Show Job Controls
Bid Cobra

COOKE FM 1630 (1609-01-029)

Items: 96

County: COOKE
Length: N/A
Highway: FM 1630
District: WICHITA FALLS
Control Number: 1609-01-029
DBE Goal: N/A
Project: STP 2B23(120)HES
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $4,347,622.75
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
COLBY SHELTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$4,347,622.75
$4,611,140.62
Over/Under Est: 6.06% $263,517.87
Over/Under Est: 37.18% $1,616,516.11
Amt Left: 29.34% $1,352,998.24
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 3.33% $153,550.98
SOUTHERN CROSS CONTRACTORS, LLC 1.67% $77,006.05
DUSTROL, INC. 1.31% $60,405.94
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.56% $25,822.39
TEXAS TRAFFIC AND BARRICADE, LLC 0.34% $15,677.88
Total: 7.21% $332,463.24

Bid Items & Bid Tabulations

96 Total 0 of 96
COOKE  |  FM 1630  |  WICHITA FALLS  |  1609-01-029  |  06/28/2023  |  $4,347,622.75  |  STP 2B23(120)HES  |  HAZARD ELIM & SAFETY  |  170 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
EUROVIA ATLANTIC COAST LLC
REMOVING CONCRETE(MOW STRIP)
LF 350.000 $12.000 $16.000 $30.000
EXCAVATION (ROADWAY)
CY 4,642.000 $15.000 $15.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 2,252.000 $26.000 $25.000 $70.000
BACKFILL (TY B)
STA 112.000 $140.000 $280.000 $295.000
BLOCK SODDING
SY 540.000 $6.250 $10.000 $8.500
BROADCAST SEED (TEMP) (WARM)
SY 33,000.000 $0.380 $0.150 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 33,000.000 $0.380 $0.150 $0.150
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,390.000 $0.500 $1.500 $1.370
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,390.000 $0.500 $1.500 $1.370
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 33,000.000 $0.380 $0.200 $0.160
VEGETATIVE WATERING
MG 185.000 $25.000 $85.000 $102.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 1,390.000 $3.500 $2.200 $1.850
PROOF ROLLING
HR 50.000 $95.000 $73.000 $125.000
CEMENT
TON 233.000 $165.000 $250.000 $275.000
CEMENT TREAT (SUBGRADE) (8")
SY 15,914.000 $4.250 $7.000 $7.250
PRIME COAT (MC-30)
GAL 3,979.000 $4.250 $2.500 $6.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 8,269.000 $3.750 $3.500 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 10,300.000 $50.000 $55.000 $69.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 1,875.000 $2.850 $8.500 $9.000
TEMPORARY SPL SHORING
SF 1,556.000 $25.000 $15.000 $45.000
RIPRAP (STONE TY R)(DRY)(18 IN)
CY 21.000 $175.000 $150.000 $435.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 21.000 $125.000 $150.000 $410.000
RIPRAP (MOW STRIP)(4 IN)
CY 71.000 $550.000 $870.000 $865.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 8,406.000 $12.000 $5.200 $6.000
CMP (GAL STL 18 IN)
LF 186.000 $65.000 $130.000 $80.000
CMP (GAL STL 24 IN)
LF 65.000 $75.000 $140.000 $95.000
CMP (GAL STL 36 IN)
LF 25.000 $100.000 $200.000 $250.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 60.000 $800.000 $710.000 $1,340.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 28.000 $900.000 $1,000.000 $1,700.000
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
LF 20.000 $900.000 $1,900.000 $3,080.000
RC PIPE (CL III)(18 IN)
LF 128.000 $80.000 $120.000 $90.000
RC PIPE (CL III)(24 IN)
LF 48.000 $95.000 $150.000 $130.000
RC PIPE (CL III)(36 IN)
LF 24.000 $130.000 $240.000 $400.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 6.000 $5,500.000 $4,200.000 $11,500.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $10,000.000 $9,600.000 $21,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 4.000 $10,000.000 $11,700.000 $16,800.000
WINGWALL (PW - 2) (HW=13 FT)
EA 2.000 $75,000.000 $94,600.000 $145,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 14.000 $1,500.000 $1,700.000 $1,250.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 10.000 $1,000.000 $1,700.000 $1,240.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $2,000.000 $2,300.000 $1,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,000.000 $2,000.000 $1,350.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $3,000.000 $2,500.000 $2,700.000
