Show Job Controls
Bid Cobra

CORYELL SH 9 (3623-01-008)

Items: 88

County: CORYELL
Length: N/A
Highway: SH 9
District: WACO
Control Number: 3623-01-008
DBE Goal: 550.0%
Project: F 2024(911)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $1,652,704.72
Date: 04/05/2024 (2 years ago)
Contract Number: N/A
Type: INTERCHANGE IMPROVEMENT (NEW OR UP)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,652,704.72
$1,170,676.75
Over/Under Est: -29.17% -$482,027.97
Over/Under Est: -23.22% -$383,807.87
Amt Left: 8.39% $98,220.10
Over/Under Est: -2.61% -$43,066.17
Amt Left: 37.5% $438,961.80
Delta: -26.85% -$340,741.70
Subcontractor Percentage Amount
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 12.81% $179,077.08
TEXAS MATERIALS GROUP, INC. 11.98% $167,474.12
WILKO INDUSTRIAL, L.L.C. 6.82% $95,340.02
D. I. J. CONSTRUCTION, INC. 6.05% $84,575.83
MARCOMS CONSTRUCTION LLC 5.48% $76,607.53
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 3.43% $47,949.60
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.88% $12,301.94
PROFESSIONAL TRAFFIC CONTROL LLC 0.46% $6,430.56
Total: 47.91% $669,756.68

