Show Job Controls
Bid Cobra

DALLAS SH 180 (0008-08-080)

Items: 81

County: DALLAS
Length: 0.0000 MILES
Highway: SH 180
District: DALLAS
Control Number: 0008-08-080
DBE Goal: 2.0%
Project: STP 2025(751)HES
Guaranty: $42,000.00
Time: 60 WORKING DAYS
Engineer's Estimate: $2,115,094.75
Date: 05/01/2025 (1 year ago)
Contract Number: 5253020
Type: TRAFFIC SIGNAL IMPROVEMENTS
Project ID: A00193674
Contract Type: Federal
Project Description: IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTOPHER BLAIN
BLAKE COLLINS
ERIC HERMAN
ANTHONY BLOCK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,115,094.75
$2,361,631.94
Over/Under Est: 11.66% $246,537.19
Over/Under Est: 20.88% $441,642.61
Amt Left: 8.26% $195,105.42
Over/Under Est: 24.91% $526,830.75
Amt Left: 11.87% $280,293.56
Delta: -3.33% -$85,188.14
Over/Under Est: 27.95% $591,080.00
Amt Left: 14.59% $344,542.81
Delta: -2.43% -$64,249.25
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 4.31% $101,786.34
ROAD MASTER STRIPING, LLC 1.54% $36,369.13
BLUE ROCK UTILITIES LLC 0.06% $1,416.98
Total: 5.91% $139,572.45

