PREPARING ROW
|
AC
|
5.000
|
$2,000.000
|
$50,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
4,500.000
|
$3.000
|
$1.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,438.000
|
$11.000
|
$15.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
6,627.000
|
$25.000
|
$8.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
10,313.000
|
$20.000
|
$5.500
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS)
|
CY
|
78.000
|
$50.000
|
$100.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$125.000
|
$70.000
|
|
|
FL BS (RDWY DEL) (TY A GR 1-2)
|
TON
|
2,988.000
|
$20.000
|
$55.000
|
|
|
CEMENT
|
TON
|
30.000
|
$200.000
|
$310.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
5,201.000
|
$4.000
|
$5.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
780.000
|
$5.000
|
$10.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
1,728.000
|
$2.000
|
$4.000
|
|
|
SHEET PILING (PZ - 40)
|
SF
|
14,530.000
|
$70.000
|
$150.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
130.000
|
$128.000
|
$400.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
410.000
|
$275.000
|
$575.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
48.900
|
$1,200.000
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
31.800
|
$1,400.000
|
$3,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
8.800
|
$1,100.000
|
$5,000.000
|
|
|
CL C CONC (WEBWALL)
|
CY
|
9.400
|
$1,150.000
|
$3,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
8,160.000
|
$24.000
|
$40.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
62.400
|
$600.000
|
$2,500.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
953.920
|
$210.000
|
$325.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
77.000
|
$450.000
|
$725.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
91.000
|
$400.000
|
$750.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
|
LF
|
536.000
|
$75.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
68.000
|
$150.000
|
$300.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
32.000
|
$500.000
|
$1,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,000.000
|
$2,500.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
32.000
|
$45.000
|
$190.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$320,000.000
|
$565,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$10,000.000
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
15.000
|
$30.000
|
$115.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
15.000
|
$15.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
220.000
|
$25.000
|
$42.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
220.000
|
$5.000
|
$14.000
|
|
|
BLADING WORK (EROSION & SEDMT CONT)
|
HR
|
80.000
|
$2,500.000
|
$145.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,194.000
|
$3.250
|
$3.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,194.000
|
$1.000
|
$1.050
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,953.000
|
$55.000
|
$45.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
8.000
|
$5,900.000
|
$3,500.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,120.000
|
$60.000
|
$95.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$70.000
|
$95.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,120.000
|
$8.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.000
|
$15.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
4,080.000
|
$0.200
|
$1.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,600.000
|
$30.000
|
$32.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,800.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,520.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$5.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,500.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$350.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
3,600.000
|
$20.000
|
$15.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$700.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$150.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$30.000
|
$55.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
4.000
|
$30.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
17.000
|
$30.000
|
$60.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
|
EA
|
4.000
|
$300.000
|
$700.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
96.000
|
$4.500
|
$8.750
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,043.000
|
$0.500
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,840.000
|
$0.500
|
$2.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
100.000
|
$1.000
|
$2.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
100.000
|
$1.200
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
100.000
|
$1.250
|
$2.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
4,080.000
|
$0.700
|
$1.400
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
320.000
|
$0.600
|
$2.050
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
3,306.000
|
$0.550
|
$1.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
39.000
|
$3.000
|
$9.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,351.000
|
$0.500
|
$0.650
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
7,386.000
|
$0.100
|
$0.350
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
100.000
|
$88.000
|
$150.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
3,581.000
|
$0.950
|
$2.750
|
|
|
D-GR HMA TY-C SAC-A PG70-22 (EXEMPT)
|
TON
|
1,483.000
|
$122.000
|
$245.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$310.000
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$8,000.000
|
$15,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
216.000
|
$8.000
|
$40.000
|
|
|
TMA (STATIONARY)
|
DAY
|
600.000
|
$285.000
|
$70.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$250.000
|
$375.000
|
|
|
FURNISH ADDITIONAL FLAGGER
|
HR
|
80.000
|
$80.000
|
$35.000
|
|
Totals: |
$3,940,228.550
|
$6,330,873.700
|