CORYELL BU 190E (0231-02-062)

Items: 117

County: CORYELL
Length: N/A
Highway: BU 190E
District: WACO
Control Number: 0231-02-062
DBE Goal: N/A
Project: NH 2020(690)
Guaranty: N/A
Time: 300 WORKING DAYS
Engineer's Estimate: $5,877,661.22
Date: 09/04/2020 (5 years ago)
Contract Number: N/A
Type: WIDEN PAVEMENT, CONSTRUCT RAISED MEDIAN
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$5,877,661.22
$4,762,516.85
Over/Under Est: -18.97% -$1,115,144.37
Over/Under Est: -8.35% -$490,640.97
Amt Left: 13.11% $624,503.40
$5,394,708.00
Over/Under Est: -8.22% -$482,953.22
Amt Left: 13.27% $632,191.15
Delta: -0.14% -$7,687.75
Over/Under Est: -3.34% -$196,605.97
Amt Left: 19.29% $918,538.40
Delta: -5.31% -$286,347.25
$7,977,791.74
Over/Under Est: 35.73% $2,100,130.52
Amt Left: 67.51% $3,215,274.89
Delta: -40.43% -$2,296,736.49

Bid Items & Bid Tabulations

117 Total 0 of 117
CORYELL  |  BU 190E  |  WACO  |  0231-02-062  |  09/04/2020  |  $5,877,661.22  |  NH 2020(690)  |  WIDEN PAVMT, CONSTRUCT RAISED MEDIAN  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TTG UTILITIES, LP
BIG CREEK CONSTRUCTION, LTD.
TI-ZACK CONCRETE, INC.
TEXAS MATERIALS GROUP, INC.
ALTUS CONSTRUCTION LLC
REMOVING CONC (RIPRAP)
SY 839.000 $15.000 $16.500 $15.000 $20.000 $20.000 $8.930
REMOVING CONC (SIDEWALKS)
SY 1,028.000 $150.000 $14.000 $20.000 $20.000 $15.000 $13.380
REMOVING CONC (DRIVEWAYS)
SY 955.000 $20.000 $17.000 $14.000 $20.000 $28.000 $13.730
REMOVING CONC (CURB OR CURB & GUTTER)
LF 3,890.000 $10.000 $5.600 $7.000 $7.000 $15.000 $8.010
REMOVING CONC (WHEELCHAIR RAMP)
SY 166.000 $20.000 $17.000 $22.000 $20.000 $35.000 $36.670
REMOVING CONC (GND BOX W/ APRON)
EA 2.000 $50.000 $180.000 $1,450.000 $900.000 $1,500.000 $586.880
REMOVING CONC (FLUME)
SY 20.000 $14.000 $18.000 $25.000 $40.000 $35.000 $17.820
REMOVING CONC (MISC)
CY 2.000 $37.000 $90.000 $130.000 $400.000 $310.000 $38.840
REMOVING STAB BASE AND ASPH PAV (6")
SY 3,261.000 $5.000 $5.000 $10.000 $4.000 $20.000 $8.120
REMOVING STAB BASE AND ASPH PAV (10")
SY 2,641.000 $5.700 $6.500 $15.000 $4.000 $20.000 $6.800
REMOVING STAB BASE AND ASPH PAV(6"-9")
SY 1,931.000 $0.290 $6.000 $13.000 $5.000 $20.000 $5.870
EXCAVATION (ROADWAY)
CY 964.000 $15.000 $17.000 $30.000 $45.000 $30.000 $29.340
EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)
CY 962.000 $20.000 $25.000 $30.000 $25.000 $30.000 $46.950
FURNISHING AND PLACING TOPSOIL (4")
SY 3,520.000 $1.000 $4.500 $3.000 $3.000 $5.850 $1.070
BLOCK SODDING
SY 967.000 $4.000 $12.000 $12.500 $10.000 $10.500 $12.910
VEGETATIVE WATERING
MG 7.850 $16.000 $110.000 $25.000 $100.000 $67.000 $176.060
IRRIGATION SYSTEM
LS 1.000 $45,000.000 $70,000.000 $70,000.000 $40,000.000 $61,370.000 $64,556.280
PLANT MATERIAL (1-GAL)
EA 356.000 $5.550 $20.000 $15.000 $13.000 $17.100 $14.090
PLANT MATERIAL (3-GAL)
EA 612.000 $16.630 $40.000 $26.000 $30.000 $34.400 $29.340
MULCH
SY 1,009.000 $2.750 $10.000 $7.500 $8.000 $8.850 $8.220
PLANT BED PREPARATION
SY 980.000 $2.280 $18.000 $7.500 $8.000 $16.350 $8.220
PLANT MATERIAL (10 GAL) (TREE)
