Bid Cobra

COOKE FM 372 (0815-01-053)

Items: 107

County: COOKE
Length: 0.0000 MILES
Highway: FM 372
District: WICHITA FALLS
Control Number: 0815-01-053
DBE Goal: 0.0%
Project: STP 2026(344)HES
Guaranty: $100,000.00
Time: 321 WORKING DAYS
Engineer's Estimate: $5,976,727.05
Date: 02/04/2026 (4 months ago)
Contract Number: 2263014
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00207610
Contract Type: Federal
Project Description: SAFETY TREAT FIXED OBJECTS, MILLED EDGELINE RUMBLE STRIPS, PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED CENTERLINE RUMBLE STRIPS (TARGETED)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
COLBY SHELTON
AARON BLOOM
MADISON HAVERKAMP
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$5,976,727.05
$5,255,697.32
Over/Under Est: -12.06% -$721,029.73
Over/Under Est: 8.74% $522,314.01
Amt Left: 23.66% $1,243,343.74
$6,674,167.00
Over/Under Est: 11.67% $697,439.95
Amt Left: 26.99% $1,418,469.68
Delta: -2.69% -$175,125.94
Over/Under Est: 14.64% $874,880.85
Amt Left: 30.37% $1,595,910.58
Delta: -2.66% -$177,440.90
Over/Under Est: 30.4% $1,816,731.61
Amt Left: 48.29% $2,537,761.34
Delta: -13.75% -$941,850.76
Over/Under Est: 31.47% $1,881,130.45
Amt Left: 49.51% $2,602,160.18
Delta: -0.83% -$64,398.84
Over/Under Est: 33.54% $2,004,631.61
Amt Left: 51.86% $2,725,661.34
Delta: -1.57% -$123,501.16
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 16.22% $852,474.11
S & D CONSTRUCTORS INC. 4.97% $261,208.16
MARCOMS CONSTRUCTION LLC 1.48% $77,784.32
CIVIL TREE SOLUTIONS, LLC 1.29% $67,798.50
LINEAR TRAFFIC MARKINGS LLC 1.24% $65,170.65
DALLAS LITE AND BARRICADE, INC. 0.70% $36,789.88
DUSTIN ALLEN, INC. 0.08% $4,204.56
Total: 25.98% $1,365,430.18

Bid Items & Bid Tabulations

107 Total 0 of 107
COOKE  |  FM 372  |  WICHITA FALLS  |  0815-01-053  |  02/04/2026  |  $5,976,727.05  |  STP 2026(344)HES  |  HAZARD ELIM & SAFETY  |  321 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OVERLAND CORPORATION
EUROVIA ATLANTIC COAST LLC
JAGOE-PUBLIC COMPANY
FOUTSCO PAVING COMPANY, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
GARRET SHIELDS INFRASTRUCTURE
PEACHTREE CONSTRUCTION, LTD.
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 7.000 $400.000 $725.000 $500.000 $1,000.000 $750.000 $725.000 $500.000 $775.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 3.000 $800.000 $1,850.000 $850.000 $3,000.000 $1,500.000 $1,820.000 $1,500.000 $2,000.000
PREP ROW (TREE PRUNE AND TRIM)
STA 128.000 $2,500.000 $417.000 $300.000 $420.000 $250.000 $417.000 $2,000.000 $475.000
REMOV CONC (RIPRAP)
SY 21.000 $25.000 $23.750 $71.000 $50.000 $20.000 $23.750 $40.000 $23.500
REMOV CONC (DRIVEWAYS)
SY 70.000 $25.000 $31.300 $34.000 $32.000 $25.000 $31.300 $40.000 $31.000
REMOV CONC (CURB)
LF 820.000 $5.000 $16.200 $18.000 $5.000 $8.000 $15.000 $20.000 $16.000
EXCAV (ROADWAY)
CY 1,925.000 $20.000 $37.000 $43.000 $75.000 $6.000 $40.000 $30.000 $32.000
EXCAV (CHANNEL)
CY 18.000 $35.000 $17.000 $150.000 $100.000 $40.000 $128.110 $40.000 $105.000
EMBANK (FNL)(OC)(TY B)
CY 9,166.000 $25.000 $25.000 $45.000 $55.000 $13.000 $50.000 $50.000 $50.000
BACKFILL (TY B)
STA 78.000 $150.000 $159.000 $350.000 $220.000 $200.000 $229.760 $150.000 $605.000
BROADCAST SEED (TEMP_WARM)
SY 31,711.000 $0.200 $0.150 $0.110 $0.050 $0.100 $0.110 $0.100 $0.140
BROADCAST SEED (TEMP_COOL)
SY 31,711.000 $0.200 $0.150 $0.160 $0.050 $0.010 $0.110 $0.100 $0.140
DRILL SEED (PERM_RURAL_SAND)
SY 63,409.000 $0.150 $0.230 $0.160 $0.200 $0.150 $0.180 $0.100 $0.170
VEGETATIVE WATERING
TGL 544.500 $25.000 $25.000 $55.000 $100.000 $40.000 $52.000 $10.000 $95.000
CEMENT
