CORYELL SH 36 (0184-01-063)

Items: 130

County: CORYELL
Length: N/A
Highway: SH 36
District: WACO
Control Number: 0184-01-063
DBE Goal: N/A
Project: C 184-1-63
Guaranty: N/A
Time: 360 WORKING DAYS
Engineer's Estimate: $12,492,719.18
Date: 07/11/2018 (7 years ago)
Contract Number: N/A
Type: WDN RDWY & ADD PASS LNS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$12,492,719.18
$11,187,471.33
Over/Under Est: -10.45% -$1,305,247.85
Over/Under Est: -5.43% -$678,432.35
Amt Left: 5.6% $626,815.50
$12,883,216.14
Over/Under Est: 3.13% $390,496.96
Amt Left: 15.16% $1,695,744.81
Delta: -9.05% -$1,068,929.31
Over/Under Est: 7.76% $968,921.57
Amt Left: 20.33% $2,274,169.42
Delta: -4.49% -$578,424.61
Over/Under Est: 20.43% $2,552,262.12
Amt Left: 34.48% $3,857,509.97
Delta: -11.76% -$1,583,340.55

Bid Items & Bid Tabulations

130 Total 0 of 130
CORYELL  |  SH 36  |  WACO  |  0184-01-063  |  07/11/2018  |  $12,492,719.18  |  C 184-1-63  |  WDN RDWY & ADD PASS LNS  |  360 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
OLDCASTLE MATERIALS TEXAS, INC.
TTG UTILITIES, LP
KNIFE RIVER CORPORATION - SOUTH
JAMES CONSTRUCTION GROUP, L.L.C.
PREPARING ROW
STA 605.000 $1,500.000 $500.000 $525.000 $375.000 $350.000 $1,135.000
REMOVING CONC (DRIVEWAYS)
SY 701.000 $12.000 $10.000 $15.000 $9.200 $15.000 $8.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 43,186.000 $5.000 $3.000 $2.000 $4.800 $1.000 $5.000
EXCAVATION (ROADWAY)
CY 8,189.000 $5.000 $10.000 $7.000 $8.000 $12.750 $10.500
EXCAVATION (CHANNEL)
CY 172.000 $12.280 $40.000 $18.000 $7.700 $20.000 $19.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 31,776.000 $5.000 $10.000 $10.000 $10.000 $12.000 $16.000
FURNISHING AND PLACING TOPSOIL (3")
SY 111,233.000 $0.800 $1.000 $0.600 $1.500 $0.750 $1.800
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 111,233.000 $0.100 $0.120 $0.130 $0.110 $0.110 $0.110
DRILL SEEDING (TEMP) (WARM)
SY 100,108.000 $0.100 $0.070 $0.110 $0.090 $0.060 $0.050
DRILL SEEDING (TEMP) (COOL)
SY 11,127.000 $0.100 $0.100 $0.110 $0.100 $0.090 $0.090
VEGETATIVE WATERING
MG 1,807.000 $10.300 $5.000 $18.000 $37.500 $15.000 $19.230
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 14,352.000 $1.240 $1.500 $0.950 $1.200 $1.100 $1.100
SOIL RETENTION BLANKETS (CL 2) (TY E)
SY 2,236.000 $1.390 $2.500 $2.000 $1.950 $2.200 $2.200
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 29,058.000 $33.000 $30.000 $30.000 $30.000 $33.500 $38.000
PRIME COAT(MC-30 OR AE-P)
GAL 21,770.000 $3.250 $3.400 $2.950 $3.600 $3.400 $3.300
D-GR HMA TY-C SAC-B PG64-22
TON 35,396.000 $60.000 $57.000 $70.000 $80.000 $71.000 $74.200
D-GR HMA TY-D PG64-22(LEVEL-UP)
TON 23,383.000 $60.000 $59.000 $70.000 $86.500 $78.000 $81.320
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 12,712.000 $35.000 $30.000 $40.000 $43.000 $39.000 $40.660
CEM STABIL BKFL
CY 246.000 $84.000 $150.000 $145.000 $191.000 $105.000 $115.000
CUT & RESTORING PAV
SY 206.000 $142.420 $75.000 $100.000 $88.000 $189.000 $71.000
FLOWABLE BACKFILL
CY 122.000 $200.000 $180.000 $160.000 $185.000 $255.000 $255.000
TRENCH EXCAVATION PROTECTION
LF 105.000 $4.300 $25.000 $10.000 $6.000 $12.500 $1.000
TEMPORARY SPL SHORING
SF 13,015.000 $20.000 $22.000 $20.000 $30.000 $20.250 $25.000
RIPRAP (CONC)(4 IN)
CY 94.000 $400.000 $450.000 $450.000 $264.000 $430.000 $520.000
RIPRAP (CONC)(5 IN)
CY 23.000 $425.000 $475.000 $430.000 $340.000 $460.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 629.000 $400.000 $450.000 $500.000 $300.000 $500.000 $550.000
RIPRAP (STONE TY R)(GROUT)(18 IN)