EA 61.000 $300.000 $320.000 $120.000 $100.000 $280.060 $117.380
PLANT MATERIAL (3 GAL) (SHRUB)
EA 183.000 $12.550 $35.000 $40.000 $30.000 $32.100 $35.210
PLANT MAINTENANCE
MO 9.000 $4,500.000 $6,400.000 $1,500.000 $2,000.000 $5,600.000 $1,467.190
IRRIGATION SYSTEM OPER AND MAINT
MO 9.000 $1,000.000 $3,400.000 $1,500.000 $1,000.000 $3,000.000 $1,467.190
PROOF ROLLING
HR 14.000 $90.000 $70.000 $100.000 $100.000 $100.000 $234.750
CM TRT(PT MX)(CL L)(TYA)(GR1-2)(FN POS)
CY 1,622.000 $150.000 $55.000 $180.000 $100.000 $265.000 $308.110
D-GR HMA(SQ) TY-B PG64-22
TON 3,815.000 $150.000 $121.000 $90.000 $100.000 $140.000 $171.340
TOM (ASPHALT) PG 76-22
TON 180.000 $130.000 $143.000 $120.000 $150.000 $180.000 $271.580
TOM - F (AGGREGATE) SAC - A
TON 2,467.000 $155.000 $143.000 $120.000 $150.000 $180.000 $228.830
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,000.000 $45.000 $55.000 $55.000 $85.000 $75.000 $123.490
PLANE ASPH CONC PAV (6")
SY 16,382.000 $3.500 $4.500 $6.000 $4.250 $2.000 $6.390
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
SY 57,472.000 $6.400 $1.050 $0.750 $1.500 $1.100 $4.700
STRUCT EXCAV
CY 1,300.000 $7.000 $16.000 $20.000 $5.000 $32.000 $35.210
CEM STABIL BKFL
CY 7.000 $160.000 $210.000 $175.000 $300.000 $300.000 $140.850
TRENCH EXCAVATION PROTECTION
LF 810.000 $20.000 $5.000 $10.000 $11.000 $10.000 $23.480
TEMPORARY SPL SHORING
SF 690.000 $20.000 $38.000 $40.000 $40.000 $34.000 $146.720
CL A CONC (CURB OUTLET)(TY II)
EA 2.000 $2,550.000 $3,200.000 $3,000.000 $3,500.000 $4,500.000 $2,347.500
CL C CONC (MISC)
CY 9.000 $1,000.000 $1,450.000 $775.000 $1,000.000 $3,500.000 $880.310
CL C CONC (RAC-R)
CY 2.000 $3,500.000 $1,580.000 $2,300.000 $2,000.000 $2,700.000 $880.310
RETAINING WALL (STONE)
SF 7,235.000 $75.000 $17.500 $40.000 $75.000 $0.100 $88.030
RIPRAP (CONC)(4 IN)
CY 573.000 $400.000 $335.000 $430.000 $525.000 $300.000 $469.500
STR STEEL (MISC NON - BRIDGE)
LB 1,728.000 $134.000 $5.000 $4.000 $5.000 $18.250 $12.350
RAIL (TY C1W)
LF 52.000 $100.000 $398.000 $520.000 $350.000 $350.000 $310.790
RAIL (HANDRAIL)(TY A)
LF 123.000 $180.000 $112.000 $130.000 $165.000 $245.000 $71.970
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 15.000 $900.000 $995.000 $750.000 $1,700.000 $1,500.000 $1,408.500
RC PIPE (CL III)(18 IN)
LF 25.000 $60.000 $165.000 $180.000 $130.000 $300.000 $158.640
RC PIPE (CL III)(24 IN)
LF 80.000 $80.000 $245.000 $195.000 $225.000 $350.000 $92.490
RC PIPE (CL III)(30 IN)
LF 45.000 $120.000 $350.000 $205.000 $300.000 $400.000 $140.620
RC PIPE (CL III)(36 IN)
LF 10.000 $145.000 $475.000 $275.000 $100.000 $800.000 $199.540
INLET (COMPL)(PCU)(5FT)(LEFT)
EA 1.000 $5,000.000 $5,800.000 $5,000.000 $10,000.000 $14,000.000 $7,993.240
INLET (COMPL)(PCU)(5FT)(RIGHT)
EA 19.000 $5,000.000 $6,400.000 $5,000.000 $10,000.000 $10,000.000 $8,227.990
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $20,000.000 $13,500.000 $28,000.000 $25,000.000 $24,000.000 $30,257.890
ADJUSTING MANHOLES
EA 9.000 $1,000.000 $725.000 $1,350.000 $2,500.000 $1,500.000 $1,446.530