Bid Items & Bid Tabulations

88 Total 0 of 88
CORYELL  |  SH 9  |  WACO  |  3623-01-008  |  04/05/2024  |  $1,652,704.72  |  F 2024(911)  |  INTERCHANGE IMPRV (NEW OR UP)  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 13.700 $2,500.000 $1,000.000 $500.000 $4,900.000
REMOVING CONCRETE(MOW STRIP)
LF 293.000 $20.000 $14.000 $20.000 $85.000
REMOVING STAB BASE & ASPH PAV(15"-20")
SY 2,114.000 $30.000 $16.000 $18.000 $30.000
EXCAVATION (ROADWAY)
CY 2,700.000 $40.000 $25.000 $25.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 2,016.000 $40.000 $25.000 $25.000 $40.000
FURNISHING AND PLACING TOPSOIL (4")
SY 5,011.000 $8.000 $0.950 $3.000 $5.000
ROLL SODDING
SY 5,011.000 $5.000 $4.320 $7.500 $3.980
CELL FBR MLCH SEED(TEMP)(WARM)
SY 2,507.000 $2.500 $1.000 $1.250 $0.980
CELL FBR MLCH SEED(TEMP)(COOL)
SY 2,507.000 $2.500 $1.000 $1.250 $1.030
VEGETATIVE WATERING
MG 84.000 $100.000 $65.000 $50.000 $100.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 592.000 $95.000 $94.000 $100.000 $156.000
PRIME COAT(MC-30 OR AE-P)
GAL 427.000 $9.000 $8.000 $6.000 $6.000
PLANE ASPH CONC PAV (2")
SY 1,500.000 $10.000 $7.000 $7.000 $25.000
PLANE ASPH CONC PAV (6")
SY 34.000 $30.000 $60.000 $90.000 $60.000
FLOWABLE BACKFILL
CY 9.000 $1,000.000 $340.000 $300.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 105.000 $25.000 $10.000 $10.000 $10.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 56.000 $200.000 $240.000 $250.000 $200.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 96.000 $350.000 $305.000 $350.000 $280.000
RIPRAP (CONC)(4 IN)
CY 26.000 $800.000 $785.000 $700.000 $735.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 27.000 $400.000 $185.000 $200.000 $240.000
BEDDING MATERIAL (6 IN)
CY 40.000 $350.000 $70.000 $150.000 $75.000
RC PIPE (CL III)(24 IN)
LF 89.000 $150.000 $155.000 $110.000 $127.000
RC PIPE (CL IV)(24 IN)
LF 136.000 $200.000 $155.000 $130.000 $163.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 6.000 $2,000.000 $1,750.000 $1,700.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,500.000 $2,000.000 $1,950.000 $2,000.000
MOBILIZATION
LS 1.000 $149,167.820 $117,000.000 $126,888.000 $155,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $10,000.000 $8,000.000 $9,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 175.000 $75.000 $53.000 $45.000 $52.450
ROCK FILTER DAMS (REMOVE)
LF 175.000 $25.000 $20.000 $17.000 $19.860
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $50.000 $43.550 $37.000 $43.530
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $30.000 $14.500 $17.000 $14.470
TEMP SEDMT CONT FENCE (INSTALL)
LF 519.000 $10.000 $8.500 $5.500 $5.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 519.000 $3.000 $1.510 $2.000 $1.510
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,650.000 $50.000 $21.000 $16.000 $20.280
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,650.000 $40.000 $20.000 $15.000 $19.450
CONC CURB & GUTTER (TY I)
LF 402.000 $25.000 $55.000 $45.000 $48.000
RUMBLE STRIPS (SHOULDER)
LF 1,770.000 $1.000 $6.000 $5.000 $3.940
REMOVE METAL BEAM GUARD FENCE
LF 165.000 $15.000 $11.000 $7.000 $2.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $300.000 $550.000 $500.000 $500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $600.000 $550.000 $500.000 $500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $1,000.000 $1,100.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $35,000.000 $10,000.000 $30,000.000 $8,000.000
IN RD IL (TY SA) 30S-8 (150W EQ) LED
EA 1.000 $4,500.000 $4,675.000 $4,800.000 $4,300.000
IN RD IL (TY SA) 30T-8 (150W EQ) LED
EA 2.000 $4,500.000 $5,000.000 $5,100.000 $4,600.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 4.000 $4,500.000 $5,350.000 $5,400.000 $4,900.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 4.000 $6,500.000 $6,300.000 $6,400.000 $5,800.000
CONDT (PVC) (SCH 40) (2")
LF 1,795.000 $25.000 $15.000 $15.500 $14.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 140.000 $75.000 $60.000 $61.000 $55.000
ELEC CONDR (NO.8) BARE
LF 2,120.000 $4.000 $4.350 $4.500 $4.000
ELEC CONDR (NO.8) INSULATED
LF 4,240.000 $5.000 $5.500 $5.500 $5.000
GROUND BOX TY A (122311)W/APRON
EA 5.000 $2,000.000 $2,000.000 $2,100.000 $1,900.000
ALUMINUM SIGNS (TY G)
SF 361.000 $35.000 $31.000 $68.000 $62.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $850.000 $725.000 $685.000 $620.470
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $500.000 $600.000 $400.000 $351.970
INSTALL LRSS (STRUCT STEEL)
LB 1,884.300 $12.000 $8.500 $9.000 $8.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $100.000 $100.000 $100.000 $90.950
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 1.000 $300.000 $150.000 $75.000 $65.950
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 3,303.000 $2.000 $1.300 $0.650 $1.250
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 2,562.000 $2.000 $1.300 $4.200 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 70.000 $4.000 $1.500 $2.000 $2.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 188.000 $2.000 $1.900 $2.200 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 939.000 $2.000 $2.720 $2.500 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,669.000 $3.000 $4.350 $3.300 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,038.000 $10.000 $6.520 $5.500 $8.000
PAVEMENT SEALER 6"
LF 9,321.000 $0.300 $0.810 $0.350 $0.400
PAVEMENT SEALER 8"
LF 939.000 $1.000 $0.980 $0.350 $0.400
PAVEMENT SEALER 12"
LF 1,669.000 $1.000 $1.090 $0.850 $0.400
PAVEMENT SEALER 24"
LF 2,038.000 $2.000 $1.090 $0.950 $0.400
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 241.000 $1.000 $2.170 $2.000 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 3,922.000 $1.000 $1.900 $1.950 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 4,970.000 $1.000 $1.900 $1.950 $1.000
REFL PAV MRKR TY II-C-R
EA 162.000 $10.000 $15.210 $5.500 $12.000
ELIM EXT PAV MRK & MRKS (4")
LF 8,072.000 $0.500 $1.790 $0.400 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 236.000 $2.000 $3.260 $0.450 $1.000
PAV SURF PREP FOR MRK (6")
LF 7,731.000 $1.000 $0.160 $0.200 $0.200
PAV SURF PREP FOR MRK (8")
LF 774.000 $1.000 $0.270 $0.200 $0.200
PAV SURF PREP FOR MRK (12")
LF 1,439.000 $5.000 $0.540 $0.250 $0.400
PAV SURF PREP FOR MRK (24")
LF 2,038.000 $10.000 $0.810 $0.250 $0.600
PAV SURF PREP FOR MRK (RPM)
EA 162.000 $5.000 $1.090 $0.300 $0.100
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 420.000 $200.000 $140.000 $155.000 $250.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 365.000 $225.000 $230.000 $215.000 $450.000
BONDING COURSE
GAL 400.000 $20.000 $4.250 $6.000 $30.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $18,000.000 $15,000.000 $7,000.000 $6,500.000
CONDUIT (PREPARE)
LF 210.000 $5.000 $4.350 $4.500 $4.000
GROUND BOX (PREPARE)
EA 3.000 $6,500.000 $400.000 $390.000 $350.000
TMA (STATIONARY)
DAY 56.000 $400.000 $25.000 $250.000 $270.630
TMA (MOBILE OPERATION)
HR 140.000 $100.000 $5.000 $85.000 $25.000
SOLAR POWERED LED WARNING SIGN
EA 7.000 $2,000.000 $4,750.000 $10,000.000 $8,500.000
Totals: $1,652,704.720 $1,170,676.750 $1,268,896.850 $1,609,638.550