PREPARING ROW
|
STA
|
1.000
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
$15,000.000
|
$100,000.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
16.000
|
$12.000
|
$25.000
|
$40.000
|
$20.000
|
$20.000
|
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,241.000
|
$10.000
|
$5.000
|
$9.000
|
$10.000
|
$20.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
16,194.000
|
$8.000
|
$8.000
|
$10.000
|
$11.500
|
$20.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
18,918.000
|
$8.000
|
$8.000
|
$14.000
|
$11.500
|
$5.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
141,846.000
|
$1.000
|
$0.700
|
$1.000
|
$0.750
|
$2.250
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
141,846.000
|
$0.120
|
$0.110
|
$0.140
|
$0.100
|
$0.300
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
70,923.000
|
$0.100
|
$0.080
|
$0.120
|
$0.080
|
$0.300
|
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
70,923.000
|
$0.090
|
$0.080
|
$0.120
|
$0.080
|
$0.300
|
|
|
|
VEGETATIVE WATERING
|
MG
|
2,304.000
|
$14.000
|
$5.000
|
$13.000
|
$14.500
|
$50.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,500.000
|
$1.500
|
$3.000
|
$1.300
|
$1.750
|
$6.500
|
|
|
|
PROOF ROLLING
|
HR
|
27.000
|
$100.000
|
$110.000
|
$85.000
|
$105.000
|
$125.000
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
21,012.000
|
$35.000
|
$32.000
|
$37.000
|
$42.600
|
$45.000
|
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
13,412.000
|
$3.000
|
$3.000
|
$3.000
|
$3.750
|
$4.000
|
|
|
|
ASPH (CRS-2)
|
GAL
|
31,641.000
|
$2.000
|
$2.000
|
$2.950
|
$2.050
|
$4.000
|
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
564.000
|
$105.000
|
$95.000
|
$200.000
|
$154.000
|
$200.000
|
|
|
|
ASPH(AC-15P,AC-20XP,AC10-2TR,AC-12-5TR)
|
GAL
|
1,730.000
|
$3.000
|
$4.000
|
$3.750
|
$4.250
|
$4.000
|
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
40.000
|
$160.000
|
$250.000
|
$255.000
|
$325.000
|
$300.000
|
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
879.000
|
$65.000
|
$75.000
|
$95.000
|
$105.000
|
$110.000
|
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
13,124.000
|
$65.000
|
$60.000
|
$72.000
|
$77.000
|
$85.000
|
|
|
|
D-GR HMA TY-D PG64-22(LEVEL-UP)
|
TON
|
8,203.000
|
$60.000
|
$60.000
|
$75.000
|
$78.000
|
$85.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,000.000
|
$40.000
|
$40.000
|
$45.000
|
$49.000
|
$65.000
|
|
|
|
PLANE ASPH CONC PAV (0" TO 3-1/4")
|
SY
|
889.000
|
$3.500
|
$10.000
|
$20.000
|
$9.000
|
$30.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
23.000
|
$150.000
|
$150.000
|
$140.000
|
$177.000
|
$140.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
24.000
|
$5.000
|
$50.000
|
$8.000
|
$6.000
|
$3.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,252.000
|
$12.000
|
$20.000
|
$35.000
|
$19.000
|
$45.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
71.000
|
$550.000
|
$400.000
|
$450.000
|
$370.000
|
$650.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
56.000
|
$120.000
|
$150.000
|
$75.000
|
$125.000
|
$185.000
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
385.000
|
$115.000
|
$130.000
|
$75.000
|
$110.000
|
$210.000
|
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
12.000
|
$970.000
|
$1,500.000
|
$2,000.000
|
$821.000
|
$1,200.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
624.000
|
$58.000
|
$50.000
|
$60.000
|
$43.000
|
$65.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
586.000
|
$65.000
|
$60.000
|
$70.000
|
$54.000
|
$85.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
52.000
|
$85.000
|
$150.000
|
$125.000
|
$72.000
|
$105.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
48.000
|
$125.000
|
$200.000
|
$160.000
|
$101.000
|
$125.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
3.000
|
$5,000.000
|
$6,000.000
|
$8,500.000
|
$6,190.000
|
$9,000.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,500.000
|
$12,000.000
|
$10,000.000
|
$7,057.000
|
$9,000.000
|
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
1.000
|
$40,000.000
|
$40,000.000
|
$32,000.000
