000
|
$465.000
|
|
|
12" GATE VALVE
|
EA
|
3.000
|
$1,750.000
|
$3,525.000
|
$3,400.000
|
$3,695.650
|
$1,600.000
|
$4,000.000
|
$3,324.000
|
$4,000.000
|
$5,000.000
|
|
|
12" WATER MAIN CROSSING (BY OPEN CUT)
|
LF
|
50.000
|
$900.000
|
$195.000
|
$300.000
|
$326.090
|
$215.000
|
$200.000
|
$468.000
|
$200.000
|
$250.000
|
|
|
STANDARD 12" WATER MAIN LOWERING
|
EA
|
1.000
|
$6,500.000
|
$10,500.000
|
$12,000.000
|
$21,739.130
|
$4,000.000
|
$500.000
|
$15,650.000
|
$500.000
|
$625.000
|
|
|
CONCRETE CURB
|
LF
|
10.000
|
$45.000
|
$40.000
|
$8.000
|
$100.000
|
$80.000
|
$40.000
|
$61.000
|
$40.000
|
$50.000
|
|
Totals: |
$11,604,166.850
|
$10,270,242.380
|
$11,305,470.000
|
$11,408,656.157
|
$11,655,221.480
|
$11,840,500.000
|
$12,612,916.550
|
$13,564,103.160
|
$13,992,414.210
|