TON 411.000 $270.000 $245.000 $225.000 $250.000 $225.000 $350.150 $250.000 $280.000
CEMENT TRT (EXIST MATL)(8")
SY 28,335.000 $4.000 $2.500 $4.500 $7.000 $5.000 $5.590 $8.000 $11.000
PRIME COAT (MC-30)
GAL 7,084.000 $5.250 $3.650 $7.650 $1.500 $0.100 $4.090 $6.200 $8.000
EMULS ASPH (EROSN CONT)(MS-2)
GAL 6,294.000 $3.500 $2.000 $3.500 $1.500 $0.100 $1.800 $6.500 $6.000
D-GR HMA TY-B PG64-22
TON 5,194.000 $98.000 $88.000 $105.000 $90.000 $150.000 $130.000 $170.000 $165.000
D-GR HMA TY-C PG64-22 (LEVEL-UP)
TON 1,668.000 $125.000 $105.000 $150.000 $100.000 $155.000 $140.000 $200.000 $214.000
D-GR HMA TY-C SAC-B PG70-28
TON 13,310.000 $105.000 $101.500 $126.000 $110.000 $148.000 $153.000 $160.000 $136.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 13,524.000 $25.000 $35.000 $40.500 $35.000 $45.000 $45.000 $20.000 $57.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 3,006.000 $2.500 $5.000 $7.500 $7.000 $3.000 $2.360 $8.200 $6.500
CUT & RESTORING PAV
SY 48.000 $75.000 $152.000 $255.000 $210.000 $55.000 $108.000 $350.000 $850.000
FLOWABLE BACKFILL
CY 57.000 $175.000 $302.400 $280.000 $500.000 $250.000 $302.400 $200.000 $300.000
TRENCH EXCAVATION PROTECTION
LF 91.000 $10.000 $1.080 $1.000 $5.000 $25.000 $1.080 $1.000 $1.050
TEMPORARY SPL SHORING
SF 2,551.000 $35.000 $32.400 $44.000 $25.000 $65.000 $32.400 $50.000 $32.000
CL C CONC (COLLAR)
EA 4.000 $1,500.000 $1,944.000 $1,800.000 $800.000 $2,000.000 $1,944.000 $1,000.000 $1,900.000
CONC STR REPAIR (STANDARD)
SF 7.000 $250.000 $432.000 $400.000 $220.000 $250.000 $432.000 $150.000 $430.000
RIPRAP (MOW STRIP)(5 IN)
CY 48.000 $550.000 $739.800 $769.000 $1,000.000 $650.000 $848.850 $600.000 $735.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 255.000 $225.000 $253.800 $329.000 $190.000 $383.000 $253.800 $200.000 $250.000
CMP (GAL STL 18 IN)
LF 560.000 $95.000 $59.400 $55.000 $70.000 $75.000 $59.400 $80.000 $59.000
CMP (GAL STL 24 IN)
LF 216.000 $115.000 $75.600 $70.000 $90.000 $85.000 $75.600 $120.000 $75.000
CONC BOX CULV (4 FT X 3 FT)
LF 127.000 $300.000 $405.000 $375.000 $370.000 $500.000 $405.000 $500.000 $400.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 7.000 $850.000 $1,404.000 $1,300.000 $500.000 $730.000 $1,404.000 $500.000 $1,400.000
RC PIPE (CL III)(18 IN)
LF 80.000 $85.000 $91.800 $85.000 $80.000 $90.000 $91.800 $80.000 $90.000
RC PIPE (CL III)(24 IN)
LF 90.000 $125.000 $104.760 $97.000 $100.000 $105.000 $104.760 $120.000 $104.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 1.000 $12,500.000 $5,540.400 $5,130.000 $8,000.000 $7,250.000 $6,073.900 $2,000.000 $5,500.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $15,000.000 $7,182.000 $6,650.000 $6,000.000 $9,750.000 $7,715.490 $3,000.000 $7,100.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $15,000.000 $13,608.000 $12,600.000 $20,000.000 $16,500.000 $18,000.000 $8,000.000 $13,500.000
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $20,000.000 $15,660.000 $14,500.000 $24,000.000 $18,500.000 $22,000.000 $10,000.000 $15,250.000
WINGWALL (PW - 2) (HW=9 FT)
EA 1.000 $70,000.000 $38,880.000 $36,000.000 $50,000.000 $45,000.000 $50,000.000 $20,000.000 $38,500.000
WINGWALL (PW - 2) (HW=10 FT)
EA 2.000 $78,000.000 $63,720.000 $59,000.000 $60,000.000 $65,000.000 $80,000.000 $30,000.000 $63,000.000
WINGWALL (PW - 2) (HW=11 FT)
