PREPARING ROW
|
STA
|
24.000
|
$6,000.000
|
$4,000.000
|
$3,000.000
|
$8,340.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
195.000
|
$10.000
|
$27.000
|
$18.250
|
$20.380
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
19,328.000
|
$8.000
|
$6.500
|
$4.500
|
$14.910
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,267.000
|
$15.000
|
$22.000
|
$27.000
|
$8.200
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
13,763.000
|
$17.000
|
$34.000
|
$40.000
|
$19.290
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
80,525.000
|
$1.550
|
$1.160
|
$1.750
|
$1.160
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
80,525.000
|
$0.120
|
$0.180
|
$0.120
|
$0.180
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
40,263.000
|
$0.100
|
$0.180
|
$0.120
|
$0.180
|
|
|
FERTILIZER
|
AC
|
29.000
|
$1,000.000
|
$500.000
|
$470.000
|
$500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,833.000
|
$20.000
|
$58.000
|
$50.000
|
$42.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
1,559.000
|
$295.000
|
$385.000
|
$310.000
|
$330.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
77,374.000
|
$4.000
|
$10.500
|
$10.500
|
$7.180
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,009.000
|
$8.000
|
$10.000
|
$10.000
|
$16.750
|
|
|
CUT & RESTORING PAV
|
SY
|
668.000
|
$80.000
|
$155.000
|
$140.000
|
$279.700
|
|
|
FLOWABLE BACKFILL
|
CY
|
485.000
|
$200.000
|
$325.000
|
$180.000
|
$380.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
460.000
|
$9.000
|
$10.000
|
$6.900
|
$20.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
22.500
|
$650.000
|
$1,150.000
|
$670.000
|
$1,162.100
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
5.000
|
$140.000
|
$715.000
|
$390.000
|
$771.960
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
112.000
|
$395.000
|
$415.000
|
$390.000
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
58.000
|
$580.000
|
$550.000
|
$470.000
|
$800.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
56.000
|
$810.000
|
$760.000
|
$590.000
|
$900.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
380.000
|
$85.000
|
$60.000
|
$130.000
|
$72.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
624.000
|
$115.000
|
$84.000
|
$170.000
|
$160.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
276.000
|
$150.000
|
$122.000
|
$180.000
|
$225.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
460.000
|
$190.000
|
$185.000
|
$240.000
|
$285.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
48.000
|
$230.000
|
$230.000
|
$330.000
|
$325.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
120.000
|
$315.000
|
$382.000
|
$340.000
|
$380.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 24 IN)
|
EA
|
2.000
|
$10,150.000
|
$9,500.000
|
$15,500.000
|
$14,536.620
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$8,000.000
|
$16,900.000
|
$12,100.000
|
$12,506.330
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
5.000
|
$7,000.000
|
$21,300.000
|
$16,900.000
|
$15,611.510
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$14,700.000
|
$32,800.000
|
$27,700.000
|
$29,329.370
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$3,500.000
|
$12,500.000
|
$9,500.000
|
$12,473.630
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$10,500.000
|
$24,000.000
|
$13,900.000
|
$19,849.160
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
1.000
|
$15,000.000
|
$30,000.000
|
$19,300.000
|
$20,849.640
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$10,250.000
|
$17,000.000
|
$18,800.000
|
$21,349.100
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$11,000.000
|
$22,000.000
|
$28,100.000
|
$27,767.030
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$18,000.000
|
$44,000.000
|
$46,700.000
|
$31,236.070
|
|
|
SET (PIPE RUNNER ASSEMBLY)
|
EA
|
2.000
|
$2,600.000
|
$4,000.000
|
$4,900.000
|
$5,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
16.000
|
$900.000
|
$980.000
|
$1,500.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
222.000
|
$650.000
|
$1,175.000
|
$1,600.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$1,000.000
|
$2,000.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
11.000
|
$2,000.000
|
$1,205.000
|
$2,100.000
|
$1,800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$1,800.000
|
$1,445.000
|
$2,100.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$2,500.000
|
$1,755.000
|
$2,500.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$4,100.000
|
$2,050.000
|
$2,800.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$6,100.000
|
$2,700.000
|
$3,200.000
|
$4,000.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$7,500.000
|
$4,600.000
|
$9,200.000
|
$4,500.000
|
|
|
REMOV STR (SET)
|
EA
|
34.000
|
$550.000
