REMOVING CONC (RIPRAP)
|
SY
|
235.000
|
$12.000
|
$24.000
|
$35.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,869.000
|
$15.000
|
$35.000
|
$54.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
7,516.000
|
$26.000
|
$20.000
|
$36.000
|
|
|
BLOCK SODDING
|
SY
|
120.000
|
$6.250
|
$4.500
|
$6.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
97,534.000
|
$0.380
|
$0.050
|
$0.120
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
97,534.000
|
$0.380
|
$0.050
|
$0.130
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
97,534.000
|
$0.380
|
$0.140
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
273.000
|
$25.000
|
$60.000
|
$55.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
445.000
|
$10.000
|
$2.250
|
$2.000
|
|
|
PROOF ROLLING
|
HR
|
54.000
|
$95.000
|
$55.000
|
$155.000
|
|
|
CEMENT
|
TON
|
314.000
|
$165.000
|
$175.000
|
$180.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
31,558.000
|
$4.250
|
$4.000
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
16,262.000
|
$3.750
|
$3.000
|
$2.450
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
6,548.000
|
$55.000
|
$35.000
|
$38.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
1,265.000
|
$2.850
|
$7.000
|
$7.550
|
|
|
TEMPORARY SPL SHORING
|
SF
|
388.000
|
$52.500
|
$65.000
|
$60.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
21.000
|
$125.000
|
$265.000
|
$370.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
192.800
|
$550.000
|
$550.000
|
$595.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
226.000
|
$165.000
|
$225.000
|
$237.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
303.000
|
$100.000
|
$53.000
|
$45.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
136.000
|
$65.000
|
$80.000
|
$68.000
|
|
|
CMP (GAL STL 42 IN)
|
LF
|
12.000
|
$350.000
|
$215.000
|
$180.000
|
|
|
CMP (GAL STL 60 IN)
|
LF
|
8.000
|
$425.000
|
$320.000
|
$280.000
|
|
|
CMP (GAL STL 72 IN)
|
LF
|
5.000
|
$500.000
|
$415.000
|
$340.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
30.000
|
$100.000
|
$95.000
|
$80.000
|
|
|
INLET (COMPL)(TY 1)(SPL)
|
EA
|
2.000
|
$2,000.000
|
$4,800.000
|
$4,300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$14,500.000
|
$10,000.000
|
$7,700.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
1.000
|
$16,000.000
|
$16,000.000
|
$14,300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
1.000
|
$18,000.000
|
$22,000.000
|
$19,800.000
|
|
|
HEADWALL (CH - PW - 0)(DIA= 24 IN)(MOD)
|
EA
|
1.000
|
$15,000.000
|
$38,000.000
|
$35,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
20.000
|
$1,500.000
|
$1,300.000
|
$1,260.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$1,200.000
|
$1,100.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$1,800.000
|
$1,500.000
|
$1,375.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
5.000
|
$1,250.000
|
$1,100.000
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$400.000
|
$1,100.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
425.000
|
$30.000
|
$22.000
|
$12.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$411,936.590
|
$300,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$10,000.000
|
$20,000.000
|
$38,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
475.000
|
$42.000
|
$37.000
|
$29.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
475.000
|
$6.000
|
$15.000
|
$9.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,325.000
|
$3.500
|
$2.300
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,325.000
|
$1.000
|
$0.900
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,675.000
|
$3.500
|
$3.000
|
$3.950
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,675.000
|
$1.000
|
$0.800
|
$0.950
|
|
|
DRIVEWAYS (CONC)
|
SY
|
147.000
|
$55.000
|
$75.000
|
$115.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
797.000
|
$55.000
|
$32.000
|
$48.000
|
|
|
TURNOUTS (ACP)
|
SY
|
352.000
|
$50.000
|
$30.000
|
$57.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,824.000
|
$45.000
|
$30.000
|
$28.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
73,090.000
|
$0.240
|
$0.100
|
$0.260
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
36,545.000
|
$0.300
|
$0.100
|
$0.240
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,775.000
|
$25.000
|
$24.900
|
$28.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,250.000
|
$1,800.000
|
$1,999.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,025.000
|
$5.000
|
$2.250
|
$2.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$150.000
|
$212.000
|
$185.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$2,750.000
|
$3,100.000
|
$2,975.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
17.000
|
$350.000
|
$212.000
|
$185.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
11.000
|
$500.000
|
$224.000
|
$465.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$700.000
|
$250.000
|
$595.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$900.000
|
$835.000
|
$865.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
62.000
|
$850.000
|
$582.000
|
$510.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$850.000
|
$922.000
|
$846.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
43.000
|
$90.000
|
$85.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
2.000
|
$35.000
|
$26.500
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
61.000
|
$95.000
|
$31.000
|
$29.000
|
|
|
INSTL OM ASSN (OM-2Z)(WFLX)(WAP)
|
EA
|
5.000
|
$115.000
|
$100.000
|
$68.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
170.000
|
$0.340
|
$1.100
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
28,170.000
|
$0.300
|
$0.350
|
$0.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,826.000
|
$1.500
|
$1.500
|
$1.550
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
73,090.000
|
$0.550
|
$0.400
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,462.000
|
$0.600
|
$0.470
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
61,738.000
|
$0.600
|
$0.410
|
$0.380
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
24.000
|
$16.500
|
$18.000
|
$15.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
895.000
|
$4.300
|
$4.200
|
$3.400
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
6,347.000
|
$95.000
|
$87.000
|
$97.750
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
2,804.000
|
$95.000
|
$90.000
|
$122.000
|
|
|
TACK COAT
|
GAL
|
8,884.000
|
$1.250
|
$2.500
|
$3.850
|
|
|
SP MIXES SP-D SAC-B PG70-28
|
TON
|
12,520.000
|
$95.000
|
$93.000
|
$106.350
|
|
|
TMA (STATIONARY)
|
DAY
|
153.000
|
$500.000
|
$75.000
|
$275.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$500.000
|
$125.000
|
$475.000
|
|
Totals: |
$4,621,302.500
|
$4,085,240.880
|
$4,887,462.620
|