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $900.000 $400.000 $590.000 $1,500.000 $1,200.000 $927.660
ADJUSTING MANHOLES (WATER METER)
EA 6.000 $440.000 $500.000 $400.000 $900.000 $1,200.000 $739.700
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 6.000 $526.000 $985.000 $750.000 $700.000 $1,200.000 $410.190
REMOV STR (INLET)
EA 25.000 $1,300.000 $800.000 $580.000 $1,500.000 $1,300.000 $646.570
REMOV STR (WINGWALL)
EA 1.000 $1,350.000 $1,800.000 $1,500.000 $2,500.000 $2,490.000 $2,529.840
REMOV STR (HEADWALL)
EA 1.000 $1,125.000 $700.000 $1,500.000 $2,300.000 $2,100.000 $1,776.420
REMOV STR (PIPE)
LF 184.000 $18.000 $32.000 $60.000 $30.000 $50.000 $26.410
REMOV STR (BOX CULVERT)
LF 10.000 $59.000 $285.000 $70.000 $100.000 $100.000 $103.120
MOBILIZATION
LS 1.000 $335,000.000 $475,000.000 $524,000.000 $765,000.000 $631,225.000 $792,281.600
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $4,000.000 $3,675.000 $20,000.000 $4,000.000 $16,500.000 $23,475.010
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $30.000 $43.000 $30.000 $20.000 $39.000 $70.430
ROCK FILTER DAMS (REMOVE)
LF 60.000 $9.000 $23.000 $5.000 $20.000 $20.000 $23.480
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $2.000 $7.000 $5.000 $1.000 $8.000 $3.520
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $0.700 $3.300 $1.000 $1.000 $4.000 $1.170
SANDBAGS FOR EROSION CONTROL (8")
LF 470.000 $10.000 $18.000 $8.500 $5.000 $15.400 $9.390
LANDSCAPE PAVERS
SY 1,666.000 $65.000 $62.000 $150.000 $100.000 $74.800 $176.060
CONC CURB (MONO) (TY II)
LF 2,945.000 $7.000 $6.900 $11.000 $25.000 $16.600 $11.740
CONC CURB & GUTTER (TY II)
LF 15,945.000 $35.000 $18.000 $18.000 $25.000 $24.500 $41.080
DRIVEWAYS (CONC) (HES)
SY 2,026.000 $90.000 $90.000 $110.000 $100.000 $75.000 $128.480
INTERSECTIONS (CONC) (FAST TRACK)
SY 1,931.000 $100.000 $90.000 $120.000 $95.000 $133.100 $134.980
CONC SIDEWALKS (5")
SY 3,100.000 $60.000 $55.000 $80.000 $85.000 $60.000 $79.820
CURB RAMPS (TY 1)
EA 5.000 $2,000.000 $1,325.000 $2,750.000 $1,250.000 $1,680.000 $2,875.690
CURB RAMPS (TY 6)
EA 1.000 $4,250.000 $1,325.000 $3,500.000 $1,250.000 $1,680.000 $3,814.690
CURB RAMPS (TY 7)
EA 1.000 $2,350.000 $1,325.000 $2,500.000 $1,250.000 $1,680.000 $2,640.940
CURB RAMPS (TY 10)
EA 12.000 $1,300.000 $1,325.000 $2,250.000 $1,250.000 $1,680.000 $2,376.840
CURB RAMPS (TY 21)
EA 4.000 $2,400.000 $1,325.000 $3,250.000 $1,250.000 $2,620.000 $3,462.560
SIDEWALK CURB DRAIN TY I
EA 1.000 $1,000.000 $4,500.000 $5,000.000 $4,500.000 $4,043.000 $4,108.130
SIDEWALK CURB DRAIN TY II
EA 14.000 $1,000.000 $1,350.000 $2,000.000 $2,500.000 $809.000 $880.310
REMOVE METAL BEAM GUARD FENCE
LF 80.000 $2.500 $6.750 $5.000 $7.000 $3.000 $11.740
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $180.000 $250.000 $550.000 $350.000 $586.880
ALUMINUM SIGNS (TY A)
SF 25.000 $50.000 $58.000 $60.000 $30.000 $50.000 $58.690
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 14.000 $750.000 $520.000 $475.000 $500.000 $450.000 $528.190
RELOCATE SM RD SN SUP & AM TY TEMP
