Show Job Controls
Bid Cobra

COOKE FM 1198 (1351-01-016)

Items: 95

County: COOKE
Length: N/A
Highway: FM 1198
District: WICHITA FALLS
Control Number: 1351-01-016
DBE Goal: N/A
Project: F 2023(924)
Guaranty: N/A
Time: 407 WORKING DAYS
Engineer's Estimate: $10,653,672.78
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$10,653,672.78
$12,107,495.99
Over/Under Est: 13.65% $1,453,823.21
$12,328,071.98
Over/Under Est: 15.72% $1,674,399.20
Amt Left: 1.82% $220,575.99
Over/Under Est: 43.72% $4,657,614.86
Amt Left: 26.46% $3,203,791.65
Delta: -24.20% -$2,983,215.66
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 15.95% $1,895,798.23
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 2.62% $311,410.12
SOUTHERN CROSS CONTRACTORS, LLC 1.59% $188,985.53
TRP CONSTRUCTION GROUP, LLC 0.53% $62,995.18
DALLAS LITE AND BARRICADE, INC. 0.45% $53,486.47
JOE'S TREE SERVICE 0.18% $21,394.59
WEST TEXAS ROCK RESOURCES, LLC 0.15% $17,828.82
Total: 21.47% $2,551,898.94

Bid Items & Bid Tabulations

95 Total 0 of 95
COOKE  |  FM 1198  |  WICHITA FALLS  |  1351-01-016  |  06/02/2023  |  $10,653,672.78  |  F 2023(924)  |  SURF/ROADWAY RESTOR  |  407 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EUROVIA ATLANTIC COAST LLC
JAGOE-PUBLIC COMPANY
AUSTIN BRIDGE & ROAD SERVICES, LP
PREPARING ROW
STA 24.000 $6,000.000 $4,000.000 $3,000.000 $8,340.000
REMOVING CONC (CURB)
LF 195.000 $10.000 $27.000 $18.250 $20.380
REMOVING STB BASE AND ASPH PAV(10-14")
SY 19,328.000 $8.000 $6.500 $4.500 $14.910
EXCAVATION (ROADWAY)
CY 10,267.000 $15.000 $22.000 $27.000 $8.200
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 13,763.000 $17.000 $34.000 $40.000 $19.290
COMPOST MANUF TOPSOIL (4")
SY 80,525.000 $1.550 $1.160 $1.750 $1.160
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 80,525.000 $0.120 $0.180 $0.120 $0.180
BROADCAST SEED (TEMP) (WARM)
SY 40,263.000 $0.100 $0.180 $0.120 $0.180
FERTILIZER
AC 29.000 $1,000.000 $500.000 $470.000 $500.000
VEGETATIVE WATERING
MG 2,833.000 $20.000 $58.000 $50.000 $42.000
LIME (HYDRATED LIME (SLURRY))
TON 1,559.000 $295.000 $385.000 $310.000 $330.000
LIME TRT (EXST MATL)(8")
SY 77,374.000 $4.000 $10.500 $10.500 $7.180
PLANE ASPH CONC PAV(0" TO 2")
SY 2,009.000 $8.000 $10.000 $10.000 $16.750
CUT & RESTORING PAV
SY 668.000 $80.000 $155.000 $140.000 $279.700
FLOWABLE BACKFILL
CY 485.000 $200.000 $325.000 $180.000 $380.000
TRENCH EXCAVATION PROTECTION
LF 460.000 $9.000 $10.000 $6.900 $20.000
RIPRAP (CONC)(5 IN)
CY 22.500 $650.000 $1,150.000 $670.000 $1,162.100
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 5.000 $140.000 $715.000 $390.000 $771.960
CONC BOX CULV (3 FT X 3 FT)
LF 112.000 $395.000 $415.000 $390.000 $700.000
CONC BOX CULV (5 FT X 2 FT)
LF 58.000 $580.000 $550.000 $470.000 $800.000
CONC BOX CULV (6 FT X 3 FT)
LF 56.000 $810.000 $760.000 $590.000 $900.000
RC PIPE (CL III)(18 IN)
LF 380.000 $85.000 $60.000 $130.000 $72.000
RC PIPE (CL III)(24 IN)
LF 624.000 $115.000 $84.000 $170.000 $160.000
RC PIPE (CL III)(30 IN)
LF 276.000 $150.000 $122.000 $180.000 $225.000
RC PIPE (CL III)(36 IN)
LF 460.000 $190.000 $185.000 $240.000 $285.000
RC PIPE (CL III)(42 IN)
LF 48.000 $230.000 $230.000 $330.000 $325.000
RC PIPE (CL III)(48 IN)
LF 120.000 $315.000 $382.000 $340.000 $380.000
HEADWALL (CH - FW - 30) (DIA= 24 IN)
EA 2.000 $10,150.000 $9,500.000 $15,500.000 $14,536.620
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $8,000.000 $16,900.000 $12,100.000 $12,506.330
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 5.000 $7,000.000 $21,300.000 $16,900.000 $15,611.510
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $14,700.000 $32,800.000 $27,700.000 $29,329.370
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 2.000 $3,500.000 $12,500.000 $9,500.000 $12,473.630
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 2.000 $10,500.000 $24,000.000 $13,900.000 $19,849.160
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 1.000 $15,000.000 $30,000.000 $19,300.000 $20,849.640
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000 $10,250.000 $17,000.000 $18,800.000 $21,349.100
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $11,000.000 $22,000.000 $28,100.000 $27,767.030
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $18,000.000 $44,000.000 $46,700.000 $31,236.070
SET (PIPE RUNNER ASSEMBLY)
