|
|
PREPARING ROW
|
STA
|
646.000
|
$900.000
|
$1,500.000
|
$7,500.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
256,802.000
|
$6.000
|
$4.000
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
118,218.000
|
$20.000
|
$20.000
|
$17.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
166,395.000
|
$26.000
|
$40.000
|
$28.800
|
|
|
BACKFILL TY A
|
CY
|
43,564.000
|
$35.000
|
$34.500
|
$45.000
|
|
|
BLADING
|
HR
|
110.000
|
$175.000
|
$105.000
|
$95.800
|
|
|
PROOF ROLLING
|
HR
|
110.000
|
$135.000
|
$60.000
|
$56.610
|
|
|
FL BS (RDWY DEL)(TY A GR 5)
|
TON
|
220,050.000
|
$48.000
|
$35.000
|
$23.130
|
|
|
PRIME COAT (AE-P)
|
GAL
|
51,571.000
|
$4.500
|
$7.000
|
$2.500
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
11,649.000
|
$5.000
|
$6.500
|
$3.500
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
195,969.000
|
$4.000
|
$4.000
|
$3.270
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,902.000
|
$125.000
|
$200.000
|
$200.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
2,367.000
|
$160.000
|
$135.000
|
$250.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
49.000
|
$2.500
|
$50.000
|
$44.900
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
8,142.000
|
$20.000
|
$1.000
|
$1.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
2,104.000
|
$175.000
|
$300.000
|
$270.110
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
953.000
|
$4.500
|
$6.500
|
$1.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
24,178.000
|
$50.000
|
$22.000
|
$37.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
10,029.000
|
$120.000
|
$120.000
|
$118.990
|
|
|
RIPRAP (SPECIAL)
|
CY
|
19.000
|
$150.000
|
$300.000
|
$156.030
|
|
|
GABION MATTRESSES (GALV) (24 IN)
|
SY
|
26,454.000
|
$150.000
|
$135.000
|
$135.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
230.000
|
$240.000
|
$300.000
|
$303.910
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
112.000
|
$250.000
|
$290.000
|
$304.550
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
1,454.000
|
$425.000
|
$490.000
|
$527.660
|
|
|
CONC BOX CULV (10 FT X 8 FT)
|
LF
|
312.000
|
$1,200.000
|
$1,000.000
|
$1,387.430
|
|
|
CONC BOX CULV (12 FT X 10 FT)
|
LF
|
536.000
|
$1,300.000
|
$1,200.000
|
$1,773.680
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,185.000
|
$125.000
|
$150.000
|
$216.520
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
970.000
|
$130.000
|
$110.000
|
$127.830
|
|
|
HEADWALL (CH - FW - 45) (DIA= 36 IN)
|
EA
|
2.000
|
$6,000.000
|
$9,500.000
|
$8,698.360
|
|
|
WINGWALL (PW - 1) (HW=15 FT)
|
EA
|
2.000
|
$40,000.000
|
$130,000.000
|
$101,742.720
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
4.000
|
$22,000.000
|
$45,000.000
|
$32,268.560
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
4.000
|
$34,000.000
|
$50,000.000
|
$42,276.640
|
|
|
WINGWALL (PW - 2) (HW=13 FT)
|
EA
|
2.000
|
$35,000.000
|
$95,000.000
|
$73,422.240
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
12.000
|
$15,000.000
|
$25,000.000
|
$13,198.670
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
4.000
|
$17,000.000
|
$22,000.000
|
$12,573.550
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
2.000
|
$19,000.000
|
$35,000.000
|
$31,187.810
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
4.000
|
$8,000.000
|
$6,500.000
|
$1,481.150
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
4.000
|
$12,000.000
|
$9,000.000
|
$3,207.440
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$2,250.000
|
$1,700.000
|
$1,728.610
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
30.000
|
$2,400.000
|
$3,000.000
|
$2,202.230
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
12.000
|
$12,000.000
|
$5,500.000
|
$4,627.220
|
|
|
REMOV STR (WINGWALL)
|
EA
|
54.000
|
$1,300.000
|
$1,400.000
|
$1,460.080
|
|
|
REMOV STR (PIPE)
|
LF
|
1,140.000
|
$35.000
|
$15.000
|
$30.520
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,000,000.000
|
$4,500,000.000
|
$4,985,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$20,000.000
|
$15,000.000
|
$9,511.570
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
5,772.000
|
$20.000
|
$30.000
|
$6.290
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
5,772.000
|
$8.000
|
$6.000
|
$0.880
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,180.000
|
$4.000
|
$3.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,180.000
|
$2.000
|
$1.000
|
$1.460
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
24.000
|
$6,000.000
|
$5,000.000
|
$10,000.000
|
|
|
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
|
DAY
|
960.000
|