CY 703.000 $350.000 $175.000 $150.000 $125.000 $270.000 $200.000
RIPRAP (STONE TY R)(GROUT)(24 IN)
CY 188.000 $400.000 $200.000 $165.000 $134.000 $330.000 $220.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 24.000 $465.000 $350.000 $295.000 $345.000 $360.000 $600.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 46.000 $525.000 $375.000 $335.000 $400.000 $410.000 $640.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 84.000 $550.000 $425.000 $400.000 $430.000 $460.000 $680.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 52.000 $640.000 $400.000 $370.000 $435.000 $460.000 $650.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 34.000 $660.000 $450.000 $415.000 $470.000 $495.000 $660.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 22.000 $675.000 $650.000 $635.000 $480.000 $510.000 $1,050.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 234.000 $700.000 $500.000 $450.000 $500.000 $560.000 $750.000
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 180.000 $700.000 $550.000 $435.000 $550.000 $610.000 $580.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 26.000 $650.000 $600.000 $540.000 $650.000 $660.000 $880.000
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 150.000 $800.000 $650.000 $540.000 $700.000 $820.000 $750.000
CONC BOX CULV (9 FT X 6 FT)(EXTEND)
LF 104.000 $1,020.000 $700.000 $575.000 $850.000 $920.000 $820.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 48.000 $620.000 $400.000 $350.000 $385.000 $510.000 $550.000
RC PIPE (CL III)(18 IN)
LF 1,294.000 $55.000 $50.000 $45.000 $49.000 $50.000 $58.000
RC PIPE (CL III)(24 IN)
LF 699.000 $62.000 $70.000 $60.000 $67.000 $91.000 $76.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $5,000.000 $3,500.000 $2,800.000 $2,000.000 $3,100.000 $3,800.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 2.000 $5,500.000 $5,000.000 $4,500.000 $2,160.000 $3,100.000 $6,000.000
WINGWALL (PW - 1) (HW=10 FT)
EA 3.000 $27,500.000 $30,000.000 $26,500.000 $17,900.000 $41,000.000 $33,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $9,560.000 $6,500.000 $4,900.000 $6,350.000 $7,200.000 $6,500.000
WINGWALL (PW - 1) (HW=5 FT)
EA 4.000 $10,500.000 $5,000.000 $4,000.000 $6,400.000 $8,300.000 $5,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 4.000 $13,500.000 $9,000.000 $8,200.000 $8,655.000 $12,500.000 $10,500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 8.000 $17,500.000 $10,000.000 $9,400.000 $9,090.000 $14,500.000 $12,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 25.000 $12,000.000 $12,500.000 $12,000.000 $9,550.000 $19,700.000 $15,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $8,000.000 $8,000.000 $7,100.000 $7,300.000 $7,800.000 $9,000.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $9,000.000 $7,500.000 $7,000.000 $7,375.000 $9,300.000 $9,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $8,000.000 $7,500.000 $6,700.000 $8,090.000 $11,400.000 $17,100.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $825.000 $700.000 $610.000 $535.000 $720.000 $800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 99.000 $850.000 $750.000 $680.000 $613.000 $720.000 $900.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 35.000 $1,050.000 $800.000 $690.000 $902.000 $820.000 $850.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,150.000 $900.000 $875.000 $807.000 $925.000 $1,100.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,200.000 $1,800.000 $1,500.000 $1,805.000 $2,050.000 $1,900.000
REMOV STR (SET)
