COOKE FM 51 (0312-01-076)

Items: 93

County: COOKE
Length: N/A
Highway: FM 51
District: WICHITA FALLS
Control Number: 0312-01-076
DBE Goal: N/A
Project: BR 2022(425)
Guaranty: N/A
Time: 285 WORKING DAYS
Engineer's Estimate: $4,931,327.76
Date: 04/06/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (8)
E
Engineer's Estimate
$4,931,327.76
$4,761,917.35
Over/Under Est: -3.44% -$169,410.41
$5,261,522.00
Over/Under Est: 6.7% $330,194.24
Amt Left: 10.49% $499,604.65
$5,447,050.30
Over/Under Est: 10.46% $515,722.54
Amt Left: 14.39% $685,132.95
Delta: -3.53% -$185,528.30
Over/Under Est: 13.65% $673,271.59
Amt Left: 17.7% $842,682.00
Delta: -2.89% -$157,549.05
Over/Under Est: 20.04% $988,332.05
Amt Left: 24.31% $1,157,742.46
Delta: -5.62% -$315,060.46
Over/Under Est: 20.59% $1,015,402.51
Amt Left: 24.88% $1,184,812.92
Delta: -0.46% -$27,070.46
Over/Under Est: 23.99% $1,183,013.94
Amt Left: 28.4% $1,352,424.35
Delta: -2.82% -$167,611.43
Over/Under Est: 47.68% $2,351,177.14
Amt Left: 52.93% $2,520,587.55
Delta: -19.11% -$1,168,163.20

Bid Items & Bid Tabulations

93 Total 0 of 93
COOKE  |  FM 51  |  WICHITA FALLS  |  0312-01-076  |  04/06/2022  |  $4,931,327.76  |  BR 2022(425)  |  BRIDGE REPL  |  285 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INDUS ROAD & BRIDGE, INC.
IBCTX, LLC
EARTH BUILDERS, L.P.
SEMA CONSTRUCTION, INC.
ED BELL CONSTRUCTION COMPANY
ZACHRY CONSTRUCTION CORPORATION
HODGES AND SON CONSTRUCTION COMPANY, INC.
MARIO SINACOLA & SONS EXCAVATING, INC.
REMOVING CONC (CURB)
LF 20.000 $10.000 $35.000 $150.000 $15.000 $20.000 $100.000 $40.390 $50.000 $20.000
REMOVING STAB BASE & ASPH PAV (18")
SY 5,287.000 $15.000 $12.000 $8.000 $15.000 $10.500 $10.000 $8.330 $15.000 $15.000
EXCAVATION (ROADWAY)
CY 159.000 $5.000 $66.000 $75.000 $25.000 $10.000 $50.000 $3.950 $20.000 $70.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,466.000 $25.000 $26.470 $75.000 $25.000 $28.000 $50.000 $7.260 $30.000 $70.000
BACKFILL (TY B)
STA 3.000 $155.000 $9,830.070 $1,000.000 $500.000 $750.000 $500.000 $386.400 $1,000.000 $3,000.000
COMPOST MANUF TOPSOIL (4")
SY 8,775.000 $1.750 $1.630 $1.500 $1.500 $2.400 $1.250 $0.910 $5.000 $2.500
BLOCK SODDING
SY 8,775.000 $2.710 $3.260 $3.250 $3.250 $3.300 $4.000 $2.990 $6.000 $3.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 8,775.000 $0.250 $0.220 $0.500 $0.250 $0.200 $0.180 $0.180 $1.000 $0.180
VEGETATIVE WATERING
MG 147.000 $25.000 $95.000 $50.000 $100.000 $50.000 $115.000 $127.850 $1.000 $30.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 932.000 $3.500 $3.150 $3.500 $3.000 $3.200 $3.150 $2.890 $4.000 $2.500
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
SY 2,282.000 $20.000 $18.990 $30.000 $60.000 $15.500 $35.000 $19.810 $35.000 $30.000
LIME (HYDRATED LIME (SLURRY))
TON 107.000 $250.000 $251.910 $220.000 $250.000 $200.000 $250.000 $218.110 $250.000 $250.000
LIME TRT (EXST MATL)(8")
SY 5,352.000 $3.000 $9.830 $6.000 $8.000 $5.000 $12.000 $9.350 $10.000 $20.000
PRIME COAT (MC-30)
GAL 1,239.000 $6.000 $3.900 $4.000 $5.000 $3.900 $3.760 $3.500 $10.000 $5.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 2,554.000 $90.000 $95.000 $103.000 $80.000 $95.000 $125.000 $90.000 $75.000 $123.000
