COOKE FM 922 (0845-03-064)

Items: 101

County: COOKE
Length: N/A
Highway: FM 922
District: WICHITA FALLS
Control Number: 0845-03-064
DBE Goal: N/A
Project: STP 1902(068)HES
Guaranty: N/A
Time: 137 WORKING DAYS
Engineer's Estimate: $4,197,267.07
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$4,197,267.07
$4,439,662.48
Over/Under Est: 5.78% $242,395.41
Over/Under Est: 7.97% $334,540.40
Amt Left: 2.08% $92,144.99

Bid Items & Bid Tabulations

101 Total 0 of 101
COOKE  |  FM 922  |  WICHITA FALLS  |  0845-03-064  |  06/04/2019  |  $4,197,267.07  |  STP 1902(068)HES  |  SAFETY TRT FXD OBJ, ADDL SURF WIDTH,...  |  137 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
EUROVIA ATLANTIC COAST LLC
PREPARING ROW
STA 18.000 $1,000.000 $1,015.000 $1,500.000
REMOVING CONC (DRIVEWAYS)
SY 138.000 $14.000 $24.510 $30.000
REMOVING STAB BASE AND ASPH PAV(6"-9")
SY 9,878.000 $5.000 $6.320 $7.000
EXCAVATION (ROADWAY)
CY 7,078.000 $9.000 $10.400 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 2,667.000 $9.000 $19.000 $15.000
BACKFILL (TY B)
STA 278.000 $180.000 $151.000 $200.000
SPEC EXCAV WORK (BACKHOE)
HR 18.000 $175.000 $64.000 $200.000
BROADCAST SEED (TEMP) (WARM)
SY 35,413.000 $0.100 $0.080 $0.080
BROADCAST SEED (TEMP) (COOL)
SY 35,413.000 $0.100 $0.080 $0.080
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 70,821.000 $0.150 $0.110 $0.100
VEGETATIVE WATERING
MG 600.000 $25.000 $34.000 $29.250
LIME (HYDRATED LIME (DRY))
TON 403.000 $165.000 $172.000 $165.000
LIME TRT (SUBGRADE)(8")
SY 18,647.000 $4.000 $4.350 $6.500
EMULS ASPH (EROSN CONT)(SS-1)
GAL 2,178.000 $3.500 $3.560 $4.500
D-GR HMA(SQ) TY-B PG64-22
TON 4,279.000 $80.000 $71.000 $73.000
SUPERPAVE MIXTURES SP-D PG70-22
TON 17,648.000 $85.000 $84.500 $86.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 4,234.000 $30.000 $32.500 $32.000
CEM STABIL BKFL
CY 68.000 $125.000 $129.100 $210.000
CUT & RESTORING PAV
SY 135.000 $80.000 $114.650 $75.000
TRENCH EXCAVATION PROTECTION
LF 69.000 $4.000 $12.020 $11.000
TEMPORARY SPL SHORING
SF 1,669.000 $12.000 $14.340 $50.000
RIPRAP (CONC)(5 IN)
CY 14.000 $470.000 $578.720 $1,600.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 41.000 $120.000 $116.810 $240.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 68.000 $100.000 $115.660 $220.000
RIPRAP (MOW STRIP)(4 IN)
CY 609.000 $435.000 $664.610 $525.000
CMP (GAL STL 18 IN)
LF 569.000 $65.000 $58.440 $49.250
CMP (GAL STL 24 IN)
LF 38.000 $70.000 $73.910 $87.500
CONC BOX CULVERT (10 FT X 4 FT)(EXTEND)
LF 7.000 $1,500.000 $961.110 $1,425.000
RC PIPE (CL III)(18 IN)
LF 13.000 $55.000 $81.980 $60.000
RC PIPE (CL III)(24 IN)
LF 59.000 $75.000 $110.180 $93.000
RC PIPE (CL III)(30 IN)
LF 195.000 $100.000 $145.180 $126.000
RC PIPE (CL III)(36 IN)
LF 65.000 $130.000 $184.270 $192.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 3.000 $2,750.000 $3,515.690 $4,925.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 2.000 $5,500.000 $6,336.290 $6,575.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $38,000.000 $63,606.280 $37,200.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $13,800.000 $23,548.590 $15,325.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 32.000 $900.000 $1,059.970 $1,050.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $1,000.000 $854.340 $1,015.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $900.000 $854.340 $1,050.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $880.000 $1,143.810 $1,325.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,000.000 $964.130 $1,150.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,500.000 $1,238.470 $1,250.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $1,175.000 $1,238.470 $1,275.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $1,250.000 $1,118.020 $1,150.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $1,300.000 $1,231.000 $1,285.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 1.000 $1,300.000 $2,617.740 $2,675.000
REMOV STR (WINGWALL)
