CULBERSON IH0010 (6349-88-001)

Items: 31

County: CULBERSON
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6349-88-001
DBE Goal: N/A
Project: RMC - 634988001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $213,835.00
Date: 03/25/2020 (6 years ago)
Contract Number: N/A
Type: METAL BEAM GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$213,835.00
Over/Under Est: 24.79% $53,005.00
Over/Under Est: 39.44% $84,340.00
Amt Left: 11.74% $31,335.00
$363,600.00
Over/Under Est: 70.04% $149,765.00
Amt Left: 36.26% $96,760.00
Delta: -21.94% -$65,425.00

Bid Items & Bid Tabulations

31 Total 0 of 31
CULBERSON  |  IH0010  |  EL PASO  |  6349-88-001  |  03/25/2020  |  $213,835.00  |  RMC - 634988001  |  METAL BEAM GUARDRAIL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SYNERGY PROJECT CONTRACTORS, INC.
APACHE BARRICADE & SIGN
MIJELUM, L.L.C.
MOBILIZATION
LS 1.000 $30,000.000 $35,000.000 $10,000.000 $8,000.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $17.000 $10.000 $5.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $512.000 $400.000 $250.000 $500.000
CABLE BARRIER SYSTEM (TL-4)
LF 100.000 $10.000 $10.000 $20.000 $300.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 1.000 $2,800.000 $2,500.000 $3,500.000 $2,500.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,400.000 $33.000 $23.000 $24.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $53.000 $24.000 $30.000 $25.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $53.000 $25.000 $30.000 $30.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 45.000 $138.000 $43.000 $125.000 $100.000
REALIGN POSTS
EA 40.000 $15.000 $15.000 $15.000 $50.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 20.000 $86.000 $20.000 $20.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $44.000 $22.000 $30.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $132.000 $85.000 $275.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 3.000 $225.000 $225.000 $100.000 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 50.000 $140.000 $150.000 $300.000 $100.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $1,300.000 $1,300.000 $1,500.000 $2,000.000
REPLACE SGT OBJECT MARKER
EA 20.000 $106.000 $20.000 $20.000 $100.000
REPLACE POSTS (TL-4)
EA 50.000 $170.000 $160.000 $200.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $150.000 $225.000 $450.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $170.000 $240.000 $450.000 $100.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $280.000 $475.000 $300.000 $200.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,250.000 $500.000 $1,000.000 $500.000
REPLACE CABLE (TL-4)
LF 250.000 $4.000 $6.000 $15.000 $30.000
POST AND CABLE FENCE (REMOVAL)
LF 100.000 $5.000 $5.000 $5.000 $10.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 2.000 $45.000 $100.000 $75.000 $300.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 20.000 $4.000 $150.000 $30.000 $25.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 2.000 $45.000 $350.000 $75.000 $500.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 20.000 $18.000 $100.000 $50.000 $50.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 20.000 $4.000 $110.000 $10.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $100.000 $150.000 $75.000 $5,000.000
TMA (STATIONARY)
DAY 300.000 $70.000 $375.000 $450.000 $500.000
Totals: $213,835.000 $266,840.000 $298,175.000 $363,600.000