DALLAS SH 180 (0008-08-076)

Items: 39

County: DALLAS
Length: N/A
Highway: SH 180
District: DALLAS
Control Number: 0008-08-076
DBE Goal: N/A
Project: NH 2019(709)
Guaranty: N/A
Time: 51 WORKING DAYS
Engineer's Estimate: $1,437,449.55
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: MILL, OVERLAY & FLEX PVMNT REPAIR ON FRONTAGE RDS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,437,449.55
$1,120,775.51
Over/Under Est: -22.03% -$316,674.04
Over/Under Est: -2.07% -$29,696.88
Amt Left: 25.61% $286,977.16
Over/Under Est: 0.23% $3,373.85
Amt Left: 28.56% $320,047.89
Delta: -2.35% -$33,070.73
$2,012,777.00
Over/Under Est: 40.02% $575,327.45
Amt Left: 79.59% $892,001.49
Delta: -39.70% -$571,953.60

Bid Items & Bid Tabulations

39 Total 0 of 39
DALLAS  |  SH 180  |  DALLAS  |  0008-08-076  |  04/02/2019  |  $1,437,449.55  |  NH 2019(709)  |  MILL, OVERLAY & FLEX PVMNT REPAIR ON...  |  51 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
ED BELL CONSTRUCTION COMPANY
FOUTSCO PAVING COMPANY, LLC
FNH CONSTRUCTION, LLC
REMOVING CONC (DRIVEWAYS)
SY 106.000 $15.000 $20.000 $52.500 $40.000 $30.000
REMOVING STAB BASE AND ASPH PAV (2")
SY 1,063.000 $4.000 $6.000 $7.230 $9.000 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 82.000 $22.000 $60.250 $105.000 $25.000 $50.000
BACKFILL (TY A OR B)
STA 107.000 $155.000 $300.000 $315.000 $100.000 $350.000
COMPOST MANUF TOPSOIL (4")
SY 1,292.000 $2.000 $2.300 $9.540 $2.000 $10.000
BLOCK SODDING
SY 1,292.000 $4.000 $6.000 $6.000 $7.000 $8.000
VEGETATIVE WATERING
MG 195.000 $10.000 $25.000 $80.000 $25.000 $50.000
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 4,312.000 $93.000 $84.000 $87.000 $86.000 $140.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 9,738.000 $58.000 $22.000 $40.000 $60.000 $40.000
PLANE ASPH CONC PAV (2")
SY 39,196.000 $2.250 $1.800 $1.850 $1.000 $7.000
RC PIPE (CL III)(18 IN)
LF 472.000 $48.000 $65.000 $105.000 $80.000 $85.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 34.000 $650.000 $950.000 $945.000 $950.000 $1,850.000
REMOV STR (PIPE)
LF 472.000 $15.000 $32.000 $21.000 $20.000 $30.000
MOBILIZATION
LS 1.000 $127,814.000 $100,000.000 $127,500.000 $100,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $10,500.000 $35,055.000 $25,000.000 $2,000.000 $25,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $20.000 $0.010 $23.000 $10.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $10.000 $0.010 $12.000 $5.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $2.000 $2.500 $2.750 $2.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $1.000 $0.600 $0.700 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 600.000 $4.000 $5.750 $6.000 $4.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 600.000 $1.000 $0.900 $0.950 $1.000 $9.000
DRIVEWAYS (ACP)
SY 1,414.000 $28.000 $23.000 $27.500 $85.000 $42.000
DRIVEWAYS (CONC) (HES)
SY 106.000 $100.000 $143.000 $175.000 $130.000 $125.000
REMOVE METAL BEAM GUARD FENCE
LF 25.000 $6.000 $25.000 $10.500 $10.000 $3.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $260.000 $240.000 $265.000 $300.000 $650.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $570.000 $595.000 $525.000 $700.000 $650.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 13.000 $63.000 $47.000 $100.000 $75.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $20.000 $27.000 $50.000 $30.000 $100.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 25,772.000 $0.350 $0.550 $0.750 $0.550 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,289.000 $0.750 $1.150 $4.000 $1.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 284.000 $6.000 $6.450 $6.500 $7.000 $20.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 25,772.000 $0.400 $0.550 $0.600 $0.450 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 25,772.000 $0.400 $0.550 $0.600 $0.450 $1.000
REFL PAV MRKR TY II-A-A
EA 322.000 $3.000 $5.550 $5.500 $7.000 $15.000
LITTER REMOVAL
CYC 1.000 $3,000.000 $1,700.000 $1,300.000 $1,000.000 $5,000.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 830.000 $13.000 $9.500 $11.000 $3.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $3,825.000 $17,850.000 $10,000.000 $8,500.000
TMA (STATIONARY)
EA 1.000 $11,000.000 $7,150.000 $9,000.000 $6,000.000 $15,000.000
TMA (MOBILE OPERATION)
DAY 10.000 $250.000 $100.000 $105.000 $250.000 $850.000
Totals: $1,437,449.550 $1,120,775.510 $1,407,752.670 $1,440,823.400 $2,012,777.000