|
$14,437.000
|
$45,000.000
|
|
|
|
WINGWALL (PW - 2) (HW=13 FT)
|
EA
|
1.000
|
$50,000.000
|
$70,000.000
|
$57,000.000
|
$30,000.000
|
$55,000.000
|
|
|
|
WINGWALL (PW - 2) (HW=14 FT)
|
EA
|
1.000
|
$55,000.000
|
$75,000.000
|
$67,000.000
|
$37,500.000
|
$65,000.000
|
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$30,000.000
|
$45,000.000
|
$37,000.000
|
$15,459.000
|
$40,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$875.000
|
$700.000
|
$800.000
|
$925.000
|
$850.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$850.000
|
$900.000
|
$800.000
|
$2,001.000
|
$1,250.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,300.000
|
$1,000.000
|
$1,000.000
|
$2,205.000
|
$1,250.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
19.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
$1,108.000
|
$1,250.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$2,000.000
|
$1,100.000
|
$1,200.000
|
$2,154.000
|
$1,500.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,500.000
|
$1,200.000
|
$1,800.000
|
$2,278.000
|
$2,000.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$1,400.000
|
$2,500.000
|
$3,885.000
|
$2,500.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,500.000
|
$1,600.000
|
$2,500.000
|
$5,363.000
|
$4,000.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$1,000.000
|
$2,500.000
|
$1,500.000
|
$250.000
|
$1,000.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
1,186.000
|
$14.000
|
$10.000
|
$15.000
|
$8.000
|
$30.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$322,000.000
|
$400,000.520
|
$525,000.000
|
$587,060.000
|
$650,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$4,000.000
|
$3,000.000
|
$6,000.000
|
$4,500.000
|
$8,500.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,472.000
|
$28.000
|
$25.000
|
$25.000
|
$21.700
|
$30.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,472.000
|
$8.500
|
$3.000
|
$6.120
|
$6.000
|
$15.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$30.000
|
$10.000
|
$22.440
|
$22.000
|
$40.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.000
|
$3.000
|
$6.120
|
$6.000
|
$20.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,004.000
|
$2.400
|
$3.000
|
$2.260
|
$2.210
|
$4.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,004.000
|
$0.500
|
$0.250
|
$0.260
|
$0.250
|
$2.000
|
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,560.000
|
$10.000
|
$10.000
|
$10.000
|
$12.000
|
$30.000
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,560.000
|
$6.000
|
$6.000
|
$4.000
|
$6.000
|
$20.000
|
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,560.000
|
$9.000
|
$8.000
|
$7.000
|
$12.000
|
$20.000
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,180.000
|
$32.000
|
$36.000
|
$27.000
|
$45.000
|
$35.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
213.000
|
$68.000
|
$80.000
|
$55.000
|
$122.000
|
$85.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,835.000
|
$35.000
|
$30.000
|
$35.000
|
$49.500
|
$35.000
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,025.000
|
$22.000
|
$27.000
|
$20.070
|
$19.670
|
$25.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,600.000
|
$1,800.000
|
$1,374.490
|
$1,347.000
|
$1,850.000
|
|
|
|
SHORT RADIUS
|
LF
|
24.000
|
$31.000
|
$30.000
|
$25.550
|
$25.040
|
$30.000
|
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$650.000
|
$1,000.000
|
$644.950
|
$632.050
|
$1,850.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
925.000
|
$2.250
|
$3.000
|
$1.020
|
$1.000
|
$3.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$2,300.000
|
$2,100.000
|
$2,378.570
|
$2,331.000
|
$2,850.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$275.000
|
$250.000
|
$255.100
|
$250.000
|
$750.000
|
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
5.000
|
$2,000.000
|
$2,000.000
|
$2,295.920
|
$2,250.000
|
$2,500.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$1,700.000
|
$2,000.000
|
$1,836.730
|
$1,800.000
|
$5,000.000
|
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
5.000
|
$1,000.000
|
$1,000.000