EA 2.000 $2,600.000 $4,000.000 $4,900.000 $5,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 16.000 $900.000 $980.000 $1,500.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 222.000 $650.000 $1,175.000 $1,600.000 $1,200.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $2,500.000 $1,000.000 $2,000.000 $1,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 11.000 $2,000.000 $1,205.000 $2,100.000 $1,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 20.000 $1,800.000 $1,445.000 $2,100.000 $2,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 8.000 $2,500.000 $1,755.000 $2,500.000 $3,000.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $4,100.000 $2,050.000 $2,800.000 $3,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 4.000 $6,100.000 $2,700.000 $3,200.000 $4,000.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 1.000 $7,500.000 $4,600.000 $9,200.000 $4,500.000
REMOV STR (SET)
EA 34.000 $550.000 $200.000 $100.000 $850.000
REMOV STR (PIPE)
LF 3,918.000 $13.500 $12.000 $5.000 $60.000
MOBILIZATION
LS 1.000 $1,082,671.980 $750,000.000 $1,200,000.000 $1,530,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $10,000.000 $21,000.000 $18,500.000 $30,177.600
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 685.000 $24.000 $31.500 $30.000 $31.500
ROCK FILTER DAMS (REMOVE)
LF 685.000 $14.000 $9.000 $15.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,714.000 $3.000 $3.700 $3.400 $3.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,714.000 $0.650 $0.700 $1.000 $0.700
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,255.000 $5.000 $4.390 $3.500 $4.390
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,255.000 $1.200 $0.700 $1.000 $0.700
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 9.000 $4,800.000 $8,500.000 $7,125.000 $15,000.000
DRIVEWAYS (ACP)
SY 5,081.000 $50.000 $40.000 $45.000 $45.850
TURNOUTS (ACP)
SY 534.000 $54.000 $90.000 $35.000 $83.020
DRIVEWAYS (BASE)
SY 10,667.000 $25.000 $31.000 $15.000 $41.080
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 109,405.000 $0.150 $0.220 $0.100 $0.070
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 55,762.000 $0.200 $0.250 $0.100 $0.070
MTL W-BEAM GD FEN (TIM POST)
LF 1,737.500 $26.500 $22.000 $22.000 $21.000
MTL BEAM GD FEN TRANS (T101)
EA 8.000 $500.000 $1,796.000 $1,350.000 $2,759.180
SHORT RADIUS
LF 310.000 $100.000 $49.000 $63.000 $54.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 10.000 $900.000 $1,147.000 $1,100.000 $1,034.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,125.000 $1,100.000 $1,100.000 $1,075.000
REMOVE METAL BEAM GUARD FENCE
LF 630.000 $2.500 $2.000 $2.400 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,100.000 $2,750.000 $3,000.000 $2,850.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 14.000 $310.000 $347.000 $310.000 $347.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 2.000 $560.000 $646.000 $620.000 $646.000
RELOCATE EXISTING MAILBOX
EA 21.000 $350.000 $347.000 $410.000 $347.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 30.000 $705.000 $522.000 $560.000 $522.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 8.000 $700.000 $462.000 $590.000 $462.000
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $700.000 $873.000 $820.000 $873.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 60.000 $25.000 $99.000 $28.250 $23.950
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 15.000 $50.000 $124.000 $120.000 $124.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 60.000 $80.000 $124.000 $120.000 $124.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 3.000 $40.000 $25.000 $40.000 $33.950
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 840.000 $0.960 $6.000 $7.100 $10.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,578.000 $1.250 $1.500 $2.800 $1.250
REFL PAV MRK TY II (W) 6" (SLD)
LF 110,533.000 $0.250 $0.250 $0.260 $0.280
REFL PAV MRK TY II (W) 24" (SLD)
LF 367.000 $5.000 $3.250 $3.260 $5.500
REFL PAV MRK TY II (Y) 6" (BRK)
LF 8,870.000 $0.300 $0.350 $0.360 $0.300
REFL PAV MRK TY II (Y) 6" (SLD)
LF 73,302.000 $0.300 $0.250 $0.260 $0.280
REFL PAV MRKR TY II-A-A
EA 1,412.000 $4.000 $5.500 $6.000 $5.650
D-GR HMA TY-B PG64-22
TON 17,116.000 $105.000 $106.000 $100.000 $150.000
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 5,866.000 $110.000 $127.000 $150.000 $180.000
SP MIXES SP-D PG70-22
TON 20,027.000 $120.000 $132.000 $130.000 $172.000
THERMOPLASTIC PIPE (PP) (18")
LF 4,671.000 $100.000 $50.000 $60.000 $65.000
THERMOPLASTIC PIPE (PP) (24")
LF 419.000 $140.000 $67.500 $90.000 $135.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $14,000.000 $19,000.000 $20,000.000 $25,000.000
TMA (STATIONARY)
DAY 340.000 $290.000 $305.000 $100.000 $424.300
TMA (MOBILE OPERATION)
HR 210.000 $65.000 $90.000 $25.000 $3.000
Totals: $10,653,672.780 $12,107,495.990 $12,328,071.980 $15,311,287.640