CEM STABIL BKFL
CY 450.000 $87.000 $106.070 $220.000 $200.000 $124.000 $250.000 $153.780 $200.000 $200.000
TEMPORARY SPL SHORING
SF 1,120.000 $25.000 $30.350 $61.000 $40.000 $65.000 $55.000 $24.070 $50.000 $40.000
DRILL SHAFT (18 IN)
LF 156.000 $106.000 $125.000 $175.000 $125.000 $110.000 $100.000 $98.710 $100.000 $200.000
DRILL SHAFT (36 IN)
LF 1,164.000 $195.000 $232.000 $250.000 $300.000 $225.000 $200.000 $211.530 $195.000 $300.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 24.000 $250.000 $360.000 $255.000 $400.000 $365.000 $425.000 $298.000 $350.000 $270.000
CL C CONC (ABUT)(HPC)
CY 103.000 $1,200.000 $925.000 $1,500.000 $1,500.000 $1,100.000 $1,300.000 $1,761.960 $1,600.000 $2,500.000
CL C CONC (CAP)(HPC)
CY 65.800 $1,300.000 $1,600.000 $1,500.000 $1,500.000 $1,400.000 $2,000.000 $2,064.710 $1,600.000 $2,500.000
CL C CONC (COLUMN)(HPC)
CY 69.200 $1,050.000 $1,100.000 $1,200.000 $1,500.000 $1,200.000 $1,500.000 $1,537.920 $1,600.000 $2,500.000
REINF CONC SLAB (HPC)
SF 25,200.000 $26.000 $16.000 $21.000 $25.000 $21.000 $22.000 $22.810 $22.000 $40.000
BRIDGE SIDEWALK (HPC)
SF 7,000.000 $13.000 $11.700 $12.000 $15.000 $8.400 $13.000 $17.890 $25.000 $15.000
APPROACH SLAB (HPC)
CY 115.600 $695.000 $650.000 $900.000 $750.000 $620.000 $750.000 $772.920 $850.000 $775.000
PRESTR CONC GIRDER (TX54)
LF 4,101.000 $175.000 $200.000 $190.000 $225.000 $225.000 $300.000 $239.740 $315.000 $215.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 1,533.400 $271.490 $94.000 $155.000 $100.000 $100.000 $105.000 $180.090 $150.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $600.000 $450.000 $700.000 $500.000 $950.000 $800.000 $643.100 $550.000 $875.000
STR STEEL (MISC NON - BRIDGE)
LB 504.000 $18.000 $21.000 $30.000 $20.000 $17.500 $20.000 $27.340 $30.000 $20.000
RAIL (TY C402)(HPC)
LF 772.000 $141.920 $165.000 $275.000 $180.000 $185.000 $210.000 $177.660 $200.000 $235.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 143.000 $130.500 $148.000 $175.000 $150.000 $150.000 $125.000 $191.880 $150.000 $190.000
RAISING EXIST STRUCT
LS 1.000 $120,000.000 $100,000.000 $20,000.000 $40,000.000 $702,850.000 $95,000.000 $480,000.000 $150,000.000 $500,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $100,000.000 $192,578.590 $150,000.000 $250,000.000 $250,000.000 $210,000.000 $478,400.000 $200,000.000 $300,000.000
MOBILIZATION
LS 1.000 $440,000.000 $472,915.620 $500,000.000 $550,000.000 $560,450.000 $592,000.000 $575,000.000 $550,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $14,000.000 $7,000.000 $5,500.000 $4,000.000 $6,000.000 $14,700.000 $5,300.250 $10,000.000 $25,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $25.000 $29.000 $28.000 $30.000 $28.000 $28.280 $22.500 $5.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $10.000 $9.000 $9.000 $10.000 $7.800 $8.250 $12.000 $1.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,358.000 $3.000 $3.000 $5.000 $3.000 $2.700 $3.050 $1.700 $1.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,358.000 $1.100 $0.700 $2.000 $1.000 $0.550 $0.600 $0.250 $1.000 $0.250
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 12.000 $5.000 $12.000 $10.000 $20.000 $9.000 $21.000 $5.000 $10.000 $7.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 12.000 $1.000 $1.800 $5.000 $2.000 $1.900 $10.500 $1.000 $10.000 $1.000
