Show Job Controls
Bid Cobra

CORYELL CR (0909-39-134)

Items: 42

County: CORYELL
Length: N/A
Highway: CR
District: WACO
Control Number: 0909-39-134
DBE Goal: N/A
Project: BR 2019(328)
Guaranty: N/A
Time: 75 WORKING DAYS
Engineer's Estimate: $588,069.75
Date: 12/01/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$588,069.75
$673,333.00
Over/Under Est: 14.5% $85,263.25
Over/Under Est: 23.27% $136,872.65
Amt Left: 7.66% $51,609.40
Over/Under Est: 34.78% $204,531.85
Amt Left: 17.71% $119,268.60
Delta: -9.33% -$67,659.20
Over/Under Est: 63.63% $374,176.25
Amt Left: 42.91% $288,913.00
Delta: -21.40% -$169,644.40
Over/Under Est: 64.5% $379,291.30
Amt Left: 43.67% $294,028.05
Delta: -0.53% -$5,115.05

Bid Items & Bid Tabulations

42 Total 0 of 42
CORYELL  |  CR  |  WACO  |  0909-39-134  |  12/01/2022  |  $588,069.75  |  BR 2019(328)  |  BRIDGE REPL  |  75 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PMCO CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
KNIFE RIVER CORPORATION - SOUTH
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.
PROJECT ALLIED RESOURCES, LLC
PREPARING ROW
STA 3.900 $4,000.000 $2,500.000 $3,000.000 $6,400.000 $4,300.000 $3,730.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 581.000 $5.000 $10.000 $20.000 $5.000 $26.400 $3.590
EXCAVATION (ROADWAY)
CY 352.000 $20.000 $12.000 $20.000 $35.000 $42.000 $22.000
EXCAVATION (CHANNEL)
CY 730.000 $25.000 $12.000 $15.000 $25.000 $61.000 $23.800
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 3.000 $20.000 $100.000 $50.000 $30.000 $1,000.000 $68.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,500.000 $2.000 $4.000 $1.000 $1.250 $6.000 $2.250
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,500.000 $1.000 $3.000 $2.000 $1.450 $2.000 $1.950
BROADCAST SEED (TEMP) (WARM)
SY 750.000 $1.000 $1.000 $1.000 $2.150 $1.500 $1.370
BROADCAST SEED (TEMP) (COOL)
SY 750.000 $1.000 $1.000 $1.000 $2.150 $1.000 $0.760
VEGETATIVE WATERING
MG 24.400 $25.000 $100.000 $1.000 $30.000 $84.000 $60.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 461.000 $2.000 $4.000 $2.000 $2.500 $3.000 $2.490
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 151.000 $60.000 $100.000 $65.000 $97.000 $172.000 $138.000
PRIME COAT(MC-30 OR AE-P)
GAL 181.000 $9.000 $53.000 $15.000 $12.600 $43.000 $10.400
CEM STABIL BKFL
CY 22.000 $190.000 $225.000 $250.000 $275.000 $225.000 $266.000
DRILL SHAFT (24 IN)
LF 327.000 $180.000 $210.000 $140.000 $225.000 $190.000 $276.000
CL C CONC (ABUT)
CY 19.600 $1,100.000 $1,200.000 $1,400.000 $1,800.000 $1,325.000 $1,720.000
CL C CONC (CAP)
CY 13.200 $1,200.000 $1,600.000 $1,400.000 $1,990.000 $1,800.000 $2,240.000
CL C CONC (COLUMN)
CY 6.700 $1,300.000 $1,500.000 $1,400.000 $2,200.000 $2,100.000 $2,740.000
REINF CONC SLAB (SLAB BEAM)
SF 2,340.000 $19.000 $20.000 $22.000 $25.000 $24.000 $28.200
PRESTR CONC SLAB BEAM (5SB12)
LF 442.500 $185.000 $250.000 $280.000 $285.000 $240.000 $320.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,049.000 $115.000 $110.000 $140.000 $130.000 $220.000 $187.000
RAIL (TY T223)
LF 204.000 $125.000 $130.000 $150.000 $150.000 $220.000 $190.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $20,000.000 $20,000.000 $25,000.000 $30,000.000 $29,900.000
MOBILIZATION
LS 1.000 $54,557.250 $49,300.000 $62,000.000 $79,000.000 $90,000.000 $96,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $500.000 $2,000.000 $7,000.000 $1,500.000 $2,500.000 $2,390.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 182.000 $35.000 $38.000 $1.000 $30.000 $73.000 $66.000
ROCK FILTER DAMS (REMOVE)
LF 182.000 $10.000 $10.000 $1.000 $8.000 $20.000 $17.300
TEMP SEDMT CONT FENCE (INSTALL)
LF 771.000 $3.000 $4.000 $1.000 $6.000 $6.000 $6.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 771.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.870
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $30.000 $39.000 $40.000 $50.000 $210.000 $61.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,250.000 $1,600.000 $1,600.000 $1,600.000 $1,452.000 $2,310.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,100.000 $1,600.000 $1,800.000 $1,650.000 $1,435.000 $2,670.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $900.000 $1,100.000 $1,000.000 $875.000 $1,100.000 $1,640.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,000.000 $3,700.000 $3,600.000 $3,500.000 $3,500.000 $4,250.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 1.000 $11,500.000 $20,000.000 $18,000.000 $25,000.000 $19,000.000 $25,100.000
WIRE FENCE (TY C)
LF 786.000 $20.000 $20.000 $20.000 $16.000 $10.000 $35.300
GATE (TY 1)
EA 1.000 $1,000.000 $1,000.000 $2,000.000 $1,200.000 $7,500.000 $2,950.000
REMOVE SM RD SN SUP&AM
EA 2.000 $100.000 $100.000 $500.000 $50.000 $112.000 $177.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 3.000 $25.000 $45.000 $40.000 $30.000 $22.000 $38.200
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $40.000 $45.000 $40.000 $70.000 $45.000 $61.000
D-GR HMA TY-C SAC-B PG64-22 (EXEMPT)
TON 99.000 $150.000 $309.000 $320.000 $215.000 $362.000 $313.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $100.000 $125.000 $150.000 $125.000 $66.000 $235.000
Totals: $588,069.750 $673,333.000 $724,942.400 $792,601.600 $962,246.000 $967,361.050