|
$200.000
|
$100.000
|
$850.000
|
|
|
REMOV STR (PIPE)
|
LF
|
3,918.000
|
$13.500
|
$12.000
|
$5.000
|
$60.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,082,671.980
|
$750,000.000
|
$1,200,000.000
|
$1,530,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$10,000.000
|
$21,000.000
|
$18,500.000
|
$30,177.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
685.000
|
$24.000
|
$31.500
|
$30.000
|
$31.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
685.000
|
$14.000
|
$9.000
|
$15.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,714.000
|
$3.000
|
$3.700
|
$3.400
|
$3.700
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,714.000
|
$0.650
|
$0.700
|
$1.000
|
$0.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,255.000
|
$5.000
|
$4.390
|
$3.500
|
$4.390
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,255.000
|
$1.200
|
$0.700
|
$1.000
|
$0.700
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
9.000
|
$4,800.000
|
$8,500.000
|
$7,125.000
|
$15,000.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,081.000
|
$50.000
|
$40.000
|
$45.000
|
$45.850
|
|
|
TURNOUTS (ACP)
|
SY
|
534.000
|
$54.000
|
$90.000
|
$35.000
|
$83.020
|
|
|
DRIVEWAYS (BASE)
|
SY
|
10,667.000
|
$25.000
|
$31.000
|
$15.000
|
$41.080
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
109,405.000
|
$0.150
|
$0.220
|
$0.100
|
$0.070
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
55,762.000
|
$0.200
|
$0.250
|
$0.100
|
$0.070
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,737.500
|
$26.500
|
$22.000
|
$22.000
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
8.000
|
$500.000
|
$1,796.000
|
$1,350.000
|
$2,759.180
|
|
|
SHORT RADIUS
|
LF
|
310.000
|
$100.000
|
$49.000
|
$63.000
|
$54.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$900.000
|
$1,147.000
|
$1,100.000
|
$1,034.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,125.000
|
$1,100.000
|
$1,100.000
|
$1,075.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
630.000
|
$2.500
|
$2.000
|
$2.400
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$3,100.000
|
$2,750.000
|
$3,000.000
|
$2,850.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
14.000
|
$310.000
|
$347.000
|
$310.000
|
$347.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
2.000
|
$560.000
|
$646.000
|
$620.000
|
$646.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
21.000
|
$350.000
|
$347.000
|
$410.000
|
$347.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
30.000
|
$705.000
|
$522.000
|
$560.000
|
$522.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
8.000
|
$700.000
|
$462.000
|
$590.000
|
$462.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$700.000
|
$873.000
|
$820.000
|
$873.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
|
EA
|
60.000
|
$25.000
|
$99.000
|
$28.250
|
$23.950
|
|
|
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
|
EA
|
15.000
|
$50.000
|
$124.000
|
$120.000
|
$124.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
60.000
|
$80.000
|
$124.000
|
$120.000
|
$124.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
3.000
|
$40.000
|
$25.000
|
$40.000
|
$33.950
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
840.000
|
$0.960
|
$6.000
|
$7.100
|
$10.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,578.000
|
$1.250
|
$1.500
|
$2.800
|
$1.250
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
110,533.000
|
$0.250
|
$0.250
|
$0.260
|
$0.280
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
367.000
|
$5.000
|
$3.250
|
$3.260
|
$5.500
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
8,870.000
|
$0.300
|
$0.350
|
$0.360
|
$0.300
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
73,302.000
|
$0.300
|
$0.250
|
$0.260
|
$0.280
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,412.000
|
$4.000
|
$5.500
|
$6.000
|
$5.650
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
17,116.000
|
$105.000
|
$106.000
|
$100.000
|
$150.000
|
|
|
D-GR HMA TY-D PG70-28 (LEVEL-UP)
|
TON
|
5,866.000
|
$110.000
|
$127.000
|
$150.000
|
$180.000
|
|
|
SP MIXES SP-D PG70-22
|
TON
|
20,027.000
|
$120.000
|
$132.000
|
$130.000
|
$172.000
|
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
4,671.000
|
$100.000
|
$50.000
|
$60.000
|
$65.000
|
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
419.000
|
$140.000
|
$67.500
|
$90.000
|
$135.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$14,000.000
|
$19,000.000
|
$20,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
340.000
|
$290.000
|
$305.000
|
$100.000
|
$424.300
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
210.000
|
$65.000
|
$90.000
|
$25.000
|
$3.000
|
|
Totals: |
$10,653,672.780
|
$12,107,495.990
|
$12,328,071.980
|
$15,311,287.640
|