EA 14.000 $244.000 $230.000 $225.000 $350.000 $200.000 $234.750
INSTL OM ASSM (OM-3R)(FLX)SRF
EA 436.000 $280.000 $85.000 $300.000 $215.000 $215.000 $252.020
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 13,900.000 $0.360 $0.400 $0.300 $0.200 $0.350 $2.350
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 210.000 $2.000 $1.150 $2.500 $0.650 $1.000 $5.870
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 4,369.000 $1.300 $0.860 $1.700 $1.000 $0.750 $3.520
WK ZN PAV MRK REMOV (W)(TPL ARROW)
EA 15.000 $350.000 $115.000 $350.000 $300.000 $100.000 $469.500
REFL PAV MRK TY II (W) 8" (SLD)
LF 3,551.000 $0.410 $0.250 $0.500 $0.400 $0.200 $0.700
REFL PAV MRK TY II (W) 24" (SLD)
LF 535.000 $5.600 $2.300 $3.000 $3.300 $2.000 $2.930
REFL PAV MRK TY II (W) (BIKE ARROW)
EA 11.000 $117.600 $23.000 $150.000 $40.000 $20.000 $117.380
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 26,710.000 $0.190 $0.120 $0.450 $0.600 $0.100 $1.170
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,983.000 $0.300 $0.920 $0.500 $0.700 $0.800 $1.170
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,740.000 $0.220 $0.920 $0.500 $0.700 $0.800 $1.170
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 2.000 $350.000 $750.000 $500.000 $350.000 $650.000 $586.880
PREFAB PAV MRK TY C (W) (U-LT ARROW)
EA 42.000 $469.440 $247.000 $200.000 $500.000 $215.000 $234.750
PREFAB PAV MRK TY C (W) (U-ST ARROW)
EA 8.000 $469.440 $247.000 $200.000 $550.000 $215.000 $410.810
PREFAB PAV MRK TY C (W) (WORD)
EA 18.000 $280.000 $518.000 $210.000 $300.000 $450.000 $293.440
REFL PAV MRKR TY II-A-A
EA 16.000 $4.510 $9.200 $20.000 $5.500 $8.000 $7.040
REFL PAV MRKR TY II-C-R
EA 518.000 $4.000 $8.000 $5.000 $5.500 $7.000 $7.040
ELIM EXT PAV MRK & MRKS (4")
LF 24,360.000 $2.000 $0.350 $0.470 $0.500 $0.300 $1.170
ELIM EXT PAV MRK & MRKS (8")
LF 1,700.000 $1.000 $0.690 $1.200 $0.800 $0.600 $1.170
ELIM EXT PAV MRK & MRKS (24")
LF 350.000 $8.000 $4.600 $4.000 $3.300 $4.000 $3.520
LANDSCAPE AMENITY (BOULDER)
EA 47.000 $105.000 $745.000 $500.000 $300.000 $645.000 $352.130
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 8.000 $155.000 $615.000 $300.000 $225.000 $535.000 $234.750
BONDING COURSE
GAL 12,834.000 $3.500 $3.150 $4.000 $2.500 $0.010 $4.190
DIMENSIONAL QUARRIED LIMESTONE
LF 2,538.000 $100.000 $45.000 $65.000 $1.000 $70.000 $51.650
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 258.000 $100.000 $115.000 $75.000 $100.000 $78.000 $82.160
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $11,000.000 $20,000.000 $12,000.000 $4,500.000 $6,500.000 $5,868.750
TMA (STATIONARY)
DAY 400.000 $175.000 $115.000 $200.000 $55.000 $195.000 $293.440
TMA (MOBILE OPERATION)
HR 288.000 $50.000 $1,730.000 $70.000 $60.000 $40.000 $469.500
WTR(RELOCATE FIRE HYDRANT)
EA 1.000 $9,000.000 $4,500.000 $7,500.000 $7,500.000 $4,850.000 $17,606.260
WTR RELOC AIR RELEASE VALVE
EA 1.000 $3,000.000 $3,900.000 $10,000.000 $7,500.000 $4,100.000 $17,606.260
Totals: $5,877,661.220 $4,762,516.850 $5,387,020.250 $5,394,708.000 $5,681,055.250 $7,977,791.741