Show Job Controls
Bid Cobra

CULBERSON SH 54 (0233-05-038)

Items: 79

County: CULBERSON
Length: N/A
Highway: SH 54
District: EL PASO
Control Number: 0233-05-038
DBE Goal: N/A
Project: BR 2023(245)
Guaranty: N/A
Time: 211 WORKING DAYS
Engineer's Estimate: $3,940,228.55
Date: 11/03/2022 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT BRIDGE
Mail/Deliver Bids To: N/A
CHRISTOPHER WEBER
ALDO MADRID
MONICA RUIZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$3,940,228.55
$6,330,873.70
Over/Under Est: 60.67% $2,390,645.15

Bid Items & Bid Tabulations

79 Total 0 of 79
CULBERSON  |  SH 54  |  EL PASO  |  0233-05-038  |  11/03/2022  |  $3,940,228.55  |  BR 2023(245)  |  CONSTRUCT BRIDGE  |  211 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
PREPARING ROW
AC 5.000 $2,000.000 $50,000.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 4,500.000 $3.000 $1.500
EXCAVATION (ROADWAY)
CY 3,438.000 $11.000 $15.000
EXCAVATION (SPECIAL)
CY 6,627.000 $25.000 $8.500
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 10,313.000 $20.000 $5.500
EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS)
CY 78.000 $50.000 $100.000
PROOF ROLLING
HR 40.000 $125.000 $70.000
FL BS (RDWY DEL) (TY A GR 1-2)
TON 2,988.000 $20.000 $55.000
CEMENT
TON 30.000 $200.000 $310.000
CEMENT TREAT (SUBGRADE)(6")
SY 5,201.000 $4.000 $5.000
PRIME COAT (MULTI OPTION)
GAL 780.000 $5.000 $10.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 1,728.000 $2.000 $4.000
SHEET PILING (PZ - 40)
SF 14,530.000 $70.000 $150.000
DRILL SHAFT (18 IN)
LF 130.000 $128.000 $400.000
DRILL SHAFT (36 IN)
LF 410.000 $275.000 $575.000
CL C CONC (ABUT)(HPC)
CY 48.900 $1,200.000 $2,000.000
CL C CONC (CAP)(HPC)
CY 31.800 $1,400.000 $3,000.000
CL C CONC (COLUMN)(HPC)
CY 8.800 $1,100.000 $5,000.000
CL C CONC (WEBWALL)
CY 9.400 $1,150.000 $3,000.000
REINF CONC SLAB (HPC)
SF 8,160.000 $24.000 $40.000
APPROACH SLAB (HPC)
CY 62.400 $600.000 $2,500.000
PRESTR CONC GIRDER (TX34)
LF 953.920 $210.000 $325.000
RIPRAP (CONC)(CL B)(5 IN)
CY 77.000 $450.000 $725.000
RIPRAP (MOW STRIP)(5 IN)
CY 91.000 $400.000 $750.000
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
LF 536.000 $75.000 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 68.000 $150.000 $300.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 32.000 $500.000 $1,300.000
CLEAN EXIST CULVERTS
EA 1.000 $1,000.000 $2,500.000
REMOV STR (BOX CULVERT)
LF 32.000 $45.000 $190.000
MOBILIZATION
LS 1.000 $320,000.000 $565,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $25,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 15.000 $30.000 $115.000
ROCK FILTER DAMS (REMOVE)
LF 15.000 $15.000 $35.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 220.000 $25.000 $42.500
CONSTRUCTION EXITS (REMOVE)
SY 220.000 $5.000 $14.000
BLADING WORK (EROSION & SEDMT CONT)
HR 80.000 $2,500.000 $145.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,194.000 $3.250 $3.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,194.000 $1.000 $1.050
CONSTRUCTING DETOURS
SY 3,953.000 $55.000 $45.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 8.000 $5,900.000 $3,500.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,120.000 $60.000 $95.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $70.000 $95.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,120.000 $8.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $10.000 $15.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 4,080.000 $0.200 $1.250
MTL W-BEAM GD FEN (TIM POST)
LF 1,600.000 $30.000 $32.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,520.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $5.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $350.000
WIRE FENCE (TY A)
LF 3,600.000 $20.000 $15.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $700.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 7.000 $150.000 $125.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $30.000 $55.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $30.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 17.000 $30.000 $60.000
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
EA 4.000 $300.000 $700.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 96.000 $4.500 $8.750
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 5,043.000 $0.500 $2.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,840.000 $0.500 $2.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 100.000 $1.000 $2.100
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 100.000 $1.200 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 100.000 $1.250 $2.000
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 4,080.000 $0.700 $1.400
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 320.000 $0.600 $2.050
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 3,306.000 $0.550 $1.400
REFL PAV MRKR TY II-A-A
EA 39.000 $3.000 $9.500
ELIM EXT PAV MRK & MRKS (4")
LF 4,351.000 $0.500 $0.650
PAV SURF PREP FOR MRK (4")
LF 7,386.000 $0.100 $0.350
POTHOLE REPAIR (STANDARD)
SY 100.000 $88.000 $150.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 3,581.000 $0.950 $2.750
D-GR HMA TY-C SAC-A PG70-22 (EXEMPT)
TON 1,483.000 $122.000 $245.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $310.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $8,000.000 $15,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 216.000 $8.000 $40.000
TMA (STATIONARY)
DAY 600.000 $285.000 $70.000
TMA (MOBILE OPERATION)
DAY 20.000 $250.000 $375.000
FURNISH ADDITIONAL FLAGGER
HR 80.000 $80.000 $35.000
Totals: $3,940,228.550 $6,330,873.700