EA 26.000 $490.000 $300.000 $200.000 $250.000 $570.000 $250.000
REMOV STR (HEADWALL)
EA 2.000 $1,300.000 $2,500.000 $500.000 $500.000 $820.000 $630.000
REMOV STR (PIPE)
LF 1,056.000 $10.000 $10.000 $8.000 $12.000 $20.500 $10.000
REMOV STR (BOX CULVERT)
LF 43.000 $115.000 $100.000 $75.000 $68.000 $104.000 $95.000
MOBILIZATION
LS 1.000 $810,000.000 $808,000.000 $999,615.000 $610,000.000 $1,230,000.000 $1,450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $5,000.000 $3,000.000 $3,500.000 $7,400.000 $15,000.000 $30,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,743.000 $25.000 $20.000 $30.000 $32.500 $30.000 $37.000
ROCK FILTER DAMS (REMOVE)
LF 1,743.000 $5.000 $2.000 $8.000 $7.600 $7.000 $8.380
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,240.000 $20.740 $10.000 $20.000 $22.000 $7.500 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 2,240.000 $5.460 $2.000 $7.000 $9.000 $1.500 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 29,839.000 $2.750 $3.000 $2.450 $2.250 $3.500 $3.200
TEMP SEDMT CONT FENCE (REMOVE)
LF 29,839.000 $0.780 $0.250 $0.350 $0.550 $0.350 $0.640
CONSTRUCTING DETOURS
SY 3,575.000 $55.000 $38.000 $38.000 $45.500 $20.000 $45.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 720.000 $130.000 $95.000 $90.000 $160.000 $139.000 $71.000
INTERSECTIONS (ACP)
SY 2,682.000 $32.000 $30.000 $38.000 $35.000 $31.000 $27.690
DRIVEWAYS (CONC)
SY 394.000 $79.120 $100.000 $85.000 $32.000 $114.000 $60.360
DRIVEWAYS (ACP)
SY 7,210.000 $30.000 $25.000 $40.000 $31.000 $33.000 $20.730
TURNOUTS (ACP)
SY 239.000 $31.270 $30.000 $44.000 $35.000 $50.000 $26.650
RUMBLE STRIPS (CENTERLINE)
LF 62,232.500 $0.190 $0.170 $0.080 $0.120 $0.250 $0.120
MTL W-BEAM GD FEN (TIM POST)
LF 3,850.000 $18.800 $23.000 $17.250 $19.000 $17.750 $20.310
MTL W-BEAM GD FEN (STEEL POST)
LF 6,439.000 $20.180 $25.000 $20.000 $22.000 $20.750 $22.100
SHORT RADIUS
LF 1,117.000 $20.500 $23.000 $18.500 $20.000 $19.000 $30.760
DRIVEWAY TERMINAL ANCHOR SECTION
EA 23.000 $671.070 $700.000 $600.000 $650.000 $620.000 $689.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 205.000 $27.000 $25.000 $20.250 $22.000 $21.000 $21.250
MTL W-BEAM GD FEN (SPECIAL)
LF 8,385.000 $18.000 $15.000 $10.000 $11.000 $10.400 $12.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 750.000 $42.000 $60.000 $47.500 $51.500 $49.000 $55.620
MTL BM GD FEN TRANS (31"-28")
EA 6.000 $250.000 $800.000 $500.000 $545.000 $520.000 $782.000
REMOVE METAL BEAM GUARD FENCE
LF 3,850.000 $2.000 $4.000 $3.750 $4.100 $3.900 $1.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 92.000 $1,000.000 $1,250.000 $1,175.000 $1,275.000 $1,200.000 $1,150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 37.000 $225.000 $290.000 $275.000 $216.000 $310.000 $200.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 106.000 $2,165.000 $2,600.000 $2,525.000 $2,740.000 $2,600.000 $2,736.000
WIRE FENCE (TY C)
LF 891.000 $15.000 $10.000 $10.000 $6.000 $12.500 $15.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 66.000 $197.130 $200.000 $200.000 $216.000 $208.000 $149.500
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 8.000 $214.310 $250.000 $200.000 $216.000 $208.000 $212.540
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 6.000 $375.000 $500.000 $450.000 $490.000 $468.000 $375.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 60.000 $418.720 $450.000 $400.000 $433.000 $416.000 $445.400
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 8.000 $416.940 $500.000 $450.000 $490.000 $468.000 $519.260
