Show Job Controls
Bid Cobra

CORYELL BU 190E (0231-02-069)

Items: 76

County: CORYELL
Length: 0.0000 MILES
Highway: BU 190E
District: WACO
Control Number: 0231-02-069
DBE Goal: 0.0%
Project: STP 2025(219)VRU
Guaranty: $5,000.00
Time: 40 WORKING DAYS
Engineer's Estimate: $228,378.00
Date: 11/07/2024 (1 year ago)
Contract Number: 11243227
Type: INSTALL RAISED MEDIAN
Project ID: A00194465
Project Description: INSTALL RAISED MEDIAN
Mail/Deliver Bids To: N/A
BILL COMPTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$228,378.00
$315,604.75
Over/Under Est: 38.19% $87,226.75
Over/Under Est: 94.85% $216,617.00
Amt Left: 41% $129,390.25
Subcontractor Percentage Amount
F & W ELECTRICAL CONTRACTORS, INC. 31.84% $100,488.55
FC TRAFFIC CONTROL, INC. 9.21% $29,067.20
LINEAR TRAFFIC MARKINGS LLC 0.00% $0.00
Total: 41.05% $129,555.75

Bid Items & Bid Tabulations

76 Total 0 of 76
CORYELL  |  BU 190E  |  WACO  |  0231-02-069  |  11/07/2024  |  $228,378.00  |  STP 2025(219)VRU  |  INSTL RAISED MEDIAN  |  40 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TIGHT LINE CONSTRUCTION, LLC
RISE UP CONSTRUCTION LLC
PREPARING ROW
STA 3.000 $3,000.000 $3,000.000 $1,000.000
RMV (8"-14") TRT/UNTRT BASE & ASPH PAV
SY 241.000 $25.000 $55.000 $50.000
EMBANK (FNL)(DC)(TY B)
CY 5.000 $50.000 $100.000 $40.000
FURN & PLACE TOPSOIL (4")
SY 88.000 $11.000 $35.000 $50.000
BLOCK SODDING
SY 88.000 $15.000 $10.000 $15.000
VEGETATIVE WATERING
TGL 1.000 $500.000 $100.000 $550.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 3.000 $250.000 $1,000.000 $4,440.000
D-GR HMA TY-D SAC-A PG64-22 (EXEMPT)
TON 8.000 $250.000 $1,000.000 $1,440.000
TACK COAT
GAL 2.000 $6.000 $250.000 $770.000
PLANE ASPH CONC PAV(2")
SY 3.000 $100.000 $1,000.000 $390.000
FLOWABLE BACKFILL
CY 21.000 $325.000 $750.000 $599.000
RIPRAP (CONC)(4 IN)
CY 2.000 $500.000 $1,000.000 $390.000
MOBILIZATION
LS 1.000 $20,000.000 $30,000.000 $10,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $4,000.000 $3,500.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 105.000 $50.000 $100.000 $1.000
TMA (STATIONARY)
DAY 40.000 $275.000 $350.000 $550.000
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $70.000 $110.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $40.000 $1.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $15.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 55.000 $7.500 $10.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 55.000 $2.000 $3.000 $10.000
CONC CURB (TY II)
LF 23.000 $75.000 $100.000 $50.000
CONC SIDEWALKS (4")
SY 9.000 $200.000 $300.000 $299.000
CURB RAMPS (TY 1)
EA 3.000 $2,000.000 $4,000.000 $3,000.000
CURB RAMPS (TY 20)
EA 1.000 $5,000.000 $4,500.000 $4,000.000
CURB RAMPS (TY 21)
EA 1.000 $5,000.000 $4,500.000 $4,000.000
CONC MEDIAN
SY 104.000 $100.000 $125.000 $90.000
CONDT (PVC) (SCH 40) (2")
LF 110.000 $30.000 $30.500 $85.000
CONDT (PVC) (SCH 80) (3")
LF 230.000 $40.000 $48.500 $95.000
CONDUIT (PREPARE)
LF 395.000 $5.000 $11.250 $150.000
ELEC CONDR (NO.8) BARE
LF 340.000 $3.000 $3.250 $177.000
GROUND BOX TY D (162922)
EA 2.000 $2,000.000 $2,200.000 $3,000.000
ALUMINUM SIGNS (TY A)
SF 7.000 $45.000 $250.000 $555.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $850.000 $1,000.000 $2,700.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 81.000 $1.000 $5.250 $9.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 190.000 $1.000 $7.500 $9.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 41.000 $10.000 $16.000 $29.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 2.000 $250.000 $500.000 $655.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 1.000 $250.000 $600.000 $999.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 735.000 $1.000 $5.250 $9.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 50.000 $3.500 $10.000 $4.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 38.000 $3.500 $10.000 $5.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 29.000 $1.500 $2.000 $19.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 639.000 $2.000 $2.500 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 285.000 $8.000 $10.000 $2.000
PAVEMENT SLER 6"
LF 1,075.000 $1.000 $1.000 $6.000
PAVEMENT SLER 8"
LF 639.000 $1.250 $1.000 $2.000
PAVEMENT SLER 24"
LF 285.000 $3.000 $3.500 $4.000
PAVEMENT SLER (ARROW)
EA 4.000 $20.000 $125.000 $65.000
PAVEMENT SLER (WORD)
EA 1.000 $30.000 $125.000 $65.000
PAVEMENT SLER (YLD TRI)
EA 5.000 $25.000 $100.000 $75.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 77.000 $1.500 $2.250 $5.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 969.000 $1.500 $2.250 $5.000
PREFAB PM TY C (W)(ARROW)
EA 4.000 $250.000 $300.000 $500.000
PREFAB PM TY C (W)(WORD)
EA 1.000 $400.000 $375.000 $619.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 5.000 $50.000 $125.000 $118.000
REFL PAV MRKR TY I-C
EA 17.000 $5.000 $10.000 $13.000
REFL PAV MRKR TY II-A-A
EA 40.000 $5.000 $10.000 $14.000
ELIM EXT PM & MRKS (6")
LF 817.000 $2.000 $2.000 $5.000
ELIM EXT PM & MRKS (8")
LF 323.000 $3.000 $2.500 $5.000
ELIM EXT PM & MRKS (24")
LF 76.000 $8.000 $5.000 $15.000
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $250.000 $125.000 $400.000
PAV SURF PREP FOR MRK (6")
LF 1,075.000 $1.000 $1.000 $3.000
PAV SURF PREP FOR MRK (8")
LF 639.000 $1.250 $1.250 $3.000
PAV SURF PREP FOR MRK (24")
LF 285.000 $2.000 $3.250 $6.000
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $10.000 $50.000 $399.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $10.000 $60.000 $150.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 5.000 $8.000 $30.000 $60.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $17,500.000 $30,000.000 $5,000.000
PED SIG SEC (LED)(COUNTDOWN)
EA 6.000 $1,100.000 $1,000.000 $2,000.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 1.000 $350.000 $300.000 $2,000.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 2,140.000 $3.000 $3.000 $5.000
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
LF 2,170.000 $3.250 $4.000 $7.000
PED POLE ASSEMBLY
EA 6.000 $3,250.000 $3,500.000 $3,555.000
PED DETECT PUSH BUTTON (APS)
EA 6.000 $1,250.000 $2,600.000 $2,444.000
GROUND BOX (PREPARE)
EA 6.000 $750.000 $500.000 $2,222.000
Totals: $228,378.000 $315,604.750 $444,995.000