Bid Items & Bid Tabulations

81 Total 0 of 81
DALLAS  |  SH 180  |  DALLAS  |  0008-08-080  |  05/01/2025  |  $2,115,094.75  |  STP 2025(751)HES  |  TRAF SIGNAL IMPRVS  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WG ENGINEERING & CONSTRUCTION, LLC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
DURABLE SPECIALTIES, INC.
GREY SKY CONSTRUCTION LLC
REMOV CONC (CURB & GUTTER)
LF 140.000 $100.000 $97.700 $68.650 $100.000 $100.000
BLOCK SODDING
SY 13.000 $30.000 $502.000 $25.660 $350.000 $20.000
VEGETATIVE WATERING
TGL 0.010 $50.000 $20,267.800 $21.690 $100,000.000 $10,000.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 13.000 $750.000 $616.200 $970.610 $900.000 $550.000
RIPRAP (CONC)(6 IN)
CY 4.000 $1,000.000 $1,587.300 $1,605.850 $1,415.000 $1,200.000
ADJUSTING MANHOLES (CAP)
EA 3.000 $10,000.000 $2,441.900 $3,422.850 $2,500.000 $5,000.000
MOBILIZATION
LS 1.000 $350,000.000 $106,356.700 $80,912.560 $75,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $8,500.000 $12,282.800 $3,397.930 $6,500.000 $8,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 49.900 $200.000 $122.400 $77.020 $85.000 $150.000
TMA (STATIONARY)
DAY 61.000 $500.000 $274.800 $280.630 $750.000 $250.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 260.000 $3.000 $5.700 $5.110 $2.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 260.000 $2.000 $1.000 $3.350 $1.000 $9.000
CONC CURB (TY II)
LF 30.000 $55.000 $97.700 $96.150 $95.000 $100.000
CONC CURB & GUTTER (TY II)
LF 140.000 $115.000 $134.400 $106.950 $120.000 $150.000
CONC SIDEWALKS (6")
SY 81.000 $150.000 $183.200 $374.470 $185.000 $100.000
CURB RAMPS (TY 5)
EA 2.000 $4,000.000 $6,104.800 $11,892.690 $5,600.000 $3,850.000
CURB RAMPS (TY 7)
EA 7.000 $5,000.000 $5,494.300 $5,990.840 $5,100.000 $3,850.000
CONDT (PVC) (SCH 40) (3")
LF 110.000 $30.000 $22.300 $26.030 $50.000 $40.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 55.000 $50.000 $40.500 $61.700 $96.000 $60.000
CONDUIT (PREPARE)
LF 10,420.000 $4.500 $2.500 $8.350 $1.000 $5.000
ELEC CONDR (NO.6) BARE
LF 165.000 $3.000 $2.600 $9.460 $3.000 $3.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $2,500.000 $2,417.500 $2,501.600 $3,500.000 $1,500.000
ALUMINUM SIGNS (TY A)
SF 156.250 $50.000 $31.600 $83.810 $52.000 $35.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $650.000 $853.500 $1,029.260 $870.000 $1,150.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,080.000 $2.500 $3.700 $4.280 $1.000 $6.000
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 340.000 $5.000 $7.400 $5.560 $2.000 $6.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 905.000 $8.000 $16.500 $13.690 $4.000 $20.000
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 160.000 $8.000 $16.500 $11.120 $4.000 $20.000
PAVEMENT SLER 6"
LF 4,965.000 $1.000 $0.800 $0.090 $4.000 $1.000
PAVEMENT SLER 8"
LF 1,080.000 $1.500 $1.900 $0.090 $0.150 $3.000
PAVEMENT SLER 12"
LF 340.000 $2.000 $2.500 $0.090 $0.250 $5.000
PAVEMENT SLER 24"
LF 995.000 $3.500 $4.900 $0.090 $1.000 $20.000
PAVEMENT SLER (ARROW)
EA 11.000 $75.000 $122.100 $17.110 $150.000 $250.000
PAVEMENT SLER (WORD)
EA 10.000 $75.000 $140.500 $17.110 $150.000 $250.000
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 630.000 $1.250 $3.700 $3.250 $1.000 $3.000
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 1,400.000 $1.250 $2.500 $3.250 $1.000 $3.000
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 60.000 $1.250 $3.700 $3.250 $1.000 $3.000
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 2,875.000 $1.250 $2.500 $3.250 $1.000 $3.000
PREFAB PM TY C (W)(ARROW)
EA 11.000 $350.000 $427.400 $770.150 $550.000 $250.000
PREFAB PM TY C (W)(WORD)
EA 10.000 $450.000 $610.500 $770.150 $550.000 $250.000
REFL PAV MRKR TY I-C
EA 85.000 $4.750 $9.200 $8.560 $3.000 $6.000
REFL PAV MRKR TY II-A-A
EA 116.000 $5.000 $9.200 $8.560 $3.000 $6.000
ELIM EXT PM & MRKS (4")
LF 2,000.000 $1.500 $1.300 $1.880 $0.200 $1.000
ELIM EXT PM & MRKS (6")
LF 2,060.000 $1.750 $1.300 $2.740 $0.300 $3.000
ELIM EXT PM & MRKS (8")
LF 980.000 $2.000 $2.500 $3.770 $0.500 $6.000
ELIM EXT PM & MRKS (12")
LF 1,586.000 $2.500 $3.700 $5.480 $1.000 $10.000
ELIM EXT PM & MRKS (24")
LF 260.000 $4.000 $7.400 $10.950 $1.500 $20.000
ELIM EXT PM & MRKS (ARROW)
EA 13.000 $65.000 $122.100 $171.150 $75.000 $250.000
ELIM EXT PM & MRKS (WORD)
EA 1.000 $65.000 $91.600 $171.150 $75.000 $250.000
PAV SURF PREP FOR MRK (6")
LF 4,965.000 $0.250 $0.500 $0.090 $0.200 $3.000
PAV SURF PREP FOR MRK (8")
LF 1,080.000 $0.750 $0.700 $0.090 $0.500 $6.000
PAV SURF PREP FOR MRK (12")
LF 340.000 $1.250 $1.300 $0.090 $1.000 $10.000
PAV SURF PREP FOR MRK (24")
LF 995.000 $2.000 $2.500 $0.090 $2.000 $20.000
PAV SURF PREP FOR MRK (ARROW)
EA 11.000 $35.000 $79.400 $17.110 $75.000 $250.000
PAV SURF PREP FOR MRK (WORD)
EA 10.000 $45.000 $103.800 $17.110 $75.000 $250.000
PAV SURF PREP FOR MRK (RPM)
EA 201.000 $0.500 $1.300 $1.170 $2.000 $150.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $10,000.000 $8,058.300 $19,305.550 $3,500.000 $15,000.000
INSTALL HWY TRF SIG (UPGRADE)
EA 29.000 $4,000.000 $9,994.100 $6,091.190 $14,000.000 $15,000.000
VEH SIG SEC (12")LED(GRN)
EA 2.000 $465.000 $368.800 $655.160 $700.000 $325.000
VEH SIG SEC (12")LED(GRN ARW)
EA 12.000 $465.000 $368.800 $655.160 $700.000 $325.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $465.000 $368.800 $655.160 $700.000 $325.000
VEH SIG SEC (12")LED(YEL ARW)
EA 24.000 $465.000 $368.800 $655.160 $700.000 $325.000
VEH SIG SEC (12")LED(RED)
EA 2.000 $465.000 $368.800 $655.160 $700.000 $325.000
VEH SIG SEC (12")LED(RED ARW)
EA 24.000 $465.000 $368.800 $655.160 $700.000 $325.000
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $1,200.000 $619.100 $871.490 $1,260.000 $6,500.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 256.000 $250.000 $280.900 $208.420 $265.000 $250.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 36.000 $275.000 $268.700 $261.260 $290.000 $300.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 62.000 $300.000 $274.800 $296.490 $315.000 $350.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 215.000 $4.000 $3.000 $6.150 $3.000 $3.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 385.000 $4.500 $3.100 $11.370 $3.000 $3.000
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 1,350.000 $5.000 $3.800 $12.360 $6.000 $3.000
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 255.000 $10.000 $9.200 $16.530 $9.000 $3.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 2,120.000 $4.000 $2.800 $10.650 $3.000 $3.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 1.000 $15,000.000 $18,535.200 $23,741.000 $20,000.000 $25,000.000
PED POLE ASSEMBLY
EA 8.000 $4,000.000 $3,554.200 $2,008.780 $8,500.000 $4,500.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $1,800.000 $1,130.600 $1,064.560 $1,400.000 $1,850.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $4,500.000 $3,719.100 $10,928.530 $7,000.000 $6,500.000
RVDS (PRESENCE DETECTION ONLY)
EA 49.000 $11,000.000 $11,977.300 $12,844.600 $13,500.000 $9,000.000
RVDS (PRESENCE AND ADVANCE DETECTION)
EA 38.000 $12,250.000 $21,094.500 $25,174.550 $23,500.000 $20,000.000
GROUND BOX (PREPARE)
EA 104.000 $500.000 $222.300 $372.780 $100.000 $500.000
GROUND BOX (ADJUST)
EA 7.000 $2,500.000 $969.500 $745.570 $1,500.000 $250.000
Totals: $2,115,094.750 $2,361,631.938 $2,556,737.357 $2,641,925.500 $2,706,174.750
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $3,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $4,500.00