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 38.000 $461.150 $500.000 $450.000 $490.000 $468.000 $546.190
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 6.000 $623.730 $550.000 $500.000 $540.000 $521.000 $557.280
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 10.000 $638.560 $750.000 $700.000 $758.000 $729.000 $654.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 7.000 $778.400 $750.000 $700.000 $758.000 $729.000 $675.450
RELOCATE SM RD SN SUP & AM TY TEMP
EA 117.000 $198.000 $200.000 $175.000 $190.000 $182.000 $150.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 40.000 $41.270 $70.000 $65.950 $65.000 $62.000 $61.500
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 78.000 $61.610 $70.000 $71.270 $65.000 $62.000 $61.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 386.000 $33.650 $40.000 $30.000 $33.000 $31.000 $24.050
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,994.000 $0.150 $0.220 $0.200 $0.170 $0.210 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 114,254.000 $0.470 $0.220 $0.200 $0.130 $0.210 $0.200
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 432.000 $5.770 $7.000 $6.000 $2.150 $6.250 $6.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 111,332.000 $0.380 $0.220 $0.200 $0.240 $0.210 $0.200
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 320.000 $7.360 $5.000 $4.000 $4.350 $4.170 $4.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 20,933.000 $0.430 $0.540 $0.520 $1.050 $0.540 $0.520
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 20,933.000 $0.430 $0.540 $0.520 $1.050 $0.540 $0.520
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,590.000 $0.680 $1.000 $0.900 $1.750 $1.180 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 12,076.000 $0.640 $1.000 $0.900 $1.750 $1.180 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,033.000 $0.970 $0.750 $0.700 $1.100 $0.730 $0.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 345.000 $5.750 $7.000 $6.000 $7.600 $6.250 $6.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $207.500 $250.000 $200.000 $240.000 $205.000 $200.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $557.670 $500.000 $444.000 $660.000 $460.000 $444.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 8.000 $40.250 $50.000 $47.000 $65.000 $48.500 $47.000
REFL PAV MRKR TY I-C
EA 331.000 $3.000 $5.000 $4.000 $5.500 $4.100 $4.000
REFL PAV MRKR TY II-A-A
EA 2,565.000 $3.000 $3.500 $3.300 $3.550 $3.400 $3.300
ELIM EXT PAV MRK & MRKS (4")
LF 12,800.000 $0.580 $0.400 $0.370 $1.650 $0.380 $0.370
TRACKLESS TACK COAT
GAL 55,289.000 $3.270 $3.300 $0.000 $2.150 $3.490 $2.030
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,235.000 $5,000.000 $12,000.000 $18,000.000 $5,000.000 $4,330.000
REFL PAV MRK AWT (W) (4")(SLD)(125 MIL)
LF 118,799.000 $0.370 $0.550 $0.530 $0.780 $0.550 $0.530
REFL PAV MRK AWT (W) (4")(BRK)(125 MIL)
LF 6,085.000 $0.410 $0.650 $0.600 $0.810 $0.630 $0.600
REFL PAV MRK AWT (W) (4")(DOT)(125 MIL)
LF 1,469.000 $4.260 $0.700 $0.650 $1.100 $0.680 $0.650
REFL PAV MRK AWT (Y) (4")(SLD)(125 MIL)
LF 129,263.000 $0.460 $0.550 $0.530 $0.780 $0.550 $0.530
REFL PAV MRK AWT (Y) (4")(BRK)(125 MIL)
LF 1,240.000 $0.490 $1.000 $0.650 $0.810 $0.680 $0.650
TMA (STATIONARY)
DAY 362.000 $250.000 $150.000 $229.740 $325.000 $250.000 $162.380
TMA (MOBILE OPERATION)
HR 1,380.000 $50.000 $50.000 $22.630 $49.000 $45.000 $26.000
1
MEMBRANE UNDERSEAL
GAL 81,307.000 $2.220 $0.000 $0.010 $0.000 $0.000 $0.000
Totals: $12,673,514.215 $11,187,471.335 $11,814,286.830 $12,883,216.140 $13,461,640.755 $15,044,981.300