CONSTRUCTING DETOURS
SY 156.000 $55.000 $363.050 $300.000 $225.000 $310.000 $300.000 $181.550 $600.000 $90.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,800.000 $50.000 $30.000 $55.000 $85.000 $32.000 $30.000 $44.020 $95.000 $80.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,260.000 $20.000 $3.600 $15.000 $10.000 $6.000 $10.000 $8.230 $12.000 $5.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,800.000 $20.000 $14.500 $20.000 $15.000 $9.000 $15.000 $7.590 $14.000 $5.000
CONC CURB & GUTTER (TY II)
LF 491.000 $20.000 $25.000 $55.000 $40.000 $30.000 $35.000 $28.240 $30.000 $45.000
DRIVEWAYS (ACP)
SY 714.000 $50.000 $98.000 $53.000 $60.000 $64.000 $55.000 $21.780 $65.000 $60.000
CONC SIDEWALKS (4")
SY 351.000 $50.000 $60.000 $88.000 $80.000 $80.000 $100.000 $55.910 $85.000 $80.000
CURB RAMPS (TY 10)
EA 8.000 $2,000.000 $2,000.000 $2,200.000 $2,000.000 $2,800.000 $4,000.000 $3,177.030 $3,000.000 $2,700.000
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $35.000 $35.000 $31.000 $30.000 $31.000 $31.500 $33.000 $30.000 $27.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,360.000 $3,200.000 $2,800.000 $2,000.000 $2,100.000 $3,150.000 $2,750.000 $2,000.000 $1,875.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $4,000.000 $3,500.000 $3,250.000 $3,600.000 $3,675.000 $3,850.000 $3,000.000 $3,175.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,000.000 $1,172.960 $1,500.000 $3,000.000 $1,000.000 $1,470.000 $1,050.000 $3,000.000 $1,800.000
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $350.000 $832.240 $1,000.000 $1,500.000 $750.000 $735.000 $745.000 $1,000.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $9,000.000 $9,417.180 $9,500.000 $10,000.000 $9,000.000 $9,450.000 $8,430.000 $10,000.000 $10,000.000
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
EA 1.000 $30,000.000 $32,500.000 $33,000.000 $32,500.000 $27,000.000 $31,500.000 $28,000.000 $35,000.000 $30,000.000
REMOVE RD IL ASM (TRANS-BASE)
EA 3.000 $500.000 $982.380 $1,100.000 $800.000 $900.000 $3,150.000 $758.000 $800.000 $435.000
IN RD IL (TY ST) 40T-10 (250W EQ) LED
EA 3.000 $6,000.000 $6,210.000 $5,800.000 $6,000.000 $6,400.000 $6,300.000 $5,345.000 $6,000.000 $5,365.000
CONDT (PVC) (SCH 80) (2")
LF 590.000 $15.000 $20.000 $16.000 $20.000 $21.000 $42.000 $17.000 $20.000 $28.600
ELEC CONDR (NO.6) BARE
LF 840.000 $2.000 $3.000 $3.000 $4.000 $3.000 $7.880 $2.500 $3.000 $2.650
ELEC CONDR (NO.6) INSULATED
LF 1,680.000 $2.500 $3.000 $3.000 $4.000 $3.000 $8.400 $2.500 $3.000 $2.750
GROUND BOX TY A (122311)W/APRON
EA 2.000 $800.000 $1,200.000 $1,400.000 $1,250.000 $1,200.000 $2,100.000 $2,366.240 $1,500.000 $2,225.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $820.000 $800.000 $730.000 $1,000.000 $900.000 $735.000 $731.500 $1,000.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $1,000.000 $900.000 $890.000 $1,250.000 $1,200.000 $845.000 $880.000 $1,500.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $900.000 $1,300.000 $1,200.000 $1,500.000 $1,500.000 $1,155.000 $1,210.000 $1,500.000 $1,300.000
REMOVE SM RD SN SUP&AM