|
$2,295.920
|
$2,250.000
|
$2,500.000
|
|
|
|
GATE (TY 1)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$897.440
|
$660.000
|
$1,000.000
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
14.000
|
$200.000
|
$300.000
|
$183.670
|
$180.000
|
$650.000
|
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$235.000
|
$300.000
|
$219.390
|
$215.000
|
$650.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
12.000
|
$710.000
|
$750.000
|
$663.270
|
$650.000
|
$650.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
31.000
|
$300.000
|
$300.000
|
$367.350
|
$360.000
|
$650.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$100.000
|
$250.000
|
$76.530
|
$75.000
|
$100.000
|
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
31.000
|
$200.000
|
$250.000
|
$200.000
|
$190.000
|
$650.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
34.000
|
$40.000
|
$20.000
|
$11.220
|
$11.000
|
$100.000
|
|
|
|
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
|
EA
|
4.000
|
$50.000
|
$50.000
|
$43.320
|
$42.450
|
$100.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
18.000
|
$75.000
|
$50.000
|
$44.750
|
$43.850
|
$100.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
453.000
|
$0.250
|
$0.300
|
$0.160
|
$0.150
|
$1.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
37,010.000
|
$0.130
|
$0.100
|
$0.090
|
$0.090
|
$0.500
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
400.000
|
$0.650
|
$1.000
|
$0.260
|
$0.250
|
$1.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
200.000
|
$0.500
|
$1.000
|
$0.260
|
$0.250
|
$1.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
74.000
|
$5.000
|
$10.000
|
$2.080
|
$2.000
|
$15.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
3.000
|
$50.000
|
$50.000
|
$36.390
|
$35.000
|
$150.000
|
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
3.000
|
$60.000
|
$50.000
|
$36.390
|
$35.000
|
$150.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
1,250.000
|
$0.250
|
$0.150
|
$0.150
|
$0.140
|
$1.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
37,010.000
|
$0.170
|
$0.150
|
$0.150
|
$0.140
|
$0.500
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
129.000
|
$1.000
|
$5.000
|
$1.250
|
$1.200
|
$5.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,301.000
|
$1.000
|
$1.000
|
$1.250
|
$1.200
|
$5.000
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
37.000
|
$0.900
|
$10.000
|
$1.040
|
$1.000
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
643.000
|
$0.800
|
$0.750
|
$0.570
|
$0.550
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
787.000
|
$6.000
|
$6.000
|
$5.930
|
$5.700
|
$12.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
200.000
|
$0.300
|
$1.500
|
$1.040
|
$1.000
|
$1.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
37,315.000
|
$0.300
|
$0.270
|
$0.270
|
$0.260
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
8,725.000
|
$0.300
|
$0.290
|
$0.290
|
$0.280
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
38,432.000
|
$0.300
|
$0.280
|
$0.280
|
$0.270
|
$0.500
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
9.000
|
$210.000
|
$250.000
|
$207.950
|
$200.000
|
$15.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$500.000
|
$550.000
|
$519.890
|
$500.000
|
$15.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$280.000
|
$350.000
|
$311.930
|
$300.000
|
$15.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
45.000
|
$4.000
|
$10.000
|
$5.200
|
$5.000
|
$15.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,033.000
|
$4.000
|
$4.000
|
$3.540
|
$3.400
|
$15.000
|
|
|
|
TRACKLESS TACK COAT
|
GAL
|
14,210.000
|
$2.500
|
$0.000
|
$2.950
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
30.000
|
$85.000
|
$100.000
|
$114.000
|
$92.050
|
$150.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,000.000
|
$9,000.000
|
$17,000.000
|
$16,900.000
|
$16,500.000
|
|
1
|
|
MEMBRANE UNDERSEAL
|
GAL
|
14,210.000
|
$2.500
|
$3.000
|
$0.000
|
$1.900
|
$2.500
|
|
Totals: |
$4,427,182.290
|
$4,345,840.870
|
$5,233,000.060
|
$5,284,854.170
|
$6,812,512.100
|