EA 1.000 $80,000.000 $62,640.000 $58,000.000 $62,000.000 $68,500.000 $80,000.000 $30,000.000 $62,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $15,000.000 $11,880.000 $11,000.000 $26,000.000 $10,500.000 $15,000.000 $10,000.000 $11,750.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 49.000 $1,500.000 $1,296.000 $1,200.000 $2,600.000 $1,250.000 $1,296.000 $1,000.000 $1,250.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,800.000 $1,166.400 $1,080.000 $2,300.000 $1,400.000 $1,166.400 $1,500.000 $1,150.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 5.000 $1,700.000 $1,528.200 $1,415.000 $2,800.000 $1,500.000 $1,528.200 $1,500.000 $1,530.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 8.000 $1,800.000 $1,771.200 $1,640.000 $3,100.000 $1,650.000 $1,771.200 $1,500.000 $1,700.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,000.000 $1,598.400 $1,480.000 $2,800.000 $1,650.000 $1,598.400 $1,500.000 $1,550.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,200.000 $1,846.800 $1,710.000 $3,200.000 $1,650.000 $1,846.800 $1,500.000 $1,750.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $3,000.000 $5,400.000 $5,000.000 $9,000.000 $3,500.000 $5,400.000 $2,000.000 $5,300.000
SET (REMOV & REINSTALL)
EA 3.000 $500.000 $540.000 $500.000 $900.000 $700.000 $840.000 $500.000 $540.000
REMOV & RE - LAY PIPE (18 IN)
LF 57.000 $50.000 $64.800 $60.000 $90.000 $80.000 $64.800 $100.000 $63.000
REMOV & RE - LAY PIPE (24 IN)
LF 12.000 $75.000 $97.200 $90.000 $100.000 $90.000 $97.200 $120.000 $95.000
CLEAN EXIST CULVERTS
EA 7.000 $2,500.000 $3,340.000 $3,100.000 $2,000.000 $3,500.000 $3,340.000 $2,000.000 $3,350.000
REMOV STR (SET)
EA 54.000 $750.000 $216.000 $200.000 $1,000.000 $400.000 $216.000 $500.000 $215.000
REMOV STR (WINGWALL)
EA 4.000 $1,000.000 $972.000 $900.000 $8,000.000 $1,000.000 $972.000 $2,000.000 $970.000
REMOV STR (HEADWALL)
EA 6.000 $1,500.000 $972.000 $900.000 $10,000.000 $1,000.000 $972.000 $2,000.000 $970.000
REMOV STR (PIPE)
LF 1,009.000 $25.000 $10.800 $10.000 $50.000 $12.000 $10.800 $10.000 $10.500
REMOV STR (BOX CULVERT)
LF 8.000 $50.000 $864.000 $800.000 $1,000.000 $100.000 $864.000 $500.000 $855.000
MOBILIZATION
LS 1.000 $529,366.100 $582,000.000 $420,000.000 $741,000.000 $650,000.000 $860,000.000 $600,000.000 $650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $8,000.000 $2,000.000 $20,500.000 $20,000.000 $20,000.000 $30,000.000 $5,000.000 $25,000.000
TMA (STATIONARY)
DAY 353.000 $250.000 $183.330 $350.000 $50.000 $1.000 $1.000 $300.000 $350.000
TMA (MOBILE OPERATION)
DAY 20.000 $250.000 $875.000 $715.000 $50.000 $1.000 $300.000 $300.000 $750.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 150.000 $45.000 $44.600 $42.000 $42.000 $42.000 $42.000 $20.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 150.000 $15.000 $11.000 $15.000 $15.000 $10.000 $15.000 $5.000 $18.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,185.000 $3.950 $3.390 $4.220 $4.250 $1.000 $4.220 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,185.000 $1.000 $0.840 $0.750 $0.800 $0.500 $0.750 $1.000 $0.950
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 2,670.000 $4.750 $3.740 $5.000 $5.000 $1.000 $5.000 $5.000 $7.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,670.000 $1.250 $0.840 $1.200 $1.250 $0.500 $1.200 $1.000 $0.950
DRIVEWAYS (CONC)
SY 109.000 $125.000 $140.400 $171.000 $180.000 $180.000 $152.410 $120.000 $135.000
DRIVEWAYS (ACP)
SY 3,905.000 $55.000 $39.000 $42.000 $60.000 $50.000 $65.000 $140.000 $58.000
DRIVEWAYS (BASE)
SY 3,304.000 $25.000 $19.000 $23.000 $22.000 $35.000 $45.000 $15.000 $30.000
TURNOUTS (ACP)
SY 1,405.000 $50.000 $36.000 $79.000 $40.000 $70.000 $65.000 $260.000 $58.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 73,931.000 $0.250 $0.200 $0.200 $0.150 $0.200 $0.200 $0.200 $0.220
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 36,966.000 $0.300 $0.200 $0.200 $0.150 $0.200 $0.200 $0.200 $0.220
