|
|
PREPARING ROW
|
STA
|
264.000
|
$1,200.000
|
$1,400.000
|
$500.000
|
$500.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
106,031.000
|
$10.000
|
$4.000
|
$6.500
|
$16.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
42,478.000
|
$22.000
|
$18.000
|
$33.000
|
$38.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
42,830.000
|
$28.000
|
$40.000
|
$53.000
|
$45.000
|
|
|
BACKFILL TY A
|
CY
|
21,003.000
|
$35.000
|
$35.000
|
$42.000
|
$48.000
|
|
|
BLADING
|
HR
|
46.000
|
$175.000
|
$100.000
|
$150.000
|
$250.000
|
|
|
PROOF ROLLING
|
HR
|
46.000
|
$135.000
|
$100.000
|
$85.000
|
$250.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
145,373.000
|
$17.000
|
$14.000
|
$19.000
|
$22.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
29,076.000
|
$6.500
|
$6.500
|
$5.000
|
$7.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
4,771.000
|
$5.000
|
$6.000
|
$7.500
|
$7.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
50,882.000
|
$7.000
|
$5.500
|
$5.000
|
$7.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,228.000
|
$150.000
|
$205.000
|
$260.000
|
$250.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
45.000
|
$10.000
|
$100.000
|
$95.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
815.000
|
$200.000
|
$250.000
|
$325.000
|
$275.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
654.000
|
$4.500
|
$10.000
|
$1.750
|
$28.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,455.000
|
$50.000
|
$20.000
|
$55.000
|
$70.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
195.000
|
$150.000
|
$150.000
|
$275.000
|
$600.000
|
|
|
RIPRAP (SPECIAL)
|
CY
|
38.000
|
$150.000
|
$800.000
|
$305.000
|
$600.000
|
|
|
GABION MATTRESSES (GALV) (24 IN)
|
SY
|
13,387.000
|
$180.000
|
$125.000
|
$150.000
|
$110.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
77.000
|
$500.000
|
$950.000
|
$900.000
|
$1,210.000
|
|
|
CONC BOX CULV (7 FT X 7 FT)
|
LF
|
63.000
|
$800.000
|
$1,300.000
|
$1,200.000
|
$1,705.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)
|
LF
|
64.000
|
$1,200.000
|
$2,100.000
|
$1,800.000
|
$2,640.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,730.000
|
$110.000
|
$115.000
|
$110.000
|
$165.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
164.000
|
$140.000
|
$190.000
|
$175.000
|
$303.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
136.000
|
$185.000
|
$230.000
|
$225.000
|
$385.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
300.000
|
$155.000
|
$150.000
|
$160.000
|
$209.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
2.000
|
$32,000.000
|
$51,000.000
|
$50,000.000
|
$121,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$19,000.000
|
$30,000.000
|
$20,000.000
|
$23,650.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$22,000.000
|
$30,000.000
|
$20,000.000
|
$23,650.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$30,000.000
|
$41,000.000
|
$30,000.000
|
$71,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
46.000
|
$2,000.000
|
$1,530.000
|
$1,800.000
|
$2,475.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,250.000
|
$1,815.000
|
$1,850.000
|
$2,750.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,250.000
|
$2,200.000
|
$2,000.000
|
$3,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$2,500.000
|
$2,250.000
|
$2,200.000
|
$3,300.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$3,650.000
|
$3,500.000
|
$5,720.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
3.000
|
$20,000.000
|
$2,000.000
|
$5,000.000
|
$11,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
32.000
|
$1,800.000
|
$1,500.000
|
$1,400.000
|
$1,650.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,575.000
|
$40.000
|
$18.000
|
$32.000
|
$22.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,026,223.000
|
$2,000,000.000
|
$2,500,000.000
|
$2,250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$20,000.000
|
$15,000.000
|
$20,000.000
|
$22,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
889.000
|
$30.000
|
$45.000
|
$45.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
889.000
|
$10.000
|
$17.000
|
$12.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,640.000
|
$4.000
|
$5.000
|
$4.850
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,640.000
|
$2.000
|
$1.500
|
$1.850
|
$3.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,440.000
|
$60.000
|
$115.000
|
$32.000
|
$100.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
18.000
|
$6,500.000
|
$4,000.000
|
$3,500.000
|
$5,140.000
|
|
|
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
|
DAY
|
720.000
|
$425.000
|
$110.000
|
$70.000
|
$240.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
7,410.000
|
$15.000
|
$3.250
|
$15.000
|
$18.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
44,880.000
|
$7.000
|
$2.000
|
$1.000
|
$15.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
7,410.000
|
$10.000
|
$3.250
|
$14.500
|
$18.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
326.000
|
$115.000
|
$115.000
|
$125.000
|
$220.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
652.000
|
$70.000
|
$120.000
|
$145.000
