DALLAM US 54 (0238-04-038)

Items: 77

County: DALLAM
Length: N/A
Highway: US 54
District: AMARILLO
Control Number: 0238-04-038
DBE Goal: N/A
Project: F 2022(300)
Guaranty: N/A
Time: 127 WORKING DAYS
Engineer's Estimate: $8,541,035.45
Date: 01/06/2022 (4 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$8,541,035.45
1
$8,285,085.48
Over/Under Est: -3% -$255,949.97
$10,363,722.03
Over/Under Est: 21.34% $1,822,686.58
Amt Left: 25.09% $2,078,636.55
$11,796,301.20
Over/Under Est: 38.11% $3,255,265.75
Amt Left: 42.38% $3,511,215.72
Delta: -13.82% -$1,432,579.17

Bid Items & Bid Tabulations

77 Total 0 of 77
DALLAM  |  US 54  |  AMARILLO  |  0238-04-038  |  01/06/2022  |  $8,541,035.45  |  F 2022(300)  |  HWY IMPRV  |  127 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
PREPARING ROW
AC 26.590 $250.000 $163.150 $200.000 $1,630.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 9.000 $275.000 $402.930 $435.000 $1,750.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 10.000 $700.000 $543.960 $1,700.000 $2,200.000
REMOVING CONC (RIPRAP)
SY 48.000 $20.000 $54.440 $64.000 $50.000
REMOVING CONC (FLUME)
SY 4.000 $30.000 $108.880 $78.000 $100.000
REMOVING STAB BASE AND ASPH PAV(8")
SY 463.000 $6.000 $29.980 $30.100 $55.000
SUBGRADE WIDENING (DENS CONT)
STA 32.940 $1,500.000 $1,580.870 $1,895.000 $4,000.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 988.000 $25.000 $21.530 $28.000 $75.000
BACKFILL (TY A)
STA 579.510 $190.000 $194.060 $255.000 $350.000
BLADING
HR 20.000 $140.000 $249.040 $430.000 $300.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 29.790 $650.000 $420.000 $610.000 $650.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 29.790 $650.000 $409.500 $510.000 $650.000
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
SY 9,360.000 $18.000 $20.140 $20.550 $30.000
REWORK BS MTL (TY B) (14") (DENS CONT)
SY 4,972.000 $9.000 $21.030 $15.400 $12.000
REWORK BS MTL (TY B)(20")(DENS CONT)
SY 38.000 $17.500 $117.930 $84.000 $300.000
PRIME COAT (MC-30)
GAL 2,341.000 $5.000 $4.480 $5.350 $8.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 14,425.000 $4.000 $3.320 $4.300 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 12,260.000 $17.000 $18.150 $27.000 $41.000
PLANE ASPH CONC PAV(0" TO 2")
SY 7,186.000 $6.000 $5.100 $3.850 $8.000
PLANE ASPH CONC PAV (2")
SY 2,487.000 $3.750 $3.030 $6.150 $9.000
PLANE ASPH CONC PAV (4")
SY 4,520.000 $3.000 $4.960 $8.700 $13.000
RIPRAP (CONC)(5 IN)
CY 5.000 $1,000.000 $707.680 $1,125.000 $650.000
CMP (GAL STL 24 IN)
LF 45.000 $130.000 $236.250 $145.000 $300.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 62.000 $500.000 $626.030 $620.000 $575.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 64.000 $600.000 $789.340 $785.000 $725.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 10.000 $550.000 $762.120 $1,480.000 $700.000
CONC BOX CULV (2.5 FT X 2 FT)(EXTEND)
LF 4.000 $500.000 $653.250 $1,620.000 $600.000
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(C)
EA 5.000 $8,000.000 $5,988.080 $7,125.000 $5,500.000
SET (TY I)(S= 6 FT)(HW= 2 FT)(6:1) (C)
EA 2.000 $9,000.000 $7,349.010 $7,770.000 $6,750.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (C)
EA 12.000 $12,000.000 $7,893.380 $10,300.000 $7,250.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,500.000 $1,306.490 $4,630.000 $1,200.000
SET (TY I)(S= 2.5 FT)(HW= 2FT)(6:1)(P)
EA 2.000 $8,000.000 $5,443.710 $7,500.000 $1,200.000
REMOV STR (SET)
EA 14.000 $1,100.000 $391.950 $500.000 $360.000
REMOV STR (PIPE)
LF 37.000 $50.000 $27.220 $32.000 $25.000