EA 11.000 $100.000 $120.000 $145.000 $150.000 $120.000 $31.500 $104.500 $300.000 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 7.000 $20.000 $42.000 $22.000 $50.000 $23.000 $32.550 $39.600 $100.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $27.000 $36.000 $44.000 $50.000 $46.000 $52.500 $35.200 $30.000 $200.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $200.000 $190.000 $165.000 $200.000 $170.000 $160.650 $187.000 $150.000 $150.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 7,894.000 $0.750 $1.150 $1.250 $1.250 $1.100 $1.080 $1.000 $1.000 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,856.000 $0.750 $1.150 $1.250 $1.250 $1.100 $1.080 $1.000 $1.000 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 60.000 $3.000 $5.740 $5.500 $4.000 $4.000 $5.380 $5.000 $5.000 $5.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 45.000 $4.000 $5.740 $5.500 $4.000 $4.000 $5.380 $5.000 $5.000 $5.000
PAVEMENT SEALER 4"
LF 5,938.000 $0.200 $0.230 $0.250 $0.250 $0.250 $0.220 $0.200 $0.250 $0.200
PAVEMENT SEALER 12"
LF 45.000 $0.500 $3.500 $3.500 $2.000 $2.100 $3.230 $3.000 $2.000 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,230.000 $0.450 $1.150 $1.250 $1.000 $0.900 $1.080 $1.000 $1.000 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 4,429.000 $0.400 $1.150 $1.250 $1.000 $0.850 $1.080 $1.000 $1.000 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 5,550.000 $0.400 $1.150 $1.250 $1.000 $0.850 $1.080 $1.000 $1.000 $1.000
REFL PAV MRKR TY I-C
EA 64.000 $4.000 $8.100 $8.000 $8.000 $5.400 $7.530 $7.000 $5.000 $7.000
REFL PAV MRKR TY II-A-A
EA 78.000 $5.000 $8.100 $8.000 $8.000 $5.400 $7.530 $7.000 $5.000 $7.000
ELIM EXT PAV MRK & MRKS (4")
LF 16,262.000 $0.400 $0.400 $0.500 $0.750 $0.650 $0.380 $0.350 $0.700 $0.350
PAV SURF PREP FOR MRK (4")
LF 5,938.000 $0.150 $0.230 $0.500 $0.100 $0.050 $0.220 $0.200 $0.100 $0.200
TREE TRIMMING / BRUSH REMOVAL
MI 0.214 $20,000.000 $12,000.000 $500,000.000 $100,000.000 $20,000.000 $105,000.000 $50,000.000 $100,000.000 $30,000.000
TREE REMOVAL (36" - 42" DIA)
EA 5.000 $3,500.000 $6,000.000 $5,000.000 $2,000.000 $3,600.000 $2,100.000 $6,000.000 $5,000.000 $1,000.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 1,111.000 $130.000 $122.000 $121.000 $140.000 $125.000 $130.000 $110.000 $140.000 $110.000
SP MIXES SP-D SAC-A PG70-22
TON 996.000 $170.000 $152.000 $151.000 $150.000 $155.000 $165.000 $138.000 $140.000 $138.000
TACK COAT
GAL 544.000 $3.250 $3.810 $4.000 $5.000 $3.900 $3.250 $4.290 $6.000 $3.500
INSTALL FTB
LF 142.000 $45.000 $100.000 $75.000 $80.000 $100.000 $82.540 $49.230 $50.000 $80.000
REMOVE FTB
LF 142.000 $5.000 $16.000 $30.000 $15.000 $11.000 $13.950 $4.350 $10.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $24,000.000 $20,000.000 $17,500.000 $15,000.000 $17,500.000 $18,427.150 $32,000.000 $15,000.000
TMA (STATIONARY)
DAY 222.000 $200.000 $350.000 $100.000 $75.000 $180.000 $157.500 $321.300 $200.000 $100.000
TMA (MOBILE OPERATION)
DAY 4.000 $350.000 $475.000 $250.000 $500.000 $750.000 $735.000 $521.670 $250.000 $1,200.000
Totals: $4,931,327.756 $4,761,917.350 $5,261,522.000 $5,447,050.300 $5,604,599.350 $5,919,659.810 $5,946,730.290 $6,114,341.700 $7,282,504.900