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 2.000 $3,500.000 $4,600.000 $5,500.000
SET (REMOV & REINSTALL)
EA 1.000 $1,000.000 $1,200.000 $2,500.000
REMOV STR (WINGWALL)
EA 2.000 $2,000.000 $4,800.000 $1,500.000
REMOV STR (PIPE)
LF 275.000 $20.000 $40.750 $20.000
MOBILIZATION
LS 1.000 $400,000.000 $440,000.000 $370,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $6,000.000 $18,000.000 $16,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $42.000 $47.250 $47.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $6.000 $29.750 $17.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 530.000 $3.500 $4.200 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 530.000 $1.000 $1.200 $25.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,120.000 $3.500 $3.600 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,120.000 $1.000 $1.200 $1.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $5,500.000 $15,000.000 $12,000.000
DRIVEWAYS (ACP)
SY 1,694.000 $50.000 $29.500 $50.000
TURNOUTS (ACP)
SY 163.000 $50.000 $30.750 $58.000
DRIVEWAYS (BASE)
SY 2,762.000 $25.000 $15.750 $39.000
RUMBLE STRIPS (SHOULDER)
LF 36,616.000 $0.250 $0.250 $0.270
RUMBLE STRIPS (CENTERLINE)
LF 18,308.000 $0.300 $0.250 $0.270
MTL W-BEAM GD FEN (TIM POST)
LF 550.000 $25.000 $21.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,250.000 $2,000.000 $3,400.000
REMOVE METAL BEAM GUARD FENCE
LF 75.000 $5.000 $6.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $150.000 $330.000 $275.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $500.000 $330.000 $275.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,750.000 $3,000.000 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $350.000 $330.000 $275.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 6.000 $500.000 $320.000 $220.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 2.000 $250.000 $340.000 $250.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $900.000 $860.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $850.000 $700.000 $715.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $850.000 $800.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $850.000 $1,000.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $850.000 $1,200.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 28.000 $90.000 $54.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $25.000 $16.000 $15.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 12.000 $95.000 $22.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 60.000 $100.000 $90.000 $110.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 16.000 $100.000 $95.000 $65.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,224.000 $1.500 $2.500 $1.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 100,487.000 $0.550 $0.700 $0.640
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,420.000 $0.600 $0.720 $0.680
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 90,050.000 $0.600 $0.700 $0.640
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 84.000 $16.500 $16.000 $16.000
REFL PAV MRKR TY II-A-A
EA 1,247.000 $4.500 $5.500 $5.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.750 $10,000.000 $33,602.170 $25,000.000
TREE REMOVAL (4" - 12" DIA)
EA 10.000 $500.000 $680.000 $3,000.000
TREE REMOVAL (12" - 18" DIA)
EA 1.000 $500.000 $1,400.000 $5,000.000
TREE REMOVAL (18" - 24" DIA)
EA 4.000 $1,000.000 $2,000.000 $8,000.000
D-GR HMA TY-B PG64-22
TON 3,123.000 $100.000 $90.000 $117.000
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 3,670.000 $100.000 $110.000 $173.000
SP MIXES SP-D SAC-B PG70-28
TON 10,323.000 $115.000 $110.000 $136.000
BONDING COURSE
GAL 6,769.000 $1.250 $1.500 $3.500
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 92.000 $25.000 $9.500 $15.000
TMA (STATIONARY)
DAY 130.000 $500.000 $250.000 $315.000
TMA (MOBILE OPERATION)
DAY 12.000 $500.000 $130.000 $950.000
Totals: $4,347,622.750 $4,611,140.628 $5,964,138.860