REMOV STR (BOX CULVERT)
LF 36.000 $200.000 $76.210 $250.000 $70.000
MOBILIZATION
LS 1.000 $700,000.000 $414,254.270 $1,030,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $5,278.050 $30,000.000 $40,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,200.000 $5.000 $5.250 $8.300 $17.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,200.000 $2.000 $1.050 $4.700 $8.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 124,276.000 $0.250 $0.080 $0.250 $0.400
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 62,138.000 $0.250 $0.080 $0.250 $0.400
MTL W-BEAM GD FEN (STEEL POST)
LF 2,000.000 $30.000 $36.750 $40.100 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,100.000 $3,165.000 $2,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,500.000 $2,100.000 $1,980.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 1,800.000 $4.000 $2.630 $3.200 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $325.000 $262.500 $320.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,100.000 $3,150.000 $3,750.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $800.000 $262.500 $320.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $875.000 $1,050.000 $1,400.000 $1,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 13.000 $400.000 $525.000 $925.000 $500.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $400.000 $787.500 $1,055.000 $750.000
REMOVE SM RD SN SUP&AM
EA 4.000 $150.000 $105.000 $115.000 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 46.000 $17.000 $21.000 $11.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 26.000 $40.000 $31.500 $50.000 $30.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 24.000 $175.000 $78.750 $170.000 $75.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,828.000 $1.300 $1.180 $1.250 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 12,046.000 $1.300 $1.180 $1.300 $1.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 231.000 $11.000 $8.400 $10.550 $10.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 4.000 $165.000 $210.000 $211.000 $200.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 4.000 $265.000 $210.000 $316.500 $300.000
REFL PAV MRK TY I (W)(RR XING)(090MIL)
EA 4.000 $1,000.000 $525.000 $845.000 $800.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 5,565.000 $0.450 $0.410 $0.500 $0.470
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 122,287.000 $0.400 $0.410 $0.470 $0.450
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 7,842.000 $0.450 $0.410 $0.500 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 83,201.000 $0.400 $0.410 $0.490 $0.460
REFL PAV MRKR TY I-C
EA 319.000 $5.000 $3.150 $5.300 $5.000
REFL PAV MRKR TY II-A-A
EA 1,307.000 $5.000 $3.150 $4.750 $4.500
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 213,639.000 $5.500 $6.200 $6.500 $6.000
ASPH FOR REINF FAB (AC-20-5TR)
GAL 40,591.000 $4.500 $4.040 $5.100 $4.000
D-GR HMA TY-B PG64-28
TON 4,118.000 $110.000 $112.050 $143.000 $135.000
TACK COAT
GAL 1,217.000 $4.000 $6.720 $4.000 $4.500
SP MIXES SP-D SAC-A PG70-28
TON 36,846.000 $115.000 $115.540 $132.000 $160.000
TACK COAT
GAL 15,615.000 $5.850 $4.280 $4.000 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $13,000.000 $8,521.090 $21,000.000 $15,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $15,000.000 $7,274.400 $16,000.000 $15,000.000
TMA (STATIONARY)
DAY 110.000 $350.000 $399.290 $575.000 $250.000
TMA (MOBILE OPERATION)
HR 160.000 $80.000 $77.380 $95.000 $95.000
Totals: $8,541,035.450 $8,285,085.502 $10,363,722.030 $11,796,301.200