PREPARING ROW
|
STA
|
18.000
|
$1,000.000
|
$1,015.000
|
$1,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
138.000
|
$14.000
|
$24.510
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(6"-9")
|
SY
|
9,878.000
|
$5.000
|
$6.320
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,078.000
|
$9.000
|
$10.400
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
2,667.000
|
$9.000
|
$19.000
|
$15.000
|
|
|
BACKFILL (TY B)
|
STA
|
278.000
|
$180.000
|
$151.000
|
$200.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
18.000
|
$175.000
|
$64.000
|
$200.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
35,413.000
|
$0.100
|
$0.080
|
$0.080
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
35,413.000
|
$0.100
|
$0.080
|
$0.080
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
70,821.000
|
$0.150
|
$0.110
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
600.000
|
$25.000
|
$34.000
|
$29.250
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
403.000
|
$165.000
|
$172.000
|
$165.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
18,647.000
|
$4.000
|
$4.350
|
$6.500
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
2,178.000
|
$3.500
|
$3.560
|
$4.500
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
4,279.000
|
$80.000
|
$71.000
|
$73.000
|
|
|
SUPERPAVE MIXTURES SP-D PG70-22
|
TON
|
17,648.000
|
$85.000
|
$84.500
|
$86.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
4,234.000
|
$30.000
|
$32.500
|
$32.000
|
|
|
CEM STABIL BKFL
|
CY
|
68.000
|
$125.000
|
$129.100
|
$210.000
|
|
|
CUT & RESTORING PAV
|
SY
|
135.000
|
$80.000
|
$114.650
|
$75.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
69.000
|
$4.000
|
$12.020
|
$11.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,669.000
|
$12.000
|
$14.340
|
$50.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
14.000
|
$470.000
|
$578.720
|
$1,600.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
41.000
|
$120.000
|
$116.810
|
$240.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
68.000
|
$100.000
|
$115.660
|
$220.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
609.000
|
$435.000
|
$664.610
|
$525.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
569.000
|
$65.000
|
$58.440
|
$49.250
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
38.000
|
$70.000
|
$73.910
|
$87.500
|
|
|
CONC BOX CULVERT (10 FT X 4 FT)(EXTEND)
|
LF
|
7.000
|
$1,500.000
|
$961.110
|
$1,425.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
13.000
|
$55.000
|
$81.980
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
59.000
|
$75.000
|
$110.180
|
$93.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
195.000
|
$100.000
|
$145.180
|
$126.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
65.000
|
$130.000
|
$184.270
|
$192.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
3.000
|
$2,750.000
|
$3,515.690
|
$4,925.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$5,500.000
|
$6,336.290
|
$6,575.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
2.000
|
$38,000.000
|
$63,606.280
|
$37,200.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$13,800.000
|
$23,548.590
|
$15,325.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
32.000
|
$900.000
|
$1,059.970
|
$1,050.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$854.340
|
$1,015.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$900.000
|
$854.340
|
$1,050.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$880.000
|
$1,143.810
|
$1,325.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$964.130
|
$1,150.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$1,238.470
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,175.000
|
$1,238.470
|
$1,275.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,250.000
|
$1,118.020
|
$1,150.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,300.000
|
$1,231.000
|
$1,285.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,300.000
|
$2,617.740
|
$2,675.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,400.000
|
$1,080.930
|
$875.000
|
|
|
REMOV STR (PIPE)
|
LF
|
341.000
|
$16.000
|
$6.910
|
$11.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
18.000
|
$50.000
|
$195.530
|
$110.000
|
|
|
REMOV STR (PIPE)
|
EA
|
17.000
|
$350.000
|
$145.230
|
$225.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$373,529.460
|
$420,000.000
|
$225,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$5,000.000
|
$4,000.000
|
$17,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
880.000
|
$28.000
|
$27.650
|
$27.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
880.000
|
$7.000
|
$10.400
|
$10.250
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,165.000
|
$3.000
|
$1.980
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,165.000
|
$0.700
|
$0.460
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,950.000
|
$3.500
|
$3.180
|
$3.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,950.000
|
$1.000
|
$0.570
|
$0.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,148.000
|
$65.000
|
$22.500
|
$25.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$5,000.000
|
$4,421.030
|
$20,000.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
170.000
|
$85.000
|
$64.300
|
$110.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,843.000
|
$30.000
|
$15.570
|
$15.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,371.000
|
$35.000
|
$30.600
|
$27.750
|
|
|
TURNOUTS (ACP)
|
SY
|
299.000
|
$40.000
|
$32.440
|
$90.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
82,767.000
|
$0.110
|
$0.090
|
$0.130
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
41,383.000
|
$0.090
|
$0.110
|
$0.140
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
10,013.000
|
$20.000
|
$21.050
|
$20.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,970.000
|
$1,684.200
|
$1,625.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
100.000
|
$62.000
|
$57.890
|
$56.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
2.000
|
$568.000
|
$526.310
|
$500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
10,113.000
|
$3.000
|
$2.630
|
$2.600
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$200.000
|
$236.840
|
$225.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$2,600.000
|
$2,368.410
|
$2,275.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$260.000
|
$236.840
|
$230.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
17.000
|
$240.000
|
$236.840
|
$250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$600.000
|
$500.000
|
$535.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$700.000
|
$578.950
|
$625.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$800.000
|
$552.630
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
23.000
|
$500.000
|
$421.050
|
$450.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$90.000
|
$78.950
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
53.000
|
$100.000
|
$63.160
|
$67.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
18.000
|
$200.000
|
$100.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$35.000
|
$26.320
|
$28.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
96.000
|
$4.000
|
$5.260
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
7,380.000
|
$1.000
|
$0.630
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
22.000
|
$11.000
|
$10.530
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
76,090.000
|
$1.000
|
$0.630
|
$0.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,420.000
|
$0.900
|
$0.470
|
$1.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
83,421.000
|
$0.270
|
$0.440
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
15,638.000
|
$0.300
|
$0.440
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
65,560.000
|
$0.270
|
$0.440
|
$0.450
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
118.000
|
$5.500
|
$8.420
|
$4.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
133.000
|
$13.000
|
$24.740
|
$12.500
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$560.000
|
$1,052.630
|
$555.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4,059.000
|
$2.750
|
$3.160
|
$3.350
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
24,890.000
|
$0.450
|
$0.730
|
$0.220
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
66.000
|
$0.500
|
$6.320
|
$10.000
|
|
|
TREE TRIMMING
|
MI
|
4.773
|
$3,500.000
|
$3,681.870
|
$4,300.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
66.000
|
$20.000
|
$26.320
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
130.000
|
$150.000
|
$465.000
|
$625.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$350.000
|
$825.000
|
$850.000
|
|
Totals: |
$4,197,267.070
|
$4,439,662.486
|
$4,531,807.470
|