|
$174.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
51,655.000
|
$0.250
|
$0.200
|
$0.210
|
$0.400
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
24,106.000
|
$0.250
|
$0.200
|
$0.290
|
$0.400
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,850.000
|
$35.000
|
$40.000
|
$30.000
|
$33.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
6.000
|
$1,450.000
|
$4,200.000
|
$1,900.000
|
$1,579.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
4.000
|
$1,000.000
|
$4,800.000
|
$1,500.000
|
$1,080.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$4.500
|
$10.000
|
$5.000
|
$6.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$3,500.000
|
$3,500.000
|
$3,500.000
|
$3,872.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
84.000
|
$2,000.000
|
$500.000
|
$825.000
|
$4,263.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
16.000
|
$1,000.000
|
$500.000
|
$800.000
|
$3,730.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
16.000
|
$12,000.000
|
$12,500.000
|
$10,000.000
|
$8,029.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$750.000
|
$1,100.000
|
$1,750.000
|
$1,072.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$900.000
|
$1,100.000
|
$1,900.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,400.000
|
$1,500.000
|
$2,100.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,200.000
|
$1,500.000
|
$2,200.000
|
$1,430.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$150.000
|
$200.000
|
$175.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
|
EA
|
49.000
|
$60.000
|
$75.000
|
$70.000
|
$98.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
33.000
|
$85.000
|
$75.000
|
$125.000
|
$98.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
87.000
|
$32.000
|
$50.000
|
$25.000
|
$33.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
55.000
|
$50.000
|
$75.000
|
$55.000
|
$39.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
105,600.000
|
$0.500
|
$0.500
|
$0.500
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
400.000
|
$6.000
|
$8.000
|
$10.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
5,810.000
|
$2.000
|
$2.700
|
$1.350
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
427.000
|
$20.000
|
$15.000
|
$20.000
|
$22.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
34,253.000
|
$2.000
|
$2.850
|
$1.350
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,642.000
|
$1.750
|
$2.000
|
$2.300
|
$0.900
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,642.000
|
$1.750
|
$2.000
|
$2.300
|
$0.900
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
921.000
|
$2.000
|
$2.650
|
$1.250
|
$1.350
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
92.000
|
$12.000
|
$10.500
|
$20.000
|
$22.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$205.000
|
$175.000
|
$300.000
|
$330.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$250.000
|
$200.000
|
$400.000
|
$440.000
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
52,820.000
|
$0.500
|
$0.470
|
$0.250
|
$0.300
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
921.000
|
$1.000
|
$0.770
|
$0.500
|
$0.550
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
92.000
|
$4.500
|
$6.180
|
$10.000
|
$11.000
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
4.000
|
$105.000
|
$120.000
|
$150.000
|
$165.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
4.000
|
$120.000
|
$120.000
|
$200.000
|
$220.000
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
3,835.000
|
$0.500
|
$0.520
|
$0.250
|
$0.280
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
32,734.000
|
$0.500
|
$0.470
|
$0.250
|
$0.280
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
52,820.000
|
$1.200
|
$1.200
|
$0.800
|
$0.880
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
3,835.000
|
$1.200
|
$1.250
|
$0.850
|
$0.940
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
32,734.000
|
$1.200
|
$1.250
|
$0.800
|
$0.880
|
|
REFL PAV MRKR TY I-C
|
EA
|
47.000
|
$6.000
|
$6.200
|
$10.000
|
$11.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,022.000
|
$6.000
|
$6.200
|
$5.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
26,400.000
|
$1.150
|
$0.660
|
$1.000
|
$1.100
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
200.000
|
$150.000
|
$85.000
|
$100.000
|
$120.000
|
|
|
FILTER FABRIC (TY 2)
|
SY
|
50.000
|
$43.000
|
$100.000
|
$9.500
|
$24.000
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
30,738.000
|
$120.000
|
$190.000
|
$225.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
21,808.000
|
$7.000
|
$5.500
|
$6.000
|
$7.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
14,716.000
|
$140.000
|
$205.000
|
$235.000
|
$163.000
|
|
|
TACK COAT
|
GAL
|
20,047.000
|
$7.000
|
$5.500
|
$6.000
|
$7.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$16,000.000
|
$15,000.000
|
$40,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
720.000
|
$250.000
|
$190.000
|
$200.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
32.000
|
$400.000
|
$300.000
|
$650.000
|
$750.000
|
|
Totals: |
$21,998,584.550
|
$22,966,170.760
|
$27,517,019.990
|
$27,854,106.140
|