EA 4.000 $1,400.000 $1,080.930 $875.000
REMOV STR (PIPE)
LF 341.000 $16.000 $6.910 $11.000
REMOV STR (BOX CULVERT)
LF 18.000 $50.000 $195.530 $110.000
REMOV STR (PIPE)
EA 17.000 $350.000 $145.230 $225.000
MOBILIZATION
LS 1.000 $373,529.460 $420,000.000 $225,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $4,000.000 $17,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 880.000 $28.000 $27.650 $27.000
ROCK FILTER DAMS (REMOVE)
LF 880.000 $7.000 $10.400 $10.250
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,165.000 $3.000 $1.980 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,165.000 $0.700 $0.460 $0.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,950.000 $3.500 $3.180 $3.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,950.000 $1.000 $0.570 $0.500
CONSTRUCTING DETOURS
SY 1,148.000 $65.000 $22.500 $25.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $5,000.000 $4,421.030 $20,000.000
DRIVEWAYS (CONC)
SY 170.000 $85.000 $64.300 $110.000
DRIVEWAYS (ACP)
SY 1,843.000 $30.000 $15.570 $15.000
DRIVEWAYS (SURF TREAT)
SY 1,371.000 $35.000 $30.600 $27.750
TURNOUTS (ACP)
SY 299.000 $40.000 $32.440 $90.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 82,767.000 $0.110 $0.090 $0.130
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 41,383.000 $0.090 $0.110 $0.140
MTL W-BEAM GD FEN (TIM POST)
LF 10,013.000 $20.000 $21.050 $20.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,970.000 $1,684.200 $1,625.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 100.000 $62.000 $57.890 $56.000
MTL BM GD FEN TRANS (31"-28")
EA 2.000 $568.000 $526.310 $500.000
REMOVE METAL BEAM GUARD FENCE
LF 10,113.000 $3.000 $2.630 $2.600
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $200.000 $236.840 $225.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,600.000 $2,368.410 $2,275.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $260.000 $236.840 $230.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 17.000 $240.000 $236.840 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $600.000 $500.000 $535.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $700.000 $578.950 $625.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $800.000 $552.630 $600.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 23.000 $500.000 $421.050 $450.000
REMOVE SM RD SN SUP&AM
EA 26.000 $90.000 $78.950 $85.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 53.000 $100.000 $63.160 $67.000
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 18.000 $200.000 $100.000 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $35.000 $26.320 $28.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 96.000 $4.000 $5.260 $6.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 7,380.000 $1.000 $0.630 $0.700
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 22.000 $11.000 $10.530 $6.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 76,090.000 $1.000 $0.630 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,420.000 $0.900 $0.470 $1.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 83,421.000 $0.270 $0.440 $0.420
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 15,638.000 $0.300 $0.440 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 65,560.000 $0.270 $0.440 $0.450
PREFAB PAV MRK TY C (W) (8") (SLD)
LF 118.000 $5.500 $8.420 $4.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 133.000 $13.000 $24.740 $12.500
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $560.000 $1,052.630 $555.000
REFL PAV MRKR TY II-A-A
EA 4,059.000 $2.750 $3.160 $3.350
ELIM EXT PAV MRK & MRKS (4")
LF 24,890.000 $0.450 $0.730 $0.220
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 66.000 $0.500 $6.320 $10.000
TREE TRIMMING
MI 4.773 $3,500.000 $3,681.870 $4,300.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 66.000 $20.000 $26.320 $200.000
TMA (STATIONARY)
DAY 130.000 $150.000 $465.000 $625.000
TMA (MOBILE OPERATION)
DAY 20.000 $350.000 $825.000 $850.000
Totals: $4,197,267.070 $4,439,662.486 $4,531,807.470