$300.000
|
$120.000
|
$42.460
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
10,620.000
|
$75.000
|
$65.000
|
$82.710
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
107,520.000
|
$6.000
|
$1.750
|
$4.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
10,620.000
|
$8.000
|
$2.500
|
$4.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
489.000
|
$85.000
|
$100.000
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,053.000
|
$70.000
|
$75.000
|
$50.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
128,520.000
|
$0.200
|
$0.100
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
64,355.000
|
$0.200
|
$0.100
|
$0.110
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
14,800.000
|
$30.000
|
$18.000
|
$35.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
475.000
|
$36.000
|
$20.000
|
$32.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
18.000
|
$1,450.000
|
$1,000.000
|
$2,200.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
4.000
|
$625.000
|
$500.000
|
$13,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
870.000
|
$4.500
|
$2.000
|
$32.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
66.000
|
$3,000.000
|
$3,000.000
|
$4,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
200.000
|
$2,000.000
|
$600.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
26.000
|
$1,000.000
|
$700.000
|
$281.110
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
26.000
|
$12,000.000
|
$8,000.000
|
$8,243.860
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
64.000
|
$700.000
|
$650.000
|
$672.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$750.000
|
$850.000
|
$887.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$900.000
|
$850.000
|
$892.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$800.000
|
$950.000
|
$966.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$120.000
|
$100.000
|
$105.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
|
EA
|
292.000
|
$60.000
|
$80.000
|
$84.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
125.000
|
$65.000
|
$80.000
|
$84.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
218.000
|
$30.000
|
$70.000
|
$73.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
258,120.000
|
$0.220
|
$0.150
|
$0.150
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,300.000
|
$3.500
|
$5.350
|
$5.620
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,200.000
|
$1.400
|
$1.150
|
$1.210
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
624.000
|
$2.950
|
$4.500
|
$4.730
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
99,840.000
|
$1.350
|
$1.150
|
$1.210
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
6,455.000
|
$1.500
|
$2.000
|
$0.460
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
6,455.000
|
$1.500
|
$2.000
|
$0.470
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
12.000
|
$6.000
|
$4.850
|
$5.100
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
126,931.000
|
$0.250
|
$0.100
|
$0.090
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
14,250.000
|
$0.250
|
$0.120
|
$0.110
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
40,570.000
|
$0.250
|
$0.100
|
$0.090
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
126,931.000
|
$0.600
|
$0.600
|
$0.620
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
14,250.000
|
$0.600
|
$0.600
|
$0.630
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
40,570.000
|
$0.600
|
$0.600
|
$0.620
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,229.000
|
$3.750
|
$3.500
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
64,530.000
|
$1.000
|
$0.350
|
$0.350
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
650.000
|
$125.000
|
$55.000
|
$106.000
|
|
|
FILTER FABRIC (TY 2)
|
SY
|
25.000
|
$43.000
|
$6.000
|
$10.000
|
|
|
GEOGRID BASE REINFORCEMENT
|
SY
|
98,318.000
|
$3.000
|
$1.750
|
$3.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
34,727.000
|
$100.000
|
$130.000
|
$121.000
|
|
|
TACK COAT
|
GAL
|
47,306.000
|
$4.000
|
$5.000
|
$2.250
|
|
|
CEMENT
|
TON
|
2,581.000
|
$200.000
|
$180.000
|
$200.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
4,729.000
|
$450.000
|
$475.000
|
$690.000
|
|
|
FOAMED ASPHALT TREAT (10")(DC)
|
SY
|
360,333.000
|
$4.000
|
$4.250
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$20,000.000
|
$15,000.000
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,920.000
|
$150.000
|
$210.000
|
$135.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
104.000
|
$150.000
|
$375.000
|
$455.000
|
|
Totals: |
$49,437,214.800
|
$49,745,889.150
|
$51,986,898.430
|