MTL W-BEAM GD FEN (TIM POST)
LF 1,400.000 $26.000 $20.890 $23.000 $20.000 $23.000 $20.250 $40.000 $24.500
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,500.000 $1,025.640 $780.000 $1,000.000 $780.000 $1,025.000 $1,500.000 $840.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,000.000 $1,025.000 $1,125.000 $1,000.000 $1,125.000 $1,025.000 $1,500.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 1,375.000 $3.000 $2.000 $3.000 $2.000 $3.000 $2.000 $5.000 $3.250
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $450.000 $200.640 $200.000 $200.000 $200.000 $200.000 $500.000 $215.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,500.000 $2,850.000 $2,950.000 $2,900.000 $2,950.000 $2,850.000 $3,500.000 $3,150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $200.000 $250.000 $200.000 $250.000 $200.000 $500.000 $270.000
WIRE FENCE (TY C)
LF 100.000 $50.000 $14.750 $60.000 $15.000 $54.000 $30.000 $30.000 $16.000
WIRE FENCE (REMOVE)
LF 100.000 $20.000 $2.400 $10.000 $2.500 $16.000 $10.000 $1.000 $2.500
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 17.000 $350.000 $220.000 $220.000 $220.000 $220.000 $365.570 $300.000 $230.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 31.000 $300.000 $190.000 $190.000 $190.000 $190.000 $335.570 $300.000 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 28.000 $825.000 $520.000 $520.000 $500.000 $520.000 $520.000 $800.000 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 10.000 $800.000 $565.000 $565.000 $600.000 $565.000 $565.000 $800.000 $610.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 103.000 $650.000 $340.000 $340.000 $340.000 $340.000 $340.000 $500.000 $365.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 14.000 $350.000 $120.000 $120.000 $120.000 $120.000 $120.000 $800.000 $127.000
REMOVE SM RD SN SUP&AM
EA 74.000 $120.000 $90.000 $90.000 $90.000 $90.000 $90.000 $200.000 $96.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 14.000 $50.000 $50.000 $50.000 $50.000 $50.000 $50.000 $100.000 $54.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 22.000 $50.000 $61.000 $45.000 $31.000 $25.000 $50.000 $12.000 $27.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 62.000 $125.000 $59.000 $59.000 $60.000 $59.000 $59.000 $35.000 $63.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,052.000 $0.850 $1.430 $1.250 $2.250 $1.000 $1.000 $2.350 $3.500
PAVEMENT SLER 6"
LF 460.000 $0.500 $0.200 $0.170 $0.170 $0.200 $0.200 $0.250 $0.180
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 74,446.000 $0.550 $0.490 $0.500 $0.500 $0.490 $0.490 $0.600 $0.540
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 9,050.000 $0.550 $0.510 $0.500 $0.500 $0.510 $0.510 $0.600 $0.540
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 37,288.000 $0.550 $0.500 $0.500 $0.500 $0.500 $0.500 $0.600 $0.540
PREFAB PM TY C (W)(24")(SLD)
LF 200.000 $15.000 $11.000 $12.750 $13.000 $11.000 $11.000 $13.000 $13.750
REFL PAV MRKR TY II-A-A
EA 752.000 $3.500 $3.550 $5.000 $5.000 $3.550 $3.550 $4.200 $5.300
ELIM EXT PM & MRKS (4")
LF 460.000 $0.500 $1.000 $0.340 $0.300 $1.000 $1.000 $1.200 $0.370
PAV SURF PREP FOR MRK (6")
LF 460.000 $0.500 $0.300 $0.010 $0.010 $0.300 $0.300 $0.350 $0.020
DRIFTWOOD REMOVAL
CY 45.000 $150.000 $43.000 $475.000 $43.000 $1,000.000 $43.000 $100.000 $46.000
BONDING COURSE
GAL 7,604.000 $5.000 $4.200 $3.500 $1.000 $1.000 $4.000 $5.000 $2.250
Totals: $5,976,727.050 $5,255,697.320 $6,499,041.060 $6,674,167.000 $6,851,607.900 $7,793,458.660 $7,857,857.500 $7,981,358.660
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $4,000.00