PREPARING ROW
|
STA
|
13.700
|
$2,500.000
|
$1,000.000
|
$500.000
|
$4,900.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
293.000
|
$20.000
|
$14.000
|
$20.000
|
$85.000
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-20")
|
SY
|
2,114.000
|
$30.000
|
$16.000
|
$18.000
|
$30.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,700.000
|
$40.000
|
$25.000
|
$25.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
2,016.000
|
$40.000
|
$25.000
|
$25.000
|
$40.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
5,011.000
|
$8.000
|
$0.950
|
$3.000
|
$5.000
|
|
|
ROLL SODDING
|
SY
|
5,011.000
|
$5.000
|
$4.320
|
$7.500
|
$3.980
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
2,507.000
|
$2.500
|
$1.000
|
$1.250
|
$0.980
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
2,507.000
|
$2.500
|
$1.000
|
$1.250
|
$1.030
|
|
|
VEGETATIVE WATERING
|
MG
|
84.000
|
$100.000
|
$65.000
|
$50.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
592.000
|
$95.000
|
$94.000
|
$100.000
|
$156.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
427.000
|
$9.000
|
$8.000
|
$6.000
|
$6.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
1,500.000
|
$10.000
|
$7.000
|
$7.000
|
$25.000
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
34.000
|
$30.000
|
$60.000
|
$90.000
|
$60.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
9.000
|
$1,000.000
|
$340.000
|
$300.000
|
$500.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
105.000
|
$25.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
56.000
|
$200.000
|
$240.000
|
$250.000
|
$200.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
96.000
|
$350.000
|
$305.000
|
$350.000
|
$280.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
26.000
|
$800.000
|
$785.000
|
$700.000
|
$735.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
27.000
|
$400.000
|
$185.000
|
$200.000
|
$240.000
|
|
|
BEDDING MATERIAL (6 IN)
|
CY
|
40.000
|
$350.000
|
$70.000
|
$150.000
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
89.000
|
$150.000
|
$155.000
|
$110.000
|
$127.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
136.000
|
$200.000
|
$155.000
|
$130.000
|
$163.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$2,000.000
|
$1,750.000
|
$1,700.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,500.000
|
$2,000.000
|
$1,950.000
|
$2,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$149,167.820
|
$117,000.000
|
$126,888.000
|
$155,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$10,000.000
|
$8,000.000
|
$9,000.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
175.000
|
$75.000
|
$53.000
|
$45.000
|
$52.450
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
175.000
|
$25.000
|
$20.000
|
$17.000
|
$19.860
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
112.000
|
$50.000
|
$43.550
|
$37.000
|
$43.530
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
112.000
|
$30.000
|
$14.500
|
$17.000
|
$14.470
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
519.000
|
$10.000
|
$8.500
|
$5.500
|
$5.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
519.000
|
$3.000
|
$1.510
|
$2.000
|
$1.510
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,650.000
|
$50.000
|
$21.000
|
$16.000
|
$20.280
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,650.000
|
$40.000
|
$20.000
|
$15.000
|
$19.450
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
402.000
|
$25.000
|
$55.000
|
$45.000
|
$48.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
1,770.000
|
$1.000
|
$6.000
|
$5.000
|
$3.940
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
165.000
|
$15.000
|
$11.000
|
$7.000
|
$2.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$300.000
|
$550.000
|
$500.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$600.000
|
$550.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$35,000.000
|
$10,000.000
|
$30,000.000
|
$8,000.000
|
|
|
IN RD IL (TY SA) 30S-8 (150W EQ) LED
|
EA
|
1.000
|
$4,500.000
|
$4,675.000
|
$4,800.000
|
$4,300.000
|
|
|
IN RD IL (TY SA) 30T-8 (150W EQ) LED
|
EA
|
2.000
|
$4,500.000
|
$5,000.000
|
$5,100.000
|
$4,600.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
4.000
|
$4,500.000
|
$5,350.000
|
$5,400.000
|
$4,900.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
4.000
|
$6,500.000
|
$6,300.000
|
$6,400.000
|
$5,800.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,795.000
|
$25.000
|
$15.000
|
$15.500
|
$14.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
140.000
|
$75.000
|
$60.000
|
$61.000
|
$55.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,120.000
|
$4.000
|
$4.350
|
$4.500
|
$4.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
4,240.000
|
$5.000
|
$5.500
|
$5.500
|
$5.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$2,000.000
|
$2,000.000
|
$2,100.000
|
$1,900.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
361.000
|
$35.000
|
$31.000
|
$68.000
|
$62.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$850.000
|
$725.000
|
$685.000
|
$620.470
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$500.000
|
$600.000
|
$400.000
|
$351.970
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,884.300
|
$12.000
|
$8.500
|
$9.000
|
$8.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
2.000
|
$100.000
|
$100.000
|
$100.000
|
$90.950
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
1.000
|
$300.000
|
$150.000
|
$75.000
|
$65.950
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
3,303.000
|
$2.000
|
$1.300
|
$0.650
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
2,562.000
|
$2.000
|
$1.300
|
$4.200
|
$1.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
70.000
|
$4.000
|
$1.500
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
188.000
|
$2.000
|
$1.900
|
$2.200
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
939.000
|
$2.000
|
$2.720
|
$2.500
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,669.000
|
$3.000
|
$4.350
|
$3.300
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,038.000
|
$10.000
|
$6.520
|
$5.500
|
$8.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
9,321.000
|
$0.300
|
$0.810
|
$0.350
|
$0.400
|
|
|
PAVEMENT SEALER 8"
|
LF
|
939.000
|
$1.000
|
$0.980
|
$0.350
|
$0.400
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,669.000
|
$1.000
|
$1.090
|
$0.850
|
$0.400
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,038.000
|
$2.000
|
$1.090
|
$0.950
|
$0.400
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
241.000
|
$1.000
|
$2.170
|
$2.000
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,922.000
|
$1.000
|
$1.900
|
$1.950
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,970.000
|
$1.000
|
$1.900
|
$1.950
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
162.000
|
$10.000
|
$15.210
|
$5.500
|
$12.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,072.000
|
$0.500
|
$1.790
|
$0.400
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
236.000
|
$2.000
|
$3.260
|
$0.450
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
7,731.000
|
$1.000
|
$0.160
|
$0.200
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
774.000
|
$1.000
|
$0.270
|
$0.200
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,439.000
|
$5.000
|
$0.540
|
$0.250
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,038.000
|
$10.000
|
$0.810
|
$0.250
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
162.000
|
$5.000
|
$1.090
|
$0.300
|
$0.100
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
420.000
|
$200.000
|
$140.000
|
$155.000
|
$250.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
365.000
|
$225.000
|
$230.000
|
$215.000
|
$450.000
|
|
|
BONDING COURSE
|
GAL
|
400.000
|
$20.000
|
$4.250
|
$6.000
|
$30.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$18,000.000
|
$15,000.000
|
$7,000.000
|
$6,500.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
210.000
|
$5.000
|
$4.350
|
$4.500
|
$4.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
3.000
|
$6,500.000
|
$400.000
|
$390.000
|
$350.000
|
|
|
TMA (STATIONARY)
|
DAY
|
56.000
|
$400.000
|
$25.000
|
$250.000
|
$270.630
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
140.000
|
$100.000
|
$5.000
|
$85.000
|
$25.000
|
|
|
SOLAR POWERED LED WARNING SIGN
|
EA
|
7.000
|
$2,000.000
|
$4,750.000
|
$10,000.000
|
$8,500.000
|
|
Totals: |
$1,652,704.720
|
$1,170,676.750
|
$1,268